September 3, 2013
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2013006 AND 05000353/2013006)
Dear Mr. Pacilio:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Limerick Generating Station (Limerick) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Limerick Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Limerick Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green).
Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610)337-5209 with any questions you have regarding this letter.
Sincerely,
/RA/
Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos.: 50-352, 50-353 License Nos.: NPF-39, NPF-85
Enclosure: Inspection Plan
cc w/encl: Distribution via ListServ
ML13240A165 SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP
NAME mmt EDiPaolo/ via email SBarber/ SB MGray /MB
DATE 08/ 25 /13 08/ 26/13 09/03 /13
Page 1 of 2 08/01/2013 15:07:01 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick Inspection / Activity Plan 07/01/2013 - 12/31/2014 HP
- RADIATION SAFETY INSPECTIONS
1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/08/2013 07/12/2013 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/08/2013 07/12/2013 EP EX
- EP EXERCISE EVALUATION
1, 2 IP Exercise Evaluation - Scenario Review 7111408 09/16/2013 11/22/2013 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 11/18/2013 11/22/2013 HP
- RADIATION SAFETY INSPECTIONS
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/04/2013 11/08/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/04/2013 11/08/2013 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/04/2013 11/08/2013 TI 182
- DEGRAD IATION UNDERGROUND PIPING-PHASE 2
1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 11/12/2013 11/15/2013 71124.08
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/10/2014 02/14/2014 71124
- RAD SAFETY INSPECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/24/2014 02/28/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/24/2014 02/28/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/24/2014 02/28/2014 1, 2 IP Occupational Dose Assessment 71124.04 02/24/2014 02/28/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 02/24/2014 02/28/2014 7111108G
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 03/31/2014 04/04/2014 71124
- RAD SAFETY INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/31/2014 04/04/2014
IP Occupational ALARA Planning and Controls 71124.02 03/31/2014 04/04/2014
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/31/2014 04/04/2014
IP Occupational Dose Assessment 71124.04 03/31/2014 04/04/2014
IP Radiation Monitoring Instrumentation 71124.05 03/31/2014 04/04/2014 7111111B
- LIM LSRO REQ INSP WITH P/F RESULTS
1, 2 IP Licensed Operator Requalification Program 7111111B 06/16/2014 06/20/2014 71124
- RAD ENVIRONMENTAL MONITORING PROGRAM
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/09/2014 06/13/2014 7111107T
- TRIENNIAL HEAT SINK
1, 2 IP Heat Sink Performance 7111107T 07/14/2014 07/18/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/01/2013 15:07:01 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick Inspection / Activity Plan 07/01/2013 - 12/31/2014 71152B
- PI&R BIENNIAL
1, 2 IP Problem Identification and Resolution 71152B 09/16/2014 09/21/2014 1, 2 IP Problem Identification and Resolution 71152B 09/30/2014 10/04/2014 10/6EXAM
- LIMERICK INITIAL EXAM
1 FY15-LIMERICK INITIAL OPERATOR LICENSING EXAM U01892 12/15/2014 12/19/2014 7111111B
- LIMERICK REQUAL INSP WITH P/F RESULTS
1, 2 IP Licensed Operator Requalification Program 7111111B 11/17/2014 11/21/2014 MODS
- PERMANENT PLANT MODIFICATIONS
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/03/2014 11/07/2014 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/17/2014 11/21/2014 EP PROG
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 12/01/2014 12/05/2014 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 12/01/2014 12/05/2014 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 12/01/2014 12/05/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.