UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LIMERICK GENERATING STATION
Dear Mr. Crane:
On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter of 2007 at Limerick Generating Station Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an Independent Spent Fuel Storage Installation dry run inspection during June 2008.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/ra/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan Distribution w/encl:
(via E-mail)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP R. Laufer, RI OEDO H. Chernoff, NRR P. Bamford, PM, NRR S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector L. Pinkham - Resident OA D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs(6)
RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov JWT1@NRC.GOV Region I Docket Room (with concurrences)
SUNSI Review Complete: __PGK__ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 4 Mid-cycle letters\\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME TSetzer PKrohn DATE 08/27/07 08/ 27 /07 OFFICIAL RECORD COPY
Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:52:40 Report 22 1
- ISFSI CONSTRUCTION INSPECTION Other Routine 04/01/2007 09/30/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]
8 7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111401 IP Exercise Evaluation 3
7111111B
- LOR INSP + P/F REVIEW Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111111B IP Licensed Operator Requalification Program Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111111B IP Licensed Operator Requalification Program 2
7111111B
- LSRO REQUAL AN OPTEST @PB + P/F REVIEW Baseline Inspections 11/01/2007 11/01/2007 1, 2 7111111B IP Licensed Operator Requalification Program 3
01/07EXM
- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007 1
U01632 LIMERICK LSRO EXAM (FY08)
Not Applicable 01/07/2008 01/08/2008 1
U01632 LIMERICK LSRO EXAM (FY08) 7 7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
7111108G
- U1 INSERVICE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1
7111108G IP Inservice Inspection Activities - BWR 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls 3
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections 06/05/2008 06/09/2008 1, 2 7111111B IP Licensed Operator Requalification Program 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/02/2008 06/06/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:52:40 Report 22 4
- ISFSI DRY RUN INSPECTIONS Other Routine 06/09/2008 06/27/2008 1, 2 60854 IP Preoperational Testing Of An ISFSI Other Routine 06/09/2008 06/27/2008 1, 2 60856 IP Review of 10 CFR 72.212(b) Evaluations 4
10/20EXM
- INITIAL OPERATOR LICENSING EXAMS Not Applicable 09/22/2008 09/26/2008 1
U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM Not Applicable 10/20/2008 10/31/2008 1
U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 08/04/2008 08/08/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111107B
- HEAT SINK INSP Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111107B IP Heat Sink Performance 1
- EP PROGRAM INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP03 IP Alert & Notification System 4
- PI&R Baseline Inspections 08/25/2008 08/29/2008 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/08/2008 09/12/2008 1, 2 71152B IP Identification and Resolution of Problems 3
MODS
- MODS AND 50.59 Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.