Category:CORRESPONDENCE-LETTERS
MONTHYEARML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206G6611999-05-0404 May 1999 Forwards SE Accepting GL 88-20,submitted by TVA Re multi-unit Probabilistic Risk Assessement (Mupra) for Plant, Units 1,2 & 3 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 DD-99-06, Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 9904281999-04-28028 April 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 990428 ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20217H6401997-10-0808 October 1997 Informs That Generic Fundamentals Exam Was Administered to Six Bfnp Personnel on 971008,IAW Nrc'S Instruction.W/Listed exam-related Matls.W/O Encls ML18038B9271996-05-13013 May 1996 Forwards Rev 1 of Plant,Unit 2 Probabilistic Safety Assessment Rept. ML20115D5531992-10-13013 October 1992 Forwards Comments on Generic Fundamentals Exam,Per NUREG-1021-ES-201,administered on 921007 ML18033B2191990-03-20020 March 1990 Forwards Revised Form 2C,Page 3 of Plant NPDES Permit Renewal Application Submitted on 890110.Page Revised to Include Potential for Discharge of Asbestos to Sewage Lagoon from Insulator Showers ML18033A9971989-10-19019 October 1989 Responds to 890912 Ltr Re 890928 Performance Audit Insp of NPDES Permit.Discharge Piping Buried in Concrete Which Makes Retrofitting for Alternative Flow Measurement Instrumentation Impractical ML18033A8961989-08-11011 August 1989 Responds to 890718 Request Re Results of 890628 Performance Audit Insp ML18033A8481989-07-26026 July 1989 Comments on Draft NPDES Permit AL0022080,per 890720 & 21 Telcons.Util Continues to Request Approval to Reroute 107 & 110 to Dsn 111 in Order to Provide Buffer Between Discharges & Tennessee River ML18033A5101989-01-10010 January 1989 Forwards EPA Forms 3510-1 & 3510-2C for Renewal of NPDES Permit AL0022080.Requests That Noted Changes Be Included in Reissued NPDES Permit ML18033A3771988-09-19019 September 1988 Responds to 880830 Ltr Re Addl Regulations for Facilities Having Landfill Disposal Permits.Wastes Not Specified by Permit Handled in Accordance W/Encl Procedure & Managed as Hazardous Waste.W/O Encl ML18033A3741988-09-15015 September 1988 Notifies That Use of Sodium Nitrite as Corrosion Inhibitor Identified at Plant.Ongoing Maint Identifies Possibility That Leaks in Air Conditioning Sys Will Allow Discharge of Sodium Nitrite at Low Levels.Leaks Will Be Monitored ML18033A3011988-07-28028 July 1988 Notifies That Leak of Sodium Nitrite from Plant Control Bay Chillers Identified on 880630.No Further Chemical Additions Were Made & Immediate Steps Taken to Identify Location of Leak & Repair Chillers ML20151K4921988-07-28028 July 1988 Notifies That Sedimentation Pond Rept Scheduled to Be Submitted on 880729 Will Be Submitted by 880901 Due to Improper Priority Assignment ML18033A2561988-06-23023 June 1988 Responds to 880610 Notice of Violation of Biochemical Oxygen Demand Permit Limits During Mar 1988.Corrective Actions: Personnel Will Continue to Trend Lagoon Data to Predict & Attempt to Prevent Recurrence of Discharge ML20148J3281988-03-25025 March 1988 Advises That Repairs to Sedimentation Pond Now Finished But Testing Has Not Yet Been Completed.Rept Will Be Submitted by 880515 Rather than 880401 ML20138F5891985-10-18018 October 1985 Forwards Revised Discharge Monitoring Rept for Aug 1985. Original Submission Indicated Min Ph of 7.2 Which Is Incorrect Rounding Off of True Min Ph of 7.62 ML20107J4961984-10-29029 October 1984 Forwards Revised NPDES Discharge Monitoring Repts for Aug 1984.Revs Required Due to Typo & Transpositional