IR 05000219/2015005
ML15229A114 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 09/01/2015 |
From: | Scott M L Division Reactor Projects I |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
KENNEDY, SR | |
References | |
IR-2015005 | |
Download: ML15229A114 (6) | |
Text
September 1, 2015
Mr. Bryan Hanson Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2015005)
Dear Mr. Hanson:
On August 13, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Oyster Creek Nuclear Generating Station (Oyster Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of your facility, and its plans for future inspections at your facility. The NRC determined that performance at Oyster Creek during the most recent quarter was within the Regulatory Response Matrix because one finding of White significance, associated with the Mitigating Systems cornerstone, was identified in the fourth quarter 2014 integrated inspection report (ADAMS Accession No. ML15042A072). The finding was associated with an inadequate review of a change in maintenance process that caused an inoperable emergency diesel generator (EDG). The final significance determination and follow-up assessment letter for this finding issued on April 27, 2015, documented that Oyster Creek transitioned to the Regulatory Response Column of the ROP Action Matrix in accordance with Inspection Manual Chapter (IMC) 0305, retroactive to the fourth quarter of 2014. On July 14, 2015, your staff notified the NRC of your readiness for a supplemental inspection to review the actions taken to address the White finding described above. In response, the NRC will conduct a supplemental inspection in accordance with Inspection for One or Two White Inputs in a Strategic Performance Areaduring the week of August 31, 2015. The objectives of the 95001 inspection are to provide assurance that the root cause and contributing causes of risk-significant performance issues are understood, the extent of condition and extent of cause are understood, and the corrective actions are sufficient to address the root and contributing causes and prevent recurrence. The NRC will notify you of the results of this inspection via a separate inspection report which will be publically available. -to-White threshold, based on PI data submitted in July 2015. Specifically, this PI crossed the Green-to-White threshold due to unplanned scrams on July 11, 2014; October 12, 2014; March 22, 2015; and May 7, 2015. Because the White PI was not in the same Cornerstone as the White finding related to the EDG, discussed above, Oyster Creek will remain in the Regulatory Response Column of the ROP Action Matrix. On August 18, , your staff notified the NRC of your readiness for a supplemental inspection to review the actions taken to address the White PI. The NRC will conduct a supplemental inspection using The objectives of the 95001 supplemental inspection were discussed above. On April 27, 2015, the NRC issued the final significance determination and follow-up assessment letter (ML15112A147) for a Yellow finding associated with the inadequate application of materials, parts, equipment and processes associated with electromatic relief valves. The letter stated that, because the finding was considered an old design issue in accordance with IMC 0305, it will not be used as input in the assessment process or NRC Action Matrix. However, in accordance with IMC 0305, the NRC will conduct a supplemental for One Degraded notify us of their readiness for this inspection. The objectives of this 95002 inspection are to provide assurance that root and contributing causes of risk-significant performance issues are understood, to independently assess and provide assurance that the extent of condition and the extent of cause are identified, and to provide assurance that corrective actions are sufficient to address the root and contributing causes and prevent recurrence. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition Independent Spent Fuel Storage Installation at Operating Plants, and Temporary Instruction (TI) 2515-191Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-g Licenses with Regard to Reliable Spent Fuel Pool wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site has been scheduled for the week of May 2, 2016. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. From July 1, 2014, through June 30, 2015, the NRC issued two severity level (SL) IV traditional enforcement violations associated with impeding the regulatory process. The NRC plans to follow-up on these violations by conducting Inspection Procedure 92702, or standard baseline inspection procedures, as described in IMC 0305, Section 13.02.b. In accordance with Title 10 of the Code of Federal Regulationse electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Silas Kennedy at (610) 337-5046 with any questions you have regarding this letter.
Sincerely,/RA/ Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-219 License Nos. DPR-16
Enclosure:
Oyster Creek Nuclear Generating Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15229A114 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME APatel/AVZ for via email AZiedonis/ AVZ SKennedy/ SRK MScott/ MLS DATE 08/26 /15 08/25 /15 08/ 25 /15 08/ 26 /15 Page 1 of 208/25/201514:00:29Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2015-06/30/201771124-REMP11 IPRadiological Environmental Monitoring Program71124.0708/03/201508/06/2015EXM2/1-INITIAL OL EXAMINATION51 FY16-OC INITIAL OPERATOR LICENSING EXAMU0192901/04/201601/08/20161 FY16-OC INITIAL OPERATOR LICENSING EXAMU0192902/01/201602/12/2016EP-EP EXERCISE51 IPExercise Evaluation - Hostile Action (HA) Event711140709/28/201510/02/20151 IPExercise Evaluation - Scenario Review711140809/28/201510/02/201571151-RP CHEM PI VERIFY AND HP INSPECTIONS11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/02/201511/05/20151 IPOccupational ALARA Planning and Controls71124.0211/02/201511/05/20151 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/02/201511/05/20151 IPOccupational Dose Assessment71124.0411/02/201511/05/20151 IPOccupational Exposure Control Effectiveness71151-OR0111/02/201511/05/20151 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/02/201511/05/201571124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/201602/12/20167111121-CDBI61 IPComponent Design Bases Inspection711112103/07/201603/11/20161 IPComponent Design Bases Inspection711112103/21/201603/25/20161 IPComponent Design Bases Inspection711112104/04/201604/08/201671124-05 RAD MONITORING INSTRUMENTATION11 IPRadiation Monitoring Instrumentation71124.0504/18/201604/22/2016ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11 IPOperation Of An ISFSI6085504/18/201604/22/20161 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.104/18/201604/22/201671124-01 EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/05/201609/08/201671124-02 ALARA11 IPOccupational ALARA Planning and Controls71124.0209/05/201609/08/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G09/26/201609/30/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 208/25/201514:00:29Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteOyster CreekInspection / Activity Plan07/01/2015-06/30/2017EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140209/26/201609/30/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140309/26/201609/30/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140509/26/201609/30/201671124-01EXPOCONTROL02 ALARA 03 AIRBORNE04 DOSE11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/26/201609/30/20161 IPOccupational ALARA Planning and Controls71124.0209/26/201609/30/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/26/201609/30/20161 IPOccupational Dose Assessment71124.0409/26/201609/30/201671152BI-PI&R BIENNIAL41 IPProblem Identification and Resolution71152B10/31/201611/04/20161 IPProblem Identification and Resolution71152B11/14/201611/18/201671124-71151 PI VERIFY 71124.01 .02 .03 .04 .0511 IPRadiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/20161 IPOccupational ALARA Planning and Controls71124.0211/07/201611/11/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/07/201611/11/20161 IPOccupational Dose Assessment71124.0411/07/201611/11/20161 IPRadiation Monitoring Instrumentation71124.0511/07/201611/11/20161 IPOccupational Exposure Control Effectiveness71151-OR0111/07/201611/11/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/201671124-71124.01 RAD EXPOSURE CONTROL11 IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/201703/09/20177111105T-TRIENNIAL FIRE PROTECTION51 IPFire Protection [Triennial]7111105T03/20/201703/24/20171 IPFire Protection [Triennial]7111105T04/03/201704/07/20177111111B-OYSTER CREEK REQUAL INSP W/ P/F RESULTS21 IPLicensed Operator Requalification Program7111111B06/05/201706/09/2017TI-191-FUKUSHIMA LESSONS-LEARNED11 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19105/15/201705/19/201771124-RAD ENV TEAM INSPECT 71124.05 06 0731 IPRadiation Monitoring Instrumentation71124.0506/19/201706/23/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/19/201706/23/20171 IPRadiological Environmental Monitoring Program71124.0706/19/201706/23/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.