Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005)
ML17236A035
Person / Time
Site: Limerick  
Issue date: 08/28/2017
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Schroeder D
References
Download: ML17236A035 (4)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR LIMERICK GENERATING STATION UNITS 1 AND 2 (REPORT 05000352/2017005 AND 05000353/2017005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Limerick Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Please contact me at 610-337-5262 with any questions that you may have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85

Enclosure:

Inspection Plan

cc: Distribution via ListServ

ML17236A035

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME SBarber/SB DSchroeder/DLS

DATE 7/20/17 8/28/17