Errors ML20087G5621984-03-12012 March 1984 Submits Addl Info on Util Initiatives in Pra,Per Response to .Effort to Reduce Number of Violations & Risks Maintained ML20083J4871983-12-29029 December 1983 Designates MP Schmierback,Rj Johnson & DM Mccarthy as Acting Officials During Author Absence ML20064F5201982-12-30030 December 1982 Notifies of NPDES Noncompliance:On 821123,sewage Treatment Plant Effluent Grab Sample Collected 821116 Exceeded Limitation of 45 Mg/L.Caused by Sys Overload Due to Excessive & Surging Flow.Design Changes Being Reviewed ML20040C3871982-01-22022 January 1982 Notifies of Noncompliance W/Npdes Permit Limitations.On 820118,laundry Draining Tank Discharge Sample Exceeded Daily Max Limit for Suspended Solids.Caused by Filtration Sys Failure.Tank Contents Reprocessed ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20040C2151981-12-17017 December 1981 Notifies of Noncompliance W/Effluent Limitations.Samples Collected on 811209 Exceeded Permit Limitations.Caused by Sewage Treatment Sys Overload & Lack of Chlorination.Faulty Equipment Replaced ML18025B6661981-10-0707 October 1981 Confirms Request for Amend to ANI Policies NF-198,NF-247, NF-256,NF-258 & Maelu Policies MF-66 & MF-102 ML20126M1921981-06-0505 June 1981 Forwards Two Sets of EPA Form 3510-1 & 3510-2C,Section 5, Per Discussion W/C Kaplan.Priority Pollutant Data for Current Outfall Will Be Provided by Sept 1981.Requests That Info Be Included in New 5-yr NPDES Permit ML20126J5171981-04-16016 April 1981 Submits Notification of Noncompliance W/Effluent Limitation. Sample of Suspended Solids Collected 810407 Exceeded Max Permit Limitation.Caused by Poor Flow Equalization,Increased Flows & Loadings & Insufficient Aeration.Mods Underway ML20126J5121981-03-26026 March 1981 Submits Notification of Noncompliance W/Effluent Limitation. Samples Collected from Radwaste Discharge Sys on 810319 Contained Oil & Grease Exceeding Max Permit Limitation.Cause Unknown.Laundry Drain Tank Contents Reprocessed ML19347D3821981-03-12012 March 1981 Discusses Reinstatement of Temporary Relief from 5 F Reservoir Temp Rise Limit at Facilities.Requests Mod of Variance to Allow Full Operation of Facilities w/8.5 F River Temp Rise Limitation ML19341A1801981-01-15015 January 1981 Grants Request for Temporary Relief from Permit Conditions Re Allowable Temp Rise within Certain Conditions.Temp at Edge of Mixing Zone Must Not Exhibit Change Greater than 8.5 F ML19341A2301981-01-14014 January 1981 Requests Temporary Relief from 5 F Thermal Rise Limit & That Max Reservoir Temp Rise of 8.5 F Be Granted Until Apr 1981. Temp Rise of 8.5 F Will Sustain 3-unit Operation at Facility W/Current Min Hydro Releases for Navigation ML18025A8101980-04-17017 April 1980 Advises That Section 316 Documents Re Nnpdes Permit AL0022080 Are Being Sent to JW Warr,H Zeller & LB Tebo,In Accordance W/Util 800331 Ltr 1997-10-08
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML18033B2191990-03-20020 March 1990 Forwards Revised Form 2C,Page 3 of Plant NPDES Permit Renewal Application Submitted on 890110.Page Revised to Include Potential for Discharge of Asbestos to Sewage Lagoon from Insulator Showers ML18033A9971989-10-19019 October 1989 Responds to 890912 Ltr Re 890928 Performance Audit Insp of NPDES Permit.Discharge Piping Buried in Concrete Which Makes Retrofitting for Alternative Flow Measurement Instrumentation Impractical ML18033A8961989-08-11011 August 1989 Responds to 890718 Request Re Results of 890628 Performance Audit Insp ML18033A8481989-07-26026 July 1989 Comments on Draft NPDES