ML050460196

From kanterella
Jump to navigation Jump to search
January 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1
ML050460196
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/10/2005
From: Allen B
FirstEnergy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3126
Download: ML050460196 (6)


Text

Firs~neWDavis-Besse Nuclear Power Station FirstEnergy 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 Docket No. 50-346 License No. NPF-3 Serial No. 3126 February 10, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Monthly Operating Report, January 2005 Davis-Besse Nuclear Power Station Unit I Ladies and Gentlemen:

Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of January 2005.

Please direct questions to Brian D. Boles, Manager-Plant Engineering, at