Category:Enforcement Action
MONTHYEARML20062B6572020-03-0303 March 2020 EA-19-114 Limerick Generating Station Units 1 and 2 - NRC Investigation Report No. 1-2019-011 and Notice of Violation (Cover Letter Only) IR 05000353/20110092011-12-0808 December 2011 EA-11-221 Limerick - Final Significance Determination for a White Finding with Assessment Follow-Up and Notice of Violation (NRC Inspection Report No. 05000353/2011009) IR 05000353/20090072009-12-16016 December 2009 EA-09-183, Limerick, Notice of Violation (Limerick Generating Station - NRC Investigation Report No. 1-2009-012) and NRC Inspection Report 05000352 & 05000353/2009007 ML0201101732002-01-11011 January 2002 EA-01-293, Limerick Unit 2, White Finding and NOV 2020-03-03
[Table view] Category:Notice of Violation
MONTHYEARIA-22-025, NRC Office of Investigations Report 1-2022-007 and Notice of Violation2022-06-0707 June 2022 IA-22-025: NRC Office of Investigations Report 1-2022-007 and Notice of Violation ML14105A3382014-05-0101 May 2014 Sliv Notice of Violation ML14055A3712014-02-24024 February 2014 IA-14-002 - Notice of Violation ML12306A3972012-11-0101 November 2012 IR 05000352-12-004 and 0500353-12-004; 07-01-12 - 09-30-12; Limerick Generating Station NRC Integrated Inspection Report and Notice of Violation ML12264A4792012-09-20020 September 2012 IA-12-043- Limerick Individual, Notice of Violation IR 05000353/20110092011-12-0808 December 2011 EA-11-221 Limerick - Final Significance Determination for a White Finding with Assessment Follow-Up and Notice of Violation (NRC Inspection Report No. 05000353/2011009) IR 05000353/20090072009-12-16016 December 2009 EA-09-183, Limerick, Notice of Violation (Limerick Generating Station - NRC Investigation Report No. 1-2009-012) and NRC Inspection Report 05000352 & 05000353/2009007 ML0201101732002-01-11011 January 2002 EA-01-293, Limerick Unit 2, White Finding and NOV 2022-06-07
[Table view] Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD KlNG OF PRUSSlA. PA 19406-1415
SUBJECT:
FINAL SIcNIFICANCE DETERMINATION FOR A WHITE FINDING WITH ASSESSMENT FOLLOW-UP AND NOTTCE OF VTOLATION INRC INSPECTION REPORT NO. 05000353/201 10091 - LlMERTCK GENERATING STATION, UNIT 2
Dear Mr. Pacilio:
This letter provides you the final significance determination for the preliminary White finding discussed in the U.S. Nuclear Regulatory Commission (NRC) letter dated November 4,2011, as well as the NRC assessment of the current performance of the Exelon Generation Company, LLC (Exelon) Limerick Generating Station (Limerick) Unit 2. This updated assessment of Limerick Unit 2 supplements, but does not supersede, the NRC annual assessment letter issued on March 4,2A11 (M1110620350)1.
As described in the November 4,2011 letter, the self-revealing finding was recognized by Limerick staff on May 23, 2011, and reviewed during an NRC inspection completed on September 30, 2011. The finding involved the failure by Exelon to ensure sufficient technical guidance was contained in operating procedures to: (1) ensure that a feedwater (FW) motor operated valve (MOV) could close against expected system differential pressures; and (2)
prevent operators from attempting to close FW MOVs out of sequence resulting in differential pressures for which they are not designed. As a result, two FW valves (one of which was a primary containment isolation valve (PCIV)) failed to fully shut when Exelon operators at Limerick attempted to close them in order to secure a FW system flush. Consequently, from April 23 to May 23,2011, the PCIV was inoperable for greater than its Technical Specification allowed outage time. Additionally, because the Limerick Unit 2 reactor core isolation cooling (RCIC) system discharges to the reactor via the B FW header, with the affected FW valves cracked open, a flow path existed for RCIC to flow to the main condenser instead of the reactor.
As a result, in this configuration, RCIC would not have been able to supply design flow to the reactor. Consequently, for this same time period, the Limerick Unit 2 RCIC system was also
Designation in parentheses refers to an Agency-wide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly-available using the accession number in ADAMS.
M. Pacilio 2 inoperable for greater than its Technical Specification allowed outage time. The finding was presented at an exit meeting held at the conclusion of the inspection on October 7,2011, and is described in detail in the subject inspection report (NRC Inspection Report 05000352/2U1044 and 050003531201 1 004; ML113088146).
The November 4, 2011,letter also included an offer for Exelon to attend a regulatory conference or reply in writing to provide its position on the facts and assumptions the NRC used to arrive at the finding and its safety significance. In a letter dated November 14,2011, William Maguire, Limerick Site Vice President, indicated that Exelon did not contest the characterization of the risk significance of this finding and that Exelon declined its opportunity to discuss this issue in a regulatory conference or to provide a written response. After considering the information developed during the inspection, the NRC has concluded that the inspection finding is of low to moderate safety significance, and is therefore appropriately characterized as White.
As a result of the NRC review of the performance at Limerick Unit 2, including this White finding in the Mitigating Systems Cornerstone, the NRC has assessed Limerick Unit 2 to be in the Regulatory Response column of the NRC Action Matrix, retroactive to the beginning of the third cafendar quarter of 2011. Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001, "lnspection for One or Two White lnputs in a Strategic Performance Area," when Exelon staff notify us of their readiness for this inspection. This inspection is conducted to provide assurance that the root cause and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
The NRC has also determined that the finding involved violations of NRC regulations, as cited in the enclosed Notice of Violation (Notice), and described in detail in the subject inspection report.
In accordance with the NRC Enforcement Policy, the Notice is considered an escalated enforcement action because it is associated with a White finding.
The NRC has concluded that information regarding: (1) the reason for the violations; (2) the actions planned or already taken to correct the violations and prevent recurrence; and, (3) the date when full compliance was achieved, is already adequately addressed on the docket in NRC lnspection Report 0500035212011004 and 05000353/2011004 and this letter. As described in the subject inspection report, upon identification of the issue on May 23,2011, Exelon staff fully closed the FW valves, which restored operability to the RCIC system and the PCIV. Additionally, Exelon has planned long-term corrective actions to address this issue, including revising the applicable procedure, performing maintenance and testing on the valves, and revising the scope for preventative maintenance of the valves. Therefore, Exelon is not required to respond to this letter unless the description therein does not accurately reflect Exelon's corrective actions or its position.
M. Pacilio 3 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room located at NRC Headquarters in Rockville, MD, and from the NRC's Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Regional Administrator Docket No, 50-353 License No. NPF-85 Enclosure:
Notice of Violation cc w/encl: Distribution via ListServ