MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24283A1662024-10-23023 October 2024 Enclosure 2 Clinton Audit Summary RCI and RAIs ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24222A4092024-05-0303 May 2024 NRR E-mail Capture - Request for Additional Information Regarding Reactor Water Cleanup (RWCU) Pump Rooms - L-2023-LLA-0118 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection IR 05000461/20234012022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 ML22255A1402022-09-12012 September 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21204A0152021-07-23023 July 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2021004 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21026A0582021-01-25025 January 2021 Notification of NRC Supplemental Inspection (95001) and Request for Information ML20315A0642020-11-0909 November 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000461/2021010 ML20307A6592020-10-27027 October 2020 NRR E-mail Capture - Request for Additional Information Regarding TSTF-505 and 50.69 Applications ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20128J8642020-05-0707 May 2020 NRR E-mail Capture - Preliminary RAIs for Clinton Load Tap Changer License Amendment Request ML20105A1082020-04-14014 April 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-01 ML20091F7892020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-05 ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18225A2882018-08-13013 August 2018 Ltr. 08/13/18 Clinton Power Station - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000461/2018011 (DRS-B.Jose) ML18214A4452018-08-0202 August 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18193A9732018-07-12012 July 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17276B7632017-10-0303 October 2017 NRR E-mail Capture - Clinton Power Station - Request for Additional Information Regarding License Amendment Request Related to Reactor Pressure Vessel Water Inventory Control ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17125A3212017-05-0202 May 2017 NRR E-mail Capture - Clinton Power Station, Unit 1 - Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing ML16356A0422016-12-20020 December 2016 Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000461/2017008 (Dxs) ML16130A6642016-05-11011 May 2016 Request for Additional Information Related to Incorporation of Revised Alternative Source Term (CAC No. MF7336)(RS-16-019) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15106A9282015-04-24024 April 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment ML15068A4212015-04-16016 April 2015 Request for Additional Information Regarding Relief Request 13R-11 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 11, 2016 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO INCORPORATION OF REVISED ALTERNATIVE SOURCE TERM (CAC NO. MF7336)(RS-16-019)
Dear Mr. Hanson:
By application dated January 29, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 116029A418), Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Clinton Power Station, Unit 1 (CPS). The proposed amendment revises the post- loss-of-coolant-accident (LOCA) drawdown time for secondary containment from 12 to 19 minutes as described in the CPS updated safety analysis report and technical specification bases.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on May 6, 2016, it was agreed that you would provide a response 30 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the agreed upon response date the NRC staff may be unable to support your requested schedule.
B. Hanson Should you have questions, please feel free to contact me at (301) 415-2315.
Sincerely, IRA/
Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION INCORPORATION OF REVISED ALTERNATIVE SOURCE TERM CLINTON POWER STATION (CPS), UNIT 1 DOCKET NO. 50-461
- 1. Section 3.2 of the attachment to the January 29, 2016, submittal, states:
In addition, actual SGTS [standby gas treatment system] train performance history during TS [technical specification] 3.6.4.1.4 Secondary Containment drawdown surveillances indicates that the required negative pressure equivalent to Y-i inch of water is achieved in approximately one half of the procedural acceptance criteria of 78 seconds. This acceptance criteria is based on the required drawdown time, without the post-LOCA [loss of coolant accident] heat loads. Although this surveillance is conducted with normal operating conditions (i.e., as opposed to LOCA conditions),
the margin from the acceptance criteria of 78 seconds to the analytical drawdown time provides additional assurance that SGTS will achieve the required negative pressure within 19 minutes following a LOCA, assuming a fully loaded design basis cask in the FB [Fuel Building].
- a. Describe the relative contributions to the increased analytical drawdown time from the additional heat load in the railroad bay and the portion attributable to the addition of the railroad bay volume. Describe how the procedure acceptance criterion of 78 seconds was derived. Discuss the relationship between the analytical drawdown time and the procedure acceptance criterion/criteria. Address whether the assumed post-LOCA heat loads account for all the difference between the alternate source term (AST) assumed drawdown times and the surveillance procedure acceptance criteria of 78 seconds.
- b. Address whether the acceptance criteria of 78 seconds will continue to be used for both the test not including the railroad bay volume, and the test including the railroad bay volume.
- c. As stated above, the actual drawdown time is identified as about one-half the 78 second acceptance criteria. Clarify whether a drawdown time test has been performed for the railroad bay volume included configuration. If so, address the amount of additional drawdown time observed as a result of including the railroad bay volume. If no test was performed and the railroad volume is intended to be assumed included for this analyses, address the amount the test conditions drawdown time is expected to change with the additional volume.
