UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 3, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
ANNUAL ASSESSMENT LETTER - LIMERICK GENERATING STATION
Dear Mr. Pardee:
On February 13, 2008, the NRC staff completed its performance review of Limerick Generating Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Overall, Limerick Generating Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include preoperational testing and initial loading inspections of your Independent Spent Fuel Storage Installation.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan also details preoperational testing and initial loading inspections of your Independent Spent Fuel Storage Installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
C. Pardee 2
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610)337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Generating Station Inspection/ Activity Plan cc w/encl:
C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer, Exelon Generation Company, LLC C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick R. DeGregorio, Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing & Regulatory Affairs B. Fewell, Vice President, General Counsel and Secretary Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency Institute of Nuclear Power Operations (INPO)
C. Pardee 2
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610)337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely, Paul G. Krohn, Chief /RA/
Reactor Projects Branch 4 Division of Reactor Projects Distribution: (via email)
S. Collins, RA M. Dapas, DRA D. Lew, DRP M. Gamberoni, DRS J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP J. Caruso, DRP, Actg Res Insp C. Bickett, DRP, Resident Insp -
P. Bamford, NRR - Project Mgr L. Pinkham - Resident OA DRS Deputy Director DRS Branch Chiefs D. Screnci, PAO, N. Sheehan, PAO R. Barkley, ORA G. West, RI, OEDO H. Chernoff, NRR J. Lubinski, NRR J. Hughey, PM NRR RI Docket Rm (w/concurrences)
JWT1@nrc.gov ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov SUNSI REVIEW COMPLETE: ___pgk__(Reviewers Initials)
DOCUMENT NAME: S:\\ROP-8 EOC REVIEW\\ANNUAL ASSESSMENT LETTERS\\BRANCH 4\\LIM 2007 END-OF-CYCLE LETTER REV03.DOC After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box C copy without attach/enclosure; E copy with attach/enclosure; N No copy OFFICE RI/DRP RI/DRP RI/DRP NAME TSetzer/ TS RFuhrmeister/PGK for PKrohn/
DATE 02 /27 /08 02 /27/08 02 /27 /08 OFFICIAL RECORD COPY
Limerick Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/29/2008 09:39:32 Report 22 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections Access Control to Radiologically Significant Areas 01/07/2008 01/11/2008 1, 2 7112101 IP 1
- ISFSI INSPECTIONS Other Routine Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 01/28/2008 10/31/2008 1, 2 60854.1 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/28/2008 10/31/2008 1, 2 60855.1 IP 1
7111108G
- U1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 1
7111108G IP 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 03/10/2008 03/14/2008 1, 2 7112102 IP 3
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 06/05/2008 06/09/2008 1, 2 7111111B IP 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 06/02/2008 06/06/2008 1, 2 7112202 IP 4
- ISFSI DRY RUN INSPECTIONS Other Routine Preoperational Testing Of An ISFSI 06/09/2008 06/27/2008 1, 2 60854 IP Other Routine Review of 10 CFR 72.212(b) Evaluations 06/09/2008 06/27/2008 1, 2 60856 IP 4
10/20EXM
- INITIAL OPERATOR LICENSING EXAMS Not Applicable FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 09/22/2008 09/26/2008 1
U01745 Not Applicable FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 10/20/2008 10/31/2008 1
U01745 3
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/18/2008 08/22/2008 1, 2 2515/171 IP 1
- EP PROGRAM INSPECTION EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 08/25/2008 08/29/2008 1, 2 7111404 IP Baseline Inspections Drill/Exercise Performance 08/25/2008 08/29/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 08/25/2008 08/29/2008 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 08/25/2008 08/29/2008 1, 2 71151-EP03 IP 4
- PI&R Baseline Inspections Identification and Resolution of Problems 08/25/2008 08/29/2008 1, 2 71152B IP Baseline Inspections Identification and Resolution of Problems 09/08/2008 09/12/2008 1, 2 71152B IP 1
7111107B
- HEAT SINK INSP Baseline Inspections Heat Sink Performance 09/29/2008 10/03/2008 1, 2 7111107B IP 4
MODS
- PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/03/2008 11/07/2008 1, 2 7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/17/2008 11/21/2008 1, 2 7111117B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Limerick Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/29/2008 09:39:32 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 01/05/2009 01/09/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 01/05/2009 01/09/2009 1, 2 7112102 IP 1
7111108G
- U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 03/30/2009 04/03/2009 2
7111108G IP 1
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 04/13/2009 04/17/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/13/2009 04/17/2009 1, 2 7112102 IP 1
- PUB RAD SAFETY - REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/22/2009 06/26/2009 1, 2 7112203 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.