Davis-Besse Nuclear Power Station

  • t Ad 5501 North State Route 2 Oak Harbor Ohio 43449-9760 Docket No. 50-346 License No. NPF-3 Serial No. 3092 September 13, 2004 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Monthly Operating Report, August 2004 Davis-Besse Nuclear Power Station Unit 1 Ladies and Gentlemen:

Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of August 2004.

Please direct questions to Brian D. Boles, Manager- Plant Engineering, at (419) 321-7302.

Very truly yours, Barry S. Allen Plant Manager Davis-Besse Nuclear Power Station AWB/s Enclosures cc: DB-1 NRC/NRR Senior Project Manager DB-l Senior Resident Inspector NRC Region III Administrator

  • >eZX

Docket No. 50-346 License No. NPF-3 Serial No. 3092 Distribution bcc: B. S. Allen, DB-2101 A. W. Bless, DB 3065 B. D. Boles, DB-1056 D. R. Converse, DB-3310 J. J. Grabnar, DB-3210 L. J. Kovach, DB-1056 A. R. Miller, DB-1056 M. E. O'Reilly, GO-18 R. Runo, GO-14 T. Schneider, A-GO-17 G. C. Wilson, DB-2103 D. R. Wuokko, DB-3065 F. Heizer, PUCO B. Lewis, Utility Data Institute, Inc.

R. Prijatel, Fuel Accounting, GO-6 R. Schomaker, Framatome American Nuclear Insurers CNRB Administrator INPO Records Center Ohio EPA - DERR Compliance Utility Radiological Safety Board

Docket No. 50-346 License No. NPF-3 Serial No. 3092 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Director - Performance Improvement (419-321-7181) at Davis-Besse of any questions regarding this document or associated regulatory commitments.

Commitments Due Date None N/A

Docket No. 50-346 License No. NPF-3 Serial No. 3092 Monthly Operating Report for August 2004 (two pages to follow)

OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1 DATE 09/01/04 COMPLETED BY A. R. Miller TELEPHONE 419-321-7824 REPORTING PERIOD August, 2004 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net). 906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net). 882 The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical. 668.8 3,883.1 151,517.4 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line. 637.9 3,700.0 148,737.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers dosed to the station bus. -

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours In the reporting period.

5 Unit Reserve Shutdown Hours. 0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH). 554,935 3,171,719 122,303,517 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours. Negative quantities should not be used.

4, UNIT SHUTDOWNS DOCKET NO. 50-346 UNIT NAME Davis-Besse #1 DATE 9/01/04 COMPLETED BY A.R. Miller REPORTING PERIOD: August. 2004 TELEPHONE (419) 321-7824 NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 1 8/4/04 F 106.1 A 3 On August 4, 2004 at 1023 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.892515e-4 months <br /> the unit experienced a Reactor Trip while performing Reactor Trip Breaker B Testing due to a fuse failure in the circuit.

SUMMARY

The reactor was at 100% power for the majority of the month. On August 1, the unit downpowered to approximately 90% for Main Turbine Control Valve, Combined Intermediate Valves Testing. On August 4, the unit experienced a Reactor Trip while performing Reactor Trip Breaker B Testing due to a fuse failure in the circuit. The unit returned to approximately 100% following the trip on August 9. On August 9, the unit downpowered to approximately 95% due to maintenance on a feedwater heater normal drain valve and returned to approximately 100% power the following day. On August 26, the unit downpowered to less than 100% (approximately 99%) due to problems with the Integrated Control System.

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Exam 5-Other (Explain)

F-Administrative G-Operational Error (Explain)