Enclosure
- 2. In Chapter 6.2.3.3.1 of the updated safety analysis report (USAR), the licensee stated that calculations indicate that the standby gas treatment fan has been adequately sized to achieve a 0.25-inch water gauge negative pressure in less than 12 minutes after the LOCA event. The licensee is proposing to increase the drawdown time for secondary containment from the current licensing basis value of 12 minutes to 19 minutes.
- a. Address whether this change in parameters and operation will impact the emergency diesel generators (EDGs) capability and capacity.
- b. Address whether any other loads are being added to the EDGs. If so, describe their impact on the capability and capacity of the EDGs. Also, describe changes, if any, being made to the EOG loading sequence to support the licensee amendment request. Explain if any loading change will impact the design margin of the EDG.
- c. Address whether any nonsafety-related systems and components are credited in the alternative source term (AST) analyses. If so, describe the independence (electrical and physical separation) of these nonsafety-related systems from the safety-related systems. Provide a discussion on why a fault on the non-Class 1E electrical circuit will not propagate to the Class 1E electrical circuit.
- 3. Address whether there is a change of equipment qualification (EQ) profile, by responding to the following:
- a. Provide a list and description of components being added to your Section 50.49 to Title 10 to the Code of Federal Regulations (10 CFR) program due to this revised AST dose calculation in the license amendment request (LAR). Confirm that these components are qualified for the environmental conditions they are expected to be exposed.
- b. In Enclosure 5 of the January 29, 2016, submittal, the licensee stated that its evaluation identified temperature increases in various areas within 15 of 20 secondary containment environmental zones. For the 15 environmental zones affected provide, in table form, a list of all the EQ components affected and their respective qualification levels and parameters (i.e., temperature, pressure, and radiation) that shows that the EQ limits remain bounding under the revised AST conditions for normal operation, accident (LOCA), and post-accident. Include the existing EQ limits and show how EQ margins (e.g., temperature, pressure, radiation, etc.) are being maintained.
- c. Provide pre- and post-AST implementation figures of the worst-case accident EQ temperature and pressure profiles for all the affected EQ zones, which demonstrate that the post AST profile is bounding.
- d. Provide revised environmental zone map(s) of the secondary containment that show all the affected environmental zones.
- e. In Chapter 3.11.9 of the USAR, the licensee stated that the CPS areas containing Class 1E equipment are divided into two zones based on the environmental conditions that are expected to occur as a result of various plant events. These zone classifications are termed harsh and mild environmental zones. Address whether there are any reclassifications of the EQ equipment due to the revised AST.
- 4. On page 4 of the Attachment of the January 29, 2016, submittal, Section 3.1, the licensee stated that in the previous AST LAR the licensee used an AST methodology for design basis accidents, in accordance with 10 CFR 50.67, with the exception that Technical Information Document (TIO) 14844 "Calculation of Distance Factors for Power and Test Reactor Sites," continued to be used as the radiation dose basis for equipment environmental qualification. On page 2 of the Attachment of the January 29, 2016, submittal, Section 1. 0, the licensee stated that evaluations were conducted to validate that the proposed configuration complies with the applicable general design criteria contained in Appendix A to10 CFR 50, as well as the requirements of 10 CFR 50.49, "Environmental qualification of electric equipment important to safety for nuclear power plants, "10 CFR 50.67, and Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors." Address whether the radiation dose basis for EQ of safety-related equipment will continue to be based on TID-14844, assumptions.
- 5. In a letter dated November 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15313A464), the NRC staff issued an integrated inspection report for CPS. The report documents that the inspectors reviewed Engineering Change (EC) 395976, "ISFSl-Extended Secondary Containment Boundary to FB Outer Railroad Bay Doors," Revision 0. This engineering change established the boundary of the secondary containment to include the FB railroad bay airlock. The NRC staff issued a finding for failure to obtain a license amendment prior to making modifications to secondary containment. Address whether the secondary containment has been changed to include the FB railroad bay airlock. If so, describe the impact on the EQ components in the FB railroad bay airlock and whether there is any change in seismic qualification of the affected equipment.
B. Hanson Should you have questions, please feel free to contact me at (301) 415-2315.
Sincerely, IRA/
Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 Resource RidsNsirDprDdep Resource RidsNrrDeEeeb Resource DHoang, NRR RidsNrrLASRohrer Resource MChernoff, NRR RidsNrrDssScvb Resource JBettle, NRR RidsRg3MailCenter Resource SBasturescu, NRR RidsNrrDeEmcb Resource JParillo, NRR RidsNrrDraArcb Resource MNorris, NSIR ADAMS Access1on No. ML16130A664 *b memo d at edApn'119 ' 2016 OFFICE LPL3-2/PM LPL3-2/LA EE EB/BC* SCVB/BC LPL3-2/BC(A)
NAME EBrown SRohrer JZimmerman RDennig* GMiller DATE 5/10/16 5/9/16 4/19/16 4/7/16 5/11/16 OFFICIAL RECORD COPY