Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009)
ML092440237
Person / Time
Site: Limerick  
Issue date: 09/01/2009
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pardee C
Exelon Generation Co, Exelon Nuclear
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML092440237 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - LIMERICK GENERATING STATION

Dear Mr. Pardee:

On August 13, 2009, the NRC staff completed its performance review of Limerick Generating Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

C. Pardee 2

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the ROP. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85

Enclosure:

Limerick Inspection/ Activity Plan cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing D. Helker, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township

Inspection / Activity Plan Page 1 of 2 08/31/2009 16:41:20 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick 7112103

- RMS & SCBA 1

1 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/03/2009 08/07/2009 7112103

- OCC RAD SAFETY - INSTRUMENTS 1

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/03/2009 08/07/2009 71122.01

- PUB RAD SAFETY - RETS & ANNUAL ISFSI 1

1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 08/17/2009 08/21/2009 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/17/2009 08/21/2009 7111121

- CDBI 8

1, 2 IP Component Design Bases Inspection 7111121 10/19/2009 10/23/2009 1, 2 IP Component Design Bases Inspection 7111121 10/26/2009 10/30/2009 EP EXER

- EP EXERCISE INSPECTION 4

1, 2 IP Exercise Evaluation 7111401 11/16/2009 11/20/2009 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/16/2009 11/20/2009 1, 2 IP Drill/Exercise Performance 71151-EP01 11/16/2009 11/20/2009 1, 2 IP ERO Drill Participation 71151-EP02 11/16/2009 11/20/2009 1, 2 IP Alert & Notification System 71151-EP03 11/16/2009 11/20/2009 TI-178

- SURVEILLANCE FREQUENCY CONTROL PROGRAM 2

1, 2 IP Risk Management Technical Specifications Initiative 5b Surveillance Frequency Control Program 2515/178 11/30/2009 12/04/2009 71121

- OCC RAD SAFETY 1

1, 2 IP Access Control to Radiologically Significant Areas 7112101 01/04/2010 01/08/2010 1, 2 IP ALARA - Required 7112102-7112102R 01/04/2010 01/08/2010 6/07EXAM

- LSRO INITIAL OPERATOR LICENSING EXAM 3

1 FY-10 LIMERICK EXAM FOR LIMERICK GENERATING STATION 6/7/2010 U01796 06/07/2010 06/18/2010 7111108G

- U1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 03/29/2010 04/02/2010 71121

- OCC RAD SAFETY 1

1 IP Access Control to Radiologically Significant Areas 7112101 04/05/2010 04/09/2010 1

IP ALARA - Required 7112102-7112102R 04/05/2010 04/09/2010 TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION 3

1, 2 IP Fire Protection [Triennial]

7111105T 05/10/2010 05/14/2010 1, 2 IP Fire Protection [Triennial]

7111105T 05/24/2010 05/28/2010 10/4EXAM

- OPERATOR LICENSING INITIAL EXAMS 4

1 FY11 - LIMERICK UNITS 1&2 INITIAL OPERATOR LICENSING EXAM U01767 09/06/2010 09/10/2010 1

FY11 - LIMERICK UNITS 1&2 INITIAL OPERATOR LICENSING EXAM U01767 10/04/2010 10/15/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 08/31/2009 16:41:20 Report 22 07/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Limerick 7112202

- PUB RAD SAFETY - RADWASTE 1

1, 2 IP Radioactive Material Processing and Transportation 7112202 06/07/2010 06/11/2010 7111111B

- REQUAL INSP WITH P/F RESULTS 3

1, 2 IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 71152B

- PI&R 5

1, 2 IP Identification and Resolution of Problems 71152B 11/01/2010 11/05/2010 1, 2 IP Identification and Resolution of Problems 71152B 11/15/2010 11/19/2010 EP PROGR

- EP PROGRAM INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 12/06/2010 12/10/2010 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 12/06/2010 12/10/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 12/06/2010 12/10/2010 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 12/06/2010 12/10/2010 1, 2 IP Performance Indicator Verification 71151 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.