Permit AL0022080,per 890720 & 21 Telcons.Util Continues to Request Approval to Reroute 107 & 110 to Dsn 111 in Order to Provide Buffer Between Discharges & Tennessee River ML18033A5101989-01-10010 January 1989 Forwards EPA Forms 3510-1 & 3510-2C for Renewal of NPDES Permit AL0022080.Requests That Noted Changes Be Included in Reissued NPDES Permit ML18033A3771988-09-19019 September 1988 Responds to 880830 Ltr Re Addl Regulations for Facilities Having Landfill Disposal Permits.Wastes Not Specified by Permit Handled in Accordance W/Encl Procedure & Managed as Hazardous Waste.W/O Encl ML18033A3741988-09-15015 September 1988 Notifies That Use of Sodium Nitrite as Corrosion Inhibitor Identified at Plant.Ongoing Maint Identifies Possibility That Leaks in Air Conditioning Sys Will Allow Discharge of Sodium Nitrite at Low Levels.Leaks Will Be Monitored ML18033A3011988-07-28028 July 1988 Notifies That Leak of Sodium Nitrite from Plant Control Bay Chillers Identified on 880630.No Further Chemical Additions Were Made & Immediate Steps Taken to Identify Location of Leak & Repair Chillers ML20151K4921988-07-28028 July 1988 Notifies That Sedimentation Pond Rept Scheduled to Be Submitted on 880729 Will Be Submitted by 880901 Due to Improper Priority Assignment ML18033A2561988-06-23023 June 1988 Responds to 880610 Notice of Violation of Biochemical Oxygen Demand Permit Limits During Mar 1988.Corrective Actions: Personnel Will Continue to Trend Lagoon Data to Predict & Attempt to Prevent Recurrence of Discharge ML20148J3281988-03-25025 March 1988 Advises That Repairs to Sedimentation Pond Now Finished But Testing Has Not Yet Been Completed.Rept Will Be Submitted by 880515 Rather than 880401 ML20138F5891985-10-18018 October 1985 Forwards Revised Discharge Monitoring Rept for Aug 1985. Original Submission Indicated Min Ph of 7.2 Which Is Incorrect Rounding Off of True Min Ph of 7.62 ML20107J4961984-10-29029 October 1984 Forwards Revised NPDES Discharge Monitoring Repts for Aug 1984.Revs Required Due to Typo & Transpositional Errors ML20087G5621984-03-12012 March 1984 Submits Addl Info on Util Initiatives in Pra,Per Response to .Effort to Reduce Number of Violations & Risks Maintained ML20083J4871983-12-29029 December 1983 Designates MP Schmierback,Rj Johnson & DM Mccarthy as Acting Officials During Author Absence ML20064F5201982-12-30030 December 1982 Notifies of NPDES Noncompliance:On 821123,sewage Treatment Plant Effluent Grab Sample Collected 821116 Exceeded Limitation of 45 Mg/L.Caused by Sys Overload Due to Excessive & Surging Flow.Design Changes Being Reviewed ML20040C3871982-01-22022 January 1982 Notifies of Noncompliance W/Npdes Permit Limitations.On 820118,laundry Draining Tank Discharge Sample Exceeded Daily Max Limit for Suspended Solids.Caused by Filtration Sys Failure.Tank Contents Reprocessed ML18025B7061982-01-16016 January 1982 Requests NPDES Aquatic Monitoring Program - Plankton Entrainment Study Be Deleted from Monitoring Program.Based on Extensive Studies at Browns Ferry & Lack of Expected Effects at Sequoyah,Entrainment Should Be Inconsequential ML20040C2151981-12-17017 December 1981 Notifies of Noncompliance W/Effluent Limitations.Samples Collected on 811209 Exceeded Permit Limitations.Caused by Sewage Treatment Sys Overload & Lack of Chlorination.Faulty Equipment Replaced ML18025B6661981-10-0707 October 1981 Confirms Request for Amend to ANI Policies NF-198,NF-247, NF-256,NF-258 & Maelu Policies MF-66 & MF-102 ML20126M1921981-06-0505 June 1981 Forwards Two Sets of EPA Form 3510-1 & 3510-2C,Section 5, Per Discussion W/C Kaplan.Priority Pollutant Data for Current Outfall Will Be Provided by Sept 1981.Requests That Info Be Included in New 5-yr NPDES Permit ML20126J5171981-04-16016 April 1981 Submits Notification of Noncompliance W/Effluent Limitation. Sample of Suspended Solids Collected 810407 Exceeded Max Permit Limitation.Caused by Poor Flow Equalization,Increased Flows & Loadings & Insufficient Aeration.Mods Underway ML20126J5121981-03-26026 March 1981 Submits Notification of Noncompliance W/Effluent Limitation. Samples Collected from Radwaste Discharge Sys on 810319 Contained Oil & Grease Exceeding Max Permit Limitation.Cause Unknown.Laundry Drain Tank Contents Reprocessed ML19347D3821981-03-12012 March 1981 Discusses Reinstatement of Temporary Relief from 5 F Reservoir Temp Rise Limit at Facilities.Requests Mod of Variance to Allow Full Operation of Facilities w/8.5 F River Temp Rise Limitation ML19341A1801981-01-15015 January 1981 Grants Request for Temporary Relief from Permit Conditions Re Allowable Temp Rise within Certain Conditions.Temp at Edge of Mixing Zone Must Not Exhibit Change Greater than 8.5 F ML19341A2301981-01-14014 January 1981 Requests Temporary Relief from 5 F Thermal Rise Limit & That Max Reservoir Temp Rise of 8.5 F Be Granted Until Apr 1981. Temp Rise of 8.5 F Will Sustain 3-unit Operation at Facility W/Current Min Hydro Releases for Navigation ML18025A8101980-04-17017 April 1980 Advises That Section 316 Documents Re Nnpdes Permit AL0022080 Are Being Sent to JW Warr,H Zeller & LB Tebo,In Accordance W/Util 800331 Ltr 1990-03-20
[Table view] |
Text
AC CElZRATED D1 BU'DON DEMONS ON SYSTEM~-t 4 h~'I (c~.REGULATOR'g INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8908220123 DOC.DATE: 89/08/11 NOTARIZED:
NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION SCHMIERBACH,M.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION PIZNAR,T.G.
Alabama, State of
SUBJECT:
Responds to 890718 request re results of 890628 performance audit insp.DOCKET 05000259 05000260 05000296 DISTRIBUTION CODE: C001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Licensing Submittal:
Environmental Rept Amdt&Related Correspondence NOTES:1 Copy each to: B.Wilson,D.M.Crutchfield,B.D.Liaw,S.Black 05000259 I R.Pierson, 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, 05000260~R.Pierson,B.Wilson 1 Copy each to: S.Black,D.M.Crutchfield,B.D.Liaw, 05000296 D R.Pierson,B.Wilson RECIPIENT ID CODE/NAME SIMMS,M GEARS,G INTERNAL: ACRS NRR/DEST/SGB 8D NUDOCS-ABSTRACT OGC/HDS2 RGN2 DRSS/RPB EXTERNAL EGGG S I MPSON I F NRC PDR NOTES COPIES LTTR ENCL 3 3 1 1 6 6 1 1 1 1 1 0 2 2 2 2 1 1 5 5 RECIPIENT ID CODE/NAME PD RE FI 01 LPDR NSIC AEOD/DSP/TPAB NRR/DREP/RPB 1 0 COPIES LTTR ENCL 1 1 1 1 2 2 1 0 1'1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29
1 TENN ESSEE VALLEY AUTHORITY KNOXVILI E.TENNESSEE 37902 Nrs.Treena G.Piznar Environmental Engineer Industrial Branch Water Division Alabama Department of Environmental Nanagement 1751 Federal Drive Nontgomery, Alabama 36130
Dear Nrs.Piznar:
AUG 11 agog TEHHESSEE VALLEY AUTHORITY-BROWNS FERRY NUCLEAR PLANT (BFN)-NATIONAL POLLUTANT DISCHARGE ELININATION SYSTEN PERNIT NO.AL0022080-PERFORNAHCE AUDIT, INSPECTION (PAI)
REFERENCE:
LETTER, TREENA G.PIZNAR TO N.PAUL SCHNIERBACH, JULY 18, 1989 This is in response to the referenced letter providing results of the June 28 PAI conducted at BFN by your staff.Enclosed is our response to the findings noted in your PAI report.If you have questions or need additional information, please call Abraham H.Loudermi 1k, Jr., at (615)632-6656 in Knoxville, Tennessee.
Sincerely, N.Pau Schmierbach, Nanager Environmental guality Enclosure cc (Enclosure):
Nr.Bruce R.Barrett, Director Water Nanagement Division U.S.Environmental Protection Agency Region IV 345 Courtland Street, NE.Atlanta, Georgia 30365 Ns.S.C.Black, Assistant Director for Projects TVA Projects Division Office of Special Projects U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockvi lie Pike Rockville, Naryland 20852 Continued on page 2 8908220i23 8908ii PDR ADOCK 05000255'PDC'V I An Equal Oppor Iunil v I-mploycr 0'I Nrs.Treena G.Pi znar TENNESSEE VALLEY AUTHORITY-BROWNS FERRY NUCLEAR PLANT (BFN)-NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERHIT NO.AL0022080-PERFORMANCE AUDIT INSPECTION (PAI)cc (Enclosure):
Nr.F.R.NcCoy, Assistant Director for Inspection Programs TVA Projects Divis.ion U.S.Nuclear Regulatory Commission Region II 101 Marietta Street, HW., Suite 2900 Atlanta, Georgia 30323 Attention:
Document Control Desk Washington, D.C.20555
~~
ENCLOSURE TENNESSEE VALLEY AUTHORITY RESPONSES PERFORMANCE AUDIT INSPECTION REPORT OF BROWNS FERRY NUCLEAR PLANT (BFN)~Findin 1 The condenser tube pullout area has been addressed in the current National Pollutant Discharge Elimination System (HPDES)permit renewal application.
It should be noted that this discharge was identified in the 1979 permit and later removed in the 1984 permit when it was determined that the area would not be used.Subsequently, activities resumed in November 1986, at which time BFH resumed sampling and analysis on each batch discharged, which continues today.~Findhn 2 As a part of the HPDES renewal package TVA has requested that Discharge Serial Numbers (DSNs)107 and 110 be routed to the sewage lagoon (DSN ill), which, if approved, will eliminate the need for flow measurement of these waste streams.101-Diffuser Discharge Structure Flow-Each condenser cooling water pump has been recently rebuilt.The pump ratings will be calibrated before unit operation and annually thereafter.
102-Sedimentation Pond Effluent-an ISCO series 2300 flow metering device has been purchased and was used to measure flow when the sedimentation pond was in operation.
103 and 104-Units 1/2/3 Turbine Building Sumps and Liquid Radwaste Effluent-BFH is presently investigating several alternatives for providing more accurate flow measurement capabilities at this DSN.ill-Treated Domestic Waste-a"V" notch weir and ISCO series 2300 flow measuring unit are presently being used at this DSH.~Fin din 3 In addition to the temperature measurement methodology observed by the inspector, instrumentation presently exists in the main control room at BFN which measures and records temperature on a continuous basis at DSN 105.These measurements are made on the exit of the residual heat removal heat exchanger prior to entering the Tennessee River.