UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 March 15, 2016
SUBJECT:
CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1AND2-REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE THE REACTOR STEAM DOME PRESSURE IN TECHNICAL SPECIFICATION 2.1.1, "REACTOR CORE SLs" (CAC NOS. MF6640-MF6644)
Dear Mr. Hanson:
By application dated August 18, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15231A097), Exelon Generation Company, LLC (the licensee) requested a change to the facility operating licenses for Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; and Quad Cities Nuclear Power Station, Units 1 and 2. The proposed change reduces the reactor steam dome pressure specified in Technical Specification 2.1.1, "Reactor Core SLs [Safety Limits]," for each of these facilities.
The U.S. Nuclear Regulatory Commission has reviewed the application and determined that it needs additional information to complete its review. A response to the enclosed request for additional information is requested to be provided within 30 days from the date of this letter.
Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
Docket Nos.
50-461, 50-237, 50-249, 50-254, and 50-265 Sincerely, Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE REACTOR STEAM DOME PRESSURE IN SAFETY LIMITS CLINTON POWER STATION, UNIT NO. 1 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-461, 50-237, 50-249, 50-254, AND 50-265 By application dated August 18, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15231A097), Exelon Generation Company, LLC (the licensee) requested a change to the facility operating licenses for Clinton Power Station (CPS),
Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; and Quad Cities Nuclear Power Station, Units 1 and 2. The proposed change revises the reactor steam dome pressure specified in Technical Specification (TS) 2.1.1, "Reactor Core SLs [Safety Limits]," for each of these facilities. Specifically, the licensee proposes to reduce the reactor steam dome pressure from 785 pounds per square inch gauge (psig) to 685 psig.
The U.S. Nuclear Regulatory Commission (NRC) has reviewed the application and determined that the information below is needed to complete its review.
RAl-1 The licensee proposes to reduce the reactor steam dome pressure specified in TS 2.1.1.1 and TS 2.1.1.2 from 785 psig to 685 psig based on the lower-bound pressure for the critical power correlation for the fuel currently used in the reactor cores. The application states that CPS has a mixed core of GE 14 and GNF2 fuel which are produced by Global Nuclear Fuel -Americas, LLC (GNF). For the GNF2 fuel, the application references GNF reports NEDC-33292P, NEDC-33270P, and NEDE-24011-P-A as the basis supporting the proposed change. For the GE14 fuel, the application references GNF reports NEDC-32851 P-A as the basis supporting the proposed change.
Section 3.8.3 of GNF report NEDC-33270P discusses the critical power correlation for GNF2 fuel (i.e., GEXL 17 correlation). This section includes the pressure range over which the GEXL 17 correlation is valid for GNF2 fuel consistent with the information provided in Table 5-4 of GNF2 report NEDC-33292P. In Section 3.0 of Attachment 1 to the application, the licensee states that the lower bound pressure limit for the GEXL 17 correlation is 700 pounds per square inch atmospheric (psia).
Enclosure GNF report NEDC-32851 P-A discusses the critical power correlation for GE14 fuel (i.e.,
GEXL 14 correlation). Similar to the GEXL 17 correlation, Section 5.2 of the report states that the lower bound pressure limit for the GEXL 14 correlation is 700 psia.
Converting 700 psia to psig, the lower bound pressure for the GEXL 17 and GEXL 14 correlations is approximately 685.3 psig. As such, the 685 psig value specified in the proposed TS change at CPS is slightly outside the pressure range in which the GEXL 17 and GEXL 14 correlations are valid for GNF2 and GE14 fuel. Provide further justification for the proposed 685 psig value at CPS or propose a revised pressure value for this TS change that is supported by the GEXL 17 and GEXL 14 correlations (e.g., 700 psia).
Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 March 15, 2016
SUBJECT:
CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE THE REACTOR STEAM DOME PRESSURE IN TECHNICAL SPECIFICATION 2.1.1, "REACTOR CORE SLs" (CAC NOS. MF6640-MF6644)
Dear Mr. Hanson:
By application dated August 18, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15231A097), Exelon Generation Company, LLC (the licensee) requested a change to the facility operating licenses for Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; and Quad Cities Nuclear Power Station, Units 1 and 2. The proposed change reduces the reactor steam dome pressure specified in Technical Specification 2.1.1, "Reactor Core SLs [Safety Limits]," for each of these facilities.
The U.S. Nuclear Regulatory Commission has reviewed the application and determined that it needs additional information to complete its review. A response to the enclosed request for additional information is requested to be provided within 30 days from the date of this letter.
Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
Docket Nos.
50-461, 50-237, 50-249, 50-254, and 50-265 Sincerely, IRA/
Blake Purnell, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMClinton RidsRgn3MailCenter RidsN rrDssStsb LPL3-2 R/F RidsNrrPMDresden RidsNrrLASRohrer RidsNrrDssSrxb ADAMS A ccess1on N ML 160 1A206
- o.
7 OFFICE LPL3-2/PM LPL3-2/LA SRXB/BC*
NAME BPurnell SRohrer EOesterle DATE 3/14/16 3/14/16 3/11/16 RidsAcrs_MailCenter RidsNrrPMQuadCities MRazzaque RidsNrrDorllpl3-2 RidsNrrPMExelon
- b
- 1 1yema1 LPL3-2/BC(A)
-PL3-2/PM JPoole 3Purnell 3/14/16
~/15/16 OFFICIAL RECORD COPY