Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2
ML102440555
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/01/2010
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML102440555 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1. 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - LIMERICK GENERATING STATION UNITS 1 and 2

Dear Mr. Pacilio:

On August 11, 2010, the Nuclear Regulatory Commission staff completed its performance review of Limerick Generating Station. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009 through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Limerick Units 1 and 2, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting infrequently performed inspection procedure IP 60855, "Operation of an ISFSI."

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

M. Pacilio 2

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which causes us to change the inspection plan. we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Paul G. Krohn, Chief Division of Reactor PrOjects Projects Branch 4 Docket Nos.

50w352, 50-353 License Nos. NPF-39, NPF-85

Enclosure:

Limerick Inspectionl Activity Plan cc w/encl:

Distribution via ListServ

M. Pacilio 2

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httpJ/www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which causes us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely IRA!

Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.

50-352, 50-353 License Nos. NPF-39, NPF-85

Enclosure:

Limerick Inspection! Activity Plan ccw/encl:

Distribution via ListServ Distribution w/enel:

M. Dapas, Acting RA DRS Deputy Director D. Lew, Acting DRA DRS Branch Chiefs (6)

J. Clifford, DRP N. McNamara, SLO P. Krohn, DRP D. Tifft, SLO A. Rosebrook, DRP D. Screnci, PAO E. Torres, DRP N. Sheehan, PAO J. Bream, DRP R. Barkley, ORA E. DiPaolo, DRP, SRI John Thompson, NRR N. Sieller, DRP, RI RidsNrrDirslpabResource N. Esch, DRP, OA RidsNrrDorILpI1-1-2Resource L. Trocine, RI, OEDO RidsNrrPMLimerickResource DRS Director ROPreportsResource SUNSI REVIEW COMPLETE: AAR (Reviewer's initials)

ML102440555 DOCUMENT NAME:S;\\ROP-11 Mid-Cycle RevieW\\Branch 4\\Limerick\\LGS R11 mid-letter.docx After declaring this document" An Official Agency Record" it will be released to the Public.

To receive acopy ofthis document, indicate in the box: 'C"= Copy wi attachment/enclosure 'E' =Copy w/attachment/enclosure 'N'; No copy

~FFICE mmt RIIDRP I

RIIDRP I

I NAME ARosebrooklAAR PKrohnlPGK DATE 08/25/10 08126110 OFFICIAL RECORD COpy

Page 1 of 2 0812412010 18:08:34 Report 22 Planned Dates 7/19EXAM U01796 10/4EXAM U01767 U01767 7111111B IP 71111118 IP 71111118 7111111 B IP 71111118 71152B IP 711528 IP 711528 EP PROGR IP 7111402 IP 7111403 IP 7111404 IP 7111405 12110/2010 IP 71151-EP01 12/10/2010 IP 71151*EP02 12/10/2010 IP 71151-EP03 Limerick Inspection 1Activity Plan 07/01/2010 12/31/2011 M

- LSRO INITIAL OPERATOR LICENSING EXAM FY-10 LGS LSRO EXAM

- OPERATOR LICENSING INITIAL EXAMS Title 3

6 FY11 - LIMERICK UNITS 1&2 INITIAL OPERATOR LICENSING EXAM FY11 - LIMERICK UNITS 1&2 INITIAL OPERATOR LICENSING EXAM

- LIMERICK LSRO REQUAL INSPECTION 2

Licensed Operator Requalification Program Licensed Operator Requalification Program

- REQUAL INSP WITH P/F RESULTS 3

Licensed Operator Requalification Program

- PI&R 4

Identification and Resolution of Problems Identification and Resolution of Problems

- EP PROGRAM INSPECTION 1,2 1,2 1,2 1,2 1,2 1.2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 2

1,2 1,2 1,2 1,2 1,2 Start 07/19/2010 09/06/2010 10/04/2010 08/02/2010 09/0712010 1111512010 1110112010 11/15/2010 12/06/2010 12106/2010 12/06/2010 1210612010 12/06/2010 12/06/2010 12/06/2010 01/10/2011 01/10/2011 04/04/2011 04/04/2011 04{04/2011 04/0412011 04/04/2011 06/06/2011 End 07/23/2010 09/10/2010 10/15/2010 08/06/2010 09/10/2010 1111912010 1110512010 11/19/2010 12/10/2010 12110/2010 12/1012010 12/1012010 Alert and Notification System Testing Emergency Preparedness Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Correction of Emergency Preparedness Weaknesses and Deficiencies DrilllExercise Performance ERO Drill Participation Alert & Notification System M OCC RAD SAFETY Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls

- U2 INSERVICE INSPECTION Inservice Inspection Activities - BWR

- OCC RAD SAFETY Occupational ALARA Planning and Controls

- OCC RAD SAFETY Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment

-ISFSI OPERATION INSPECTION Operation Of An ISFSI 01/14/2011 01/14/2011 04/08/2011 04/08/2011 04/08/2011 04/08/2011 0410812011 06/10/2011 71124 IP 71124.01 IP 71124.02 7111108G IP 7111108G 71124 IP 71124.02 71124 IP 71124.01 IP 71124.02 IP 71124.04 60855 IP 60855 his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

1

Page 2 of2 Limerick 08/2412010 18:08:34 Inspection I Activity Plan Report 22 07/01/2010 - 12/31/2011 Plan ned Dates Start End Title 7111107T

- TRIENNIAL HEAT SINK 06/14/2011 06/18/2011 IP 711110lT Heat Sink Performance 71124

  • OCC RAD SAFETY - INSTRUMENTS 1

1,2 08108/2011 08/12/2011 IP 71124.05 Radiation Monitoring Instrumentation TI-177

- MANAGING GAS ACCUMULATION IN ECCS 3

1,2 08/08f2011 08/12/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124

-REMP 1,2 09/26/2011 09/30/2011 IP 71124.07 Radiological Environmental Monitoring Program 7111117

- PERMANENT PLANT MODIFICATIONS 3

1,2 10/31/2011 11/04/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1,2 11/14/2011 11/18/2011 IP 7111117A Evaluations of Changes, Tests. or Experiments &Permanent Plant Modifications 71124

- EFFLUENTS 1,2 10/31/2011 11/04/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment EPEX

- EP EXERCISE EVALUATION 4

1,2 11/14/2011 11/18/2011 IP 7111401 Exercise Evaluation 1.2 11/14/2011 11/18/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1.2 11/14/2011 11/1812011 IP 71151-EP01 Drill/Exercise Performance 1.2 11/14/2011 11/18/2011 IP 71151-EP02 ERO Drill Participation 1.2 11/14/2011 11/1812011 IP 71151-EP03 Alert &Notification System his report does not include I NPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.