Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station
ML12248A025
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/04/2012
From: Roberts D J
Division Reactor Projects I
To: Pacilio M J
Exelon Nuclear, Exelon Generation Co
KROHN, P
References
IR-12-006
Download: ML12248A025 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012

Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, lL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - LIMERICK GENERATING STATION (REPORT 05000352/2012006 and 05000353/2012006)

Dear Mr. Pacilio:

On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Limerick Generating station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program."

The NRC determined the performance at Limerick Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC

=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). There-fore, the NRC plans to conduct ROP baseline inspections at Unit 1.

The NRC determined the performance at Limerick Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRC

=s ROP Action Matrix because of a self-revealing finding of low to moderate safety significance (White) involving a failure by Exelon to ensure sufficient technical guidance was contained in operating procedures to: (1) ensure that a feedwater (FW) motor-operated valve (MOV) could close against expected system differential pressures; and (2) prevent operators from attempting to close FW MOVs out of sequence resulting in differential pressures for which they are not designed. As a result, two FW valves failed to fully shut resulting in a primary containment isolation valve and the reactor core isolation cooling system being inoperable for greater than their Technical Specification allowed outage time. This finding was assigned to the third quarter of 2011 (ML113410132).

On August 2, 2012, the NRC issued a supplemental inspection report and assessment follow-up letter (ML12215A272) documenting an inspection performed in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," to review the performance of Limerick Unit 2 in addressing the White finding discussed above. The NRC concluded your actions met the objectives of IP 95001. Therefore, in accordance with the guidance in IMC 0305, the White finding will only be considered in M. Pacilio 2 assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at Limerick Unit 2 to be in the Licensee Response Column of the ROP Action Matrix beginning with the third calendar quarter of 2012.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-188, "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns." We also plan to conduct independent spent fuel storage installation inspections (lSFSl) using Inspection Procedure 60855.1, "Operation of an ISFSI at Operating Plants," and an infrequently performed inspection using IP 92723, "Follow-Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to follow up on three traditional enforcement violations in the area of impeding the regulatory process that occurred between the 3 rd quarter 2011 and the 2 nd quarter 2012 (ML112550468, ML12128A373, and ML12215A272). The NRC will schedule and conduct IP 92723 when your staff has notified us of your readiness for this inspection. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the

end-of-cycle performance review.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and

personnel availability issues. The NRC will contac t you as soon as possi ble to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Paul Krohn at 610-337-5120 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts Division of Reactor Projects

Docket Nos. 50-532, 50-353

License Nos. NPF-39, NPF-85

Enclosure:

Limerick Generating Station Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML12248A025 SUNSI Review Non-Sensitive Sensitive Publicly AvailableNon-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver/SM PKrohn/PGK DRoberts/DJR DATE 08/ 27 /12 08/27 /12 08/30 /12 M. Pacilio 3 Distribution w/encl

W. Dean, RA

D. Lew, DRA

D. Roberts, DRP J. Clifford, DRP C. Miller, DRP P. Wilson, DRS P. Krohn, DRP

A. Rosebrook, DRP

S. Ibarrola, DRP

E. Miller, DRP E. DiPaolo, DRP, SRI J. Hawkins, DRP, RI N. Esch, DRP, AA S. Kennedy, RI, OEDO DRS Branch Chiefs (6)

N. McNamara, RI, SLO D. Tifft, RI. SLO D. Screnci, RI, PAO

N. Sheehan, RI, PAO RidsNrrPMLimerick Resource

RidsNrrDorlLpl1-2 Resource ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource

Page 1 of 3 08/22/2012 13:29:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick Inspection / Activity Plan 07/01/2012

-12/31/2013 10/08EXM-LIMERICK INITIAL OL EXAM 4 1 FY13-LIMERICK INITIAL OPERATOR LICENSING EXAM U01858 09/10/2012 09/14/2012 1 FY13-LIMERICK INITIAL OPERATOR LICENSING EXAM U01858 10/08/2012 10/19/2012 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/09/2012 07/13/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/09/2012 07/13/2012 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 07/09/2012 07/13/2012 TI-188-SEISMIC WALKDOWNS 1 1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 07/30/2012 08/03/2012 TI 182-DEGRADATION UNDERGROUNG PIPING - PHASE 1 1 1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 08/06/2012 08/10/2012 TI-187-TI-187 FLOODING WALKDOWNS 1 1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 08/03/2012 08/20/2012 7111121-CDBI 7 1, 2 IP Component Design Bases Inspection 7111121 08/27/2012 08/31/2012 1, 2 IP Component Design Bases Inspection 7111121 09/10/2012 09/14/2012 1, 2 IP Component Design Bases Inspection 7111121 09/24/2012 09/28/2012 7111111B-LIMERICK ON-SITE RQL INSP W/ P/F RESULTS 3 1, 2 IP Licensed Operator Requalification Program 7111111B 11/05/2012 11/09/2012 71152B-PI&R 5 1, 2 IP Problem Identification and Resolution 71152B 10/22/2012 10/26/2012 1, 2 IP Problem Identification and Resolution 71152B 11/05/2012 11/09/2012 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2012 11/09/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/05/2012 11/09/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/05/2012 11/09/2012 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/05/2012 11/09/2012 EP PROGR-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 12/03/2012 12/07/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 12/03/2012 12/07/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 12/03/2012 12/07/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 12/03/2012 12/07/2012 92723-FOLLOWUP FOR 3 SLIV TE VIOS IN 12 MONTHS 1 1, 2 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 01/01/2013 03/31/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 08/22/2012 13:29:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick Inspection / Activity Plan 07/01/2012

-12/31/2013 7/15 EXM-LIMERICK LSRO INITIAL EXAM 2 1 FY13-LIMERICK LSRO INITIAL OPERATOR LICENSING EXAM U01869 06/24/2013 06/28/2013 1 FY13-LIMERICK LSRO INITIAL OPERATOR LICENSING EXAM U01869 07/15/2013 07/19/2013 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/04/2013 03/08/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/04/2013 03/08/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/04/2013 03/08/2013 1, 2 IP Occupational Dose Assessment 71124.04 03/04/2013 03/08/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/04/2013 03/08/2013 60855-ISFSI LOADING INSPECTION 2 1, 2 IP Operation Of An ISFSI 60855 03/13/2013 06/30/2013 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 03/13/2013 06/30/2013 7111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 04/01/2013 04/05/2013 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/05/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/05/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/01/2013 04/05/2013 1, 2 IP Occupational Dose Assessment 71124.04 04/01/2013 04/05/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/01/2013 04/05/2013 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP Fire Protection [Triennial]

7111105T 05/06/2013 05/10/2013 1, 2 IP Fire Protection [Triennial]

7111105T 05/20/2013 05/24/2013 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/08/2013 07/12/2013 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/08/2013 07/12/2013 HP-RADIATION SAFETY INSPECTIONS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/04/2013 11/08/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/04/2013 11/08/2013 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/04/2013 11/08/2013 TI 182-DEGRAD IATION UNDERGROUND PIPING-PHASE 2 1 1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 11/12/2013 11/15/2013 EP EX-EP EXERCISE EVALUATION 5 1, 2 IP Exercise Evaluation 7111401 11/18/2013 11/22/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 08/22/2012 13:29:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick Inspection / Activity Plan 07/01/2012

-12/31/2013 EP EX-EP EXERCISE EVALUATION 5 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/18/2013 11/22/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.