IR 05000352/2022006
| ML23059A029 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/01/2023 |
| From: | Jon Greives Division of Operating Reactors |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2022006 | |
| Download: ML23059A029 (1) | |
Text
March 1, 2023
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000352/2022006 AND 05000353/2022006)
Dear David Rhoades:
The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Limerick Generating Station (Limerick), Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2022 through December 31, 2022. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Limerick, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Limerick, Units 1 and 2.
The enclosed inspection plan lists the inspections scheduled through December 31, 2024.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities returning to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and, as discussed in our November 2, 2021, memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility.
The NRC will also be performing a baseline inspection of your modification of instrumentation and control systems to digital in accordance with Inspection Procedure 52003, Digital Instrumentation and Control Modification Inspection. The specific schedule to be used for this inspection is being developed by NRC staff to coincide with specific milestones and activities in your project plan. NRC staff will communicate the specific schedule with you as it is identified.
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management2.
1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the new CETI inspection. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from the attached Report 22.
2 The Age-Related Degradation procedure is publicly available and the NRC plans to implement the first inspection of this type beginning in July 2023. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5337 with any questions you have regarding this letter.
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
Jonathan E.
Greives Digitally signed by Jonathan E. Greives Date: 2023.03.01 09:20:40-05'00'
SUNSI Review
x Non-Sensitive Sensitive
x Publicly Available
Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME MHardgrove JGreives
DATE 2/28/23 2/28/23
Site Inspection Activity Plan Limerick 01/01/2023 - 12/31/2024 Unit Start End Activity CAC Title Staff Count Access Control, AA, FFD, Sec Plan Review, PI-LIM
1,2 1/23/2023 1/25/2023 IP 71130.01 000733 Access Authorization 1,2 1/23/2023 1/25/2023 IP 71130.02 000734 Access Control 1,2 1/23/2023 1/25/2023 IP 71130.08 000740 Fitness For Duty Program 1,2 1/23/2023 1/25/2023 IP 71130.09 001656 Security Plan Changes 1,2 1/23/2023 1/25/2023 IP 71151 001338 Performance Indicator Verification RP - 71124.05 Instruments
1,2 3/20/2023 3/24/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation Inservice Inspection
2 5/8/2023 5/12/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 5/8/2023 5/12/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Focused Engineering Inspection - Aging Related
1,2 8/7/2023 8/11/2023 IP 71111.21N.04 001832 Age-Related Degradation 1,2 8/21/2023 8/25/2023 IP 71111.21N.04 001832 Age-Related Degradation ISFSI Loading Campaign Inspection (60855) - LM
1,2 8/21/2023 8/25/2023 IP 60855 001001 Operation Of An ISFSI EP EXERCISE INSPECTION - LIMERICK
1,2 9/25/2023 9/29/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/25/2023 9/29/2023 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 9/25/2023 9/29/2023 IP 71151 001397 Performance Indicator Verification Limerick Requal Inspection with P/F Results
1,2 10/15/2023 10/20/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 10/15/2023 10/20/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance FY24 Limerick Initial License Exam
1,2 11/12/2023 11/17/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 12/3/2023 12/8/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Cyber Security - Limerick
1,2 12/4/2023 12/8/2023 IP 71130.10 000741 Cybersecurity PI&R Biennial Team Inspection - LM
1,2 1/29/2024 2/2/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 2/12/2024 2/16/2024 IP 71152B 000747 Problem Identification and Resolution Prepared on 2/1/2023 2:29:14 PM 1 of 2
Site Inspection Activity Plan Access Control, Equipment Testing and Maintenance, Training, SPR
1,2 3/4/2024 3/8/2024 IP 71130.02 000734 Access Control 1,2 3/4/2024 3/8/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/4/2024 3/8/2024 IP 71130.07 000739 Security Training 1,2 3/4/2024 3/8/2024 IP 71130.09 001656 Security Plan Changes 1,2 3/4/2024 3/8/2024 IP 71151 001338 Performance Indicator Verification Inservice Inspection - Limerick Unit 1
1 4/15/2024 4/19/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP - 71124.03 Airborne and 71124.04 Dose
1,2 6/3/2024 6/7/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 6/3/2024 6/7/2024 IP 71124.04 000728 Occupational Dose Assessment License Renewal Phase 2 - Limerick Unit 1
1 6/10/2024 6/14/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
6/24/2024 6/28/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - LIM
1,2 8/5/2024 8/9/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 8/26/2024 8/30/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Commercial Grade Dedication - Limerick
1,2 9/16/2024 9/20/2024 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 9/30/2024 10/4/2024 IP 71111.21N.03 001808 Commercial Grade Dedication RP - 71124.06 RETS
1,2 10/7/2024 10/11/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment EP Program Inspection - Limerick
1,2 11/4/2024 11/8/2024 IP 71114.02 000717 Alert and Notification System Testing 1,2 11/4/2024 11/8/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 11/4/2024 11/8/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 11/4/2024 11/8/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 11/4/2024 11/8/2024 IP 71151 001397 Performance Indicator Verification RP - 71124.08 Radwaste and 71151 PIV
1,2 11/4/2024 11/8/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FY25 Limerick Initial Licensing Exam
1,2 11/4/2024 11/8/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 12/9/2024 12/13/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Prepared on 2/1/2023 2:29:14 PM 2 of 2