Category:Inspection Plan
MONTHYEARIR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) ML20293A1712020-10-19019 October 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000352/2020005 and 05000353/2020005) ML20183A3192020-07-0101 July 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000352/2020014 and 05000353/2020014 IR 05000352/20190062020-03-0303 March 2020 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006) ML19254A6312019-09-0909 September 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000352/2020401 and 05000353/2020401 IR 05000352/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000352/2019005 and 05000353/2019005) IR 05000352/20180062019-03-0404 March 2019 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2018006 and 05000353/2018006) IR 05000352/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000352/2018005 and 05000353/2018005) IR 05000352/20170062018-02-28028 February 2018 Annual Assessment Letter for Limerick Generating Station-Units 1 and 2 (Report 05000352-2017006 and 05000353-2017006-Report 05000352-2017402 and 05000353-2017402-Report 05000352-2017501 and 05000353-2017501) IR 05000352/20170052017-08-28028 August 2017 Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005) IR 05000352/20160062017-03-0101 March 2017 Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 IR 05000352/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Limerick Generating Station Units 1 and 2 (Report 05000352/2016005 and 05000353/2016005) IR 05000352/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Limerick Generating Station, Units 1 & 2 (Inspection Report 05000352/2015006 & 05000353/2015006) IR 05000352/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2015005 and 05000353/2015005) IR 05000352/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001) IR 05000352/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2014006 and 05000353/2014006 IR 05000352/20130012014-03-0404 March 2014 ROP-14 2013 Limerick Generating Station Annual Assessment Letter for Report 05000352/2013001 and 05000353/2013001, and Inspection Plan IR 05000352/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2013006 and 05000353/2013006 IR 05000352/20120012013-03-0404 March 2013 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2012001 and 05000353/2012001) ML13031A4462013-01-31031 January 2013 Notification of Conduct of Triennial Fire Protection Baseline Inspection ML12248A0252012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station IR 05000352/20110012012-03-0505 March 2012 Annual Assessment Letter for Limerick Generating Station (Report 05000352-11-001 and 05000353-11-001) ML1124113542011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Limerick Generating Station IR 05000352/20100012011-03-0404 March 2011 Annual Assessment Letter for Limerick Generating Station, EOC-11 (05000352/2010001 and 05000353/2010001) ML1024405552010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 ML1006210902010-03-0303 March 2010 EOC Letter and Report 22 ML0924402372009-09-0101 September 2009 Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009) IR 05000352/20090012009-03-0404 March 2009 Annual Assessment Letter - Limerick Generating Station (05000352-09-001 and 05000353-09-001) ML0824704412008-09-0202 September 2008 2008 Mid-Cycle Assessment Letter and Inspection Plan - Limerick ML0806004312008-03-0303 March 2008 Annual Assessment Letter ML0724305792007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000352/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001) IR 05000352/20060012006-03-0202 March 2006 Annual Assessment Letter - Limerick Generating Station (Report 05000352/2006001 and 05000353/2006001) ML0524207032005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Limerick ML0506106412005-03-0202 March 2005 Annual Assessment Letter 2005001 - Limerick ML0406301852004-03-0202 March 2004 2003-04 Annual Assessment Letter - Limerick IR 05000352/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Limerick Generating Station (Report 50-352/03-01, 50-353/03-01) IR 05000352/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Limerick Generating Station (Report 50-352/02-01, 50-353/02-01) 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
March 2, 2005 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way KSA 3-E Kennett Square, PA 19348
SUBJECT:
Annual Assessment Letter - Limerick Generating Station (Report 05000352/2005001 and 05000353/2005001)
Dear Mr. Crane:
On February 7, 2005, the NRC staff completed its end-of-cycle plant performance assessment of Limerick Generating Station (Limerick). The end-of-cycle review for Limerick involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Overall, Limerick operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through September 30, 2006.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
Mr. Christopher M. Crane 2 rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610 337-5209 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mohamed M. Shanbaky, Ph.D., Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk J. Johnsrud, National Energy Committee Chairman, Board of Supervisors of Limerick Township R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear D. Allard, Director, Department of Environmental Protection, Bureau of Radiation Protection (SLO)
Mr. Christopher M. Crane 3 Distribution w/encl:
S. Collins, RA J. Wiggins, DRA A. Blough, DRP B. Holian, DRP W. Lanning, DRS J. Lubinski, DRS S. Lee, RI OEDO D. Roberts, NRR T. Tate, PM, NRR G. Wunder, PM, NRR (Backup)
M. Shanbaky, DRP A. Blamey, DRP S. Hansell, DRP - Senior Resident Inspector B. Bickett, DRP - Resident Inspector T. Haverkamp - Resident OA Region I Docket Room (with concurrences)
ROPreports@nrc.gov (All IRs)
D. Screnci, ORA N. Sheehan, ORA DRS Branch Chiefs (5)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
DOCUMENT NAME: S:\ROP5 End of Cycle Review\Branch 4\Limerick ROP5 Annual Assessment Letter Rev0.wpd SISP Review Complete: mms (Reviewers Initials)
After declaring this document An Official Agency Record it will/will not be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI:DRP RI:DRP NAME Burritt Shanbaky DATE 03/01/05 03/01/05 OFFICIAL RECORD COPY
Page 1 of 2 Limerick 03/01/2005 14:46:25 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111108G - INSERVICE INSPECTION - U2 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/07/2005 03/11/2005 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2 IP 7112102 ALARA Planning and Controls 03/14/2005 03/18/2005 Baseline Inspections 6/13 EXM - LM/PB (LSRO) L.O. INITIAL EXAM 2 1 U01541 LIMERICK/PEACH BOTTOM LSRO INITIAL EXAM (6/5 -10/05) 05/16/2005 05/20/2005 Not Applicable 1 U01541 LIMERICK/PEACH BOTTOM LSRO INITIAL EXAM (6/5 -10/05) 06/13/2005 06/24/2005 Not Applicable 7111111B - LO REQUAL PROGRAM INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 08/21/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 08/29/2005 09/02/2005 Baseline Inspections 71114 - EP PROGRAM INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/01/2005 08/05/2005 Baseline Inspections 7111121 - SSDI 6 1, 2 IP 7111121 Safety System Design and Performance Capability 10/17/2005 10/21/2005 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 10/31/2005 11/04/2005 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 2 1, 2 IP 7111401 Exercise Evaluation 11/14/2005 11/18/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/14/2005 11/18/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/14/2005 11/18/2005 Baseline Inspections 7112101 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/03/2006 01/06/2006 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1 IP 7112102 ALARA Planning and Controls 02/27/2006 03/03/2006 Baseline Inspections 7111108G - INSERVICE INSPECTION - UNIT 1 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/13/2006 03/17/2006 Baseline Inspections 7/31 EXM - OPERATOR LICENSE INIITAL EXAMS 3 1 U01601 LIMERICK UNIT 1 & 2 INITIAL EXAM (10/07) 07/03/2006 07/07/2006 Not Applicable 1 U01601 LIMERICK UNIT 1 & 2 INITIAL EXAM (10/07) 07/31/2006 08/11/2006 Not Applicable 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 06/19/2006 06/23/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Limerick 03/01/2005 14:46:25 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 07/10/2006 07/14/2006 Baseline Inspections 71151 - EP PI VERIFICATION 1 1, 2 IP 71151 Performance Indicator Verification 08/07/2006 08/11/2006 Baseline Inspections 7111107B - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 08/21/2006 08/25/2006 Baseline Inspections 7111112B - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 09/18/2006 09/22/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.