UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406*1415 March 3. l~OlO Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville. IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - LIMERICK GENERATING STATION (0500035212010001 and 05000353/2010001)

Dear Mr. Pardee:

On February 16, 2010, the NRC staff completed its performance review of Limerick Generating Station. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1, 2009 through December 31, 2009. The pwpose of this letter is to inform you of our assessment of your safety performance during this

.period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, limerick Units 1 and 2 operated in a manner that preserved public health and safety and fully met aI/ cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting infrequently performed inspection procedures {IPs} which include IP 60855, "Operation of an ISFSI" and IP 92702, "Follow-up on Corrective Actions for Violations and Deviations"regarding issues associated with the reactor building crane (Ml093500674)1.

1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.

e. Pardee 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival

. onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 eFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site af httg:llwww.nrc.govfreading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 cc w/encl: Distribution via ListServ Limerick Inspection/ Activity Plan

C. Pardee 3 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature:

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely, IRA!

Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Distribution w/end: DRS Branch Chiefs (6)

S. Collins, RA S. Barr. DRS M, Dapas, ORA L Scholl, DRS D.lew,DRP D.Silk, DRS J. Clifford, DRP N. McNamara, SLO P. Krohn, DRP D. TIfft, SLO A. Rosebrook, DRP D. Screnei, PAO E. Torres, DRP N. Sheehan, PAO J. Bream, DRP R. Barkley, ORA E. DiPaolo, DRP, SRI John Thompson, NRR N. Sieller, DRP, RI RidsNrrPMLimerick Resource L. Trocine, RI, OEDO RldsNrrDirs!pab@nrc.gov DRS Director ROPreportsResource@nrc.go'l DRS Deputy Director SUNSI REVIEW COMPLETE: AAR (Reviewer'S initials) ML100621090 DOC NAME: S:\ROP-10 EOC REVIEW\BRANCH 4\LIM ROP-10 EOC\

LIMERICK 2009 EOC LETTER.DOC After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: 'C';:: Copy wI attachmentlendosure 'E' :; Copy w/altachmenflenclosure 'N'" No copy OFFICE RIIDRP I RIIDRP I I NAME ARosebrookl AAR PKrohn I PGK DATE 02/18110 02124 110 OFFICIAL RECORD COpy

Page 1 of2 limerick 03/03/2010 12:15:20 Inspection I Activity Plan Report 22 01/01/2010 - 06/30/2011 Planned Dates Start E!!~, 1.1 !Inspection ActivitL.1 71124 ~ OCC RAD SAFETY MifFS b.-. te Title M 51 I 1

1,2 01/04/2010 0110812010 IP 11124.01 Radiological Hazard Assessment and Exposure Controls 1.2 01/04/2010 0110812010 IP 71124.02 Occupational ALARA Planning and Controls 1.2 01/04/2010 01/0812010 IP 71124.04 Occupational Dose Assessment 7/19EXAM

  • LSRO INITIAL OPERATOR LICENSING EXAM 3 06/0612010 0611812010 U01796 FY-10 LGS LSRO EXAM 0711912010 07/2312010 U01796 FY-10 LGS lSRO EXAM 7111108G
  • U1 INSERVICE INSPECTION 1 03/29/2010 04/0212010 IP 7111108G Inservice Inspection Activities - BWR 71124
  • acc RAD SAFETY 1 0410512010 0410912010 IP 11124.01 Radiological Hazard Assessment and Exposure Controls 04/05/2010 04/09/2010 IP 71124.02 Occupational ALARA Planning and Controls 04/0512010 04/09/2010 IP 71124.04 Occupational Dose Assessment TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1.2 05/10/2010 05/1412010 IP 7111105T Fire Protection [Triennial]

1.2 05/24/2010 05/2812010 IP 7111105T Fife Protection [Triennial) 92702 - CLOSEOUT - NOTICE OF VIOLATION 1,2 05/03/2010 05/07/2010 IP 92702 FoHowup On Corrective Actions For Violations And Deviations 10J4EXAM

  • OPERATOR LICENSING INITIAL EXAMS 6 09/06/2010 09110/2010 U01767 FY11 -LIMERICK UNITS 1&2 INITIAL OPERATOR llCENSING EXAM 10/0412010 10/15/2010 U01767 FY11 -LIMERICK UNITS 1&21NITIAL OPERATOR LICENSING EXAM 71124 - PU6 RAD SAFETY - RADWASTE & ISFSI 1 1.2 06/07/2010 06/11/2010 IP 60855 Operation Of An ISFSI 1,2 06/07/2010 06111/2010 IP 71124.08 Radioactive Solid Waste ProcesSing and Radioactive Malerial Handling. Storage, and Transportation 71111116
  • REQUAL INSP WITH P/F RESULTS 3 1.2 11115/2010 11/19/2010 IP 7111111 B licensed Operator Requalification Program 711526 *PI&R 4 1.2 11101/2010 11/05/2010 IP 711528 Identification and Resolution of Problems 1.2 11115/2010 11/1912010 IP 711529 Identification and Resolution of Problems EP PROGR
  • EP PROGRAM INSPECTION 1 1,2 1210612010 12/10/2010 IP 1111402 Alert and NoUfication System EValuation 1,2 12/06/2010 12/10/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1.2 12106/2010 12/10/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1.2 12106/2010 12110/2010 IP 1111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1.2 12/0612010 12/10/2010 IP 71151-EP01 Drill/Exercise Performance his report does not Include INPO and OUTAGE~aCiflilties.

This report shows only on-site and announced inspection procedures.

Page 2 of2 Limerick 03/03'2010 12:15:20  ; ~ t/ t::')~: r~ Inspection I Activity Plan Report 22 01/01/2010

  • 06'30/2011 Planned Dates Start End Title EP PROGR
  • EP PROGRAM INSPECTION 1 1.2 12/0612010 12110/2010 IP 71151*EP02 ERO Drill Participation 1.2 12/06/2010 12/10/2010 IP 71151-EP03 Alert &. Notification System 7111108G
  • U2 INSERVICE INSPECTION 1 2 04/04/2011 04/08/2011 IP 7111108G Inservice Inspection Activities* BWR 71124
  • acc RAD SAFETY 1 1.2 04104/2Q11 04/0812011 IP 71124.02 Occupational ALARA Planning and Controls 60855 *ISFSI OPERATION INSPECTION 1 1,2 06/06/2011 06/1012011 IP 60855 Operation Of An ISFSI 7111107T
  • TRIENNIAL HEAT SINK 1 06f1412011 06/1812011 IP 7111107T Heat Sink Performance his repcirt.dOes noflnCiudefNPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.