August 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1
ML052590239
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/13/2005
From: Allen B
FirstEnergy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3192
Download: ML052590239 (7)


Text

Firstung yd Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor Ohio 43449-9760 September 13, 2005 Docket Number 50-346 License Number NPF-3 Serial Number 3192 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Monthly Operating Report, August 2005 Davis-Besse Nuclear Power Station Unit 1 Ladies and Gentlemen:

Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of August 2005.

On August 16, 2005, the Nuclear Regulatory Commission (NRC) issued License Amendment Number 267 for the Davis-Besse Nuclear Power Station (DBNPS). License Amendment Number 267 deleted the Technical Specification 6.9.1.6 requirement to submit the Monthly Operating Report. The DBNPS implemented this License Amendment on August 31, 2005. Therefore, following this submittal (DBNPS letter Serial Number 3192),

the FirstEnergy Operating Company (FENOC) will no longer submit the DBNPS Monthly Operating Report.

As committed to in its application for the License Amendment (letter Serial Number 3080, dated February 22, 2005), the DBNPS will, in lieu of a Monthly Operating Report, provide operating data (for each calendar month) that is described in Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," by the last day of the month following the end of each calendar quarter. This data will be provided via the industry's electronic Consolidated Data Entry Program.

I*2

Docket Number 50-346 License Number NPF-3 Serial Number 3192 Page 2 of 2 Please direct any questions regarding this Monthly Operating Report to Brian D. Boles, Manager - Plant Engineering, at (419) 321-7302.

Very truly yours, Barr .Ie Director - Site Operations Davis-Besse Nuclear Power Station AWB/s Enclosures cc: DB-1 NRC/NRR Project Manager DB-1 Senior Resident Inspector NRC Region III Administrator

Docket Number 50-346 License Number NPF-3 Serial Number 3192 Distribution bcc: B. S. Allen, DB-2101 A. W. Bless, DB-3065 B. D. Boles, DB-1056 D. R. Converse, DB-3310 J. J. Grabnar, DB-3210 L. J. Kovach, DB-1056 A. R. Miller, DB-1056 G. C. Wilson, DB-2103 D. R. Wuokko, DB-3065 CNRB Administrator D. W. Jenkins, GO-18 R. Runo, GO-14 T. Schneider, A-GO-17 F. Heizer, PUCO B. Lewis, Utility Data Institute, Inc.

R. Schomaker, Framatome American Nuclear Insurers INPO Records Center Ohio EPA - DERR Compliance Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 3192 Enclosure I Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419) 321-8585 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

Commitments Due Date No new commitments have been made N/A in this letter.

Docket Number 50-346 License Number NPF-3 Serial Number 3192

.Monthly Operating Report for August 2005 (two pages to follow)

OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1 DATE 09/01/05 COMPLETED BY A. R.Miller TELEPHONE 419-321-7824 REPORTING PERIOD Auust. 2005 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net). 906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net). 882 The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical. 744.0 5,274.9 159,721.2 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line. 744.0 5,258.0 156,924.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers dosed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5 Unit Reserve Shutdown Hours. 0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH). 653,957 4,655,540 129,565,763 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed In mega-watt hours. Negative quantities should not be used.

4 UNIT SHUTDOWNS DOCKET NO. 50-346 UNIT NAME Davis-Besse #1 DATE 9/01/05 COMPLETED BY A.R. Miller REPORTING PERIOD: August, 2005 TELEPHONE (419) 321-7824 NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING

&: SCHEDULED DOWN (2) COMMENTS No Unit Shutdowns

SUMMARY

The reactor was at 100% power for the majority of the month. On August 28,'the unit downpowered to approximately 92% for Main Turbine Control Valve and Main Turbine Combined Intermediate Valve Testing.

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Exam 5-Other (Explain)

F-Administrative G-Operational Error (Explain)