Ltr 03/28/18 Clinton Power Station - Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010
ML18088A566
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/28/2018
From: Shaikh A A
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co
References
IR 2018010
Download: ML18088A566 (6)


See also: IR 05000461/2018010

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 March 28, 2018 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: CLINTON POWER STATIONINFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION 05000461/2018010 Dear Mr. Hanson: On July 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of the Code of Federal Regulations, Part 50.59, (Evaluation of Changes, Tests and Experiments), Baseline Inspection at the Clinton Power Station. This inspection will be performed in accordance with the NRC Baseline Inspection Procedure 71111.17T. The onsite portions of the inspection will take place on July 30August 3, 2018. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc and delivered to the regional office no later than June 1, 2018. The inspection team will review this information and, by June 15, 2018, will request specific items that should be provided for review in the regional office by July 13, 2018. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by July 13, 2018, as identified above. The remaining documents should be available by the first day of the onsite inspection, July 30, 2018. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact for this inspection is Nicholas Santos of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9824 or via e-mail at Atif.Shaikh@nrc.gov.

B. Hanson -2- This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely, /RA/ Atif Shaikh, Senior Inspector Engineering Branch 3 Division of Reactor Safety Docket No. 50461 License No. NPF62 Enclosure: Document Request for 10 CFR 50.59 Inspection cc: Distribution via LISTSERV

B. Hanson -3- Letter to Bryan C. Hanson from Atif Shaikh dated March 28, 2018 SUBJECT: CLINTON POWER STATIONINFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION 05000461/2018010 DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRSIII DRPIII ADAMS Accession Number ML: 18088A566 OFFICE RIII RIII RIII RIII NAME AShaikh:cl DATE 03/28/18 OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 10 CFR 50.59 INSPECTION Inspection Report: 05000461/2018010 Inspection Dates: July 30August 3, 2018 Inspection Procedure: IP 71111.17TEvaluations of Changes, Tests and Experiments Lead Inspector: Atif Shaikh 630-829-9824 Atif.Shaikh@nrc.gov I. Information Requested for In-Office Preparation Week The following information is requested by June 1, 2018, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspection team will select specific items from the information requested below and submit a list to your staff by June 15, 2018. We will request that certain items be made available to the regional office prior to the inspection by July 13, 2018. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last 50.59 inspection to the present. The required information identified below should be provided on compact disc (CD) or uploaded to accessible links. Please provide three copies of each CD submitted (i.e., one for each inspector, if applicableThe CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible. (1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine operating configurations, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following: a. Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59 inspection; b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

DOCUMENT REQUEST FOR 10 CFR 50.59 INSPECTION (2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). (3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply. (4) A list of calculation changes that have been issued for use. (5) A list of corrective action documents (open and closed) that address 10 CFR 50.59 issues, concerns, or processes. These documents should also include the associated corrective action documents and the 50.59 change implementation. The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance. (6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates. (7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.(8) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal. (8) Electronic copy of the UFSAR and Bases, and technical specifications, if available. (9) Name(s) and phone numbers for the regulatory and technical contacts. (10) Current management and engineering organizational chart. II. Information requested to be available prior to inspection. Requests will be made for specific item (1) documents by June 15, 2018, for availability of requested item (1) documents in regional office by July 13, 2018, and items (2), (3) and (4) documents on first day of inspection (July 30, 2018). (1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents. (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.

DOCUMENT REQUEST FOR 10 CFR 50.59 INSPECTION a. Updated Final Safety Analysis Report , if not previously provided; b. Original Final Safety Analysis Report Volumes; c. Original Safety Evaluation Report and Supplements; d. Final Safety Analysis Report Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The latest 10 CFR 50.59 UFSAR Update Submittal. (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are: a. Drawings supporting the modifications; b. Procedures affected by the modifications; and c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. (4) Assessment and Corrective Actions: a. The most recent MOD/50.59 Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance audit and/or self-assessment. III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member). If you have any questions regarding the information requested, please contact the inspection team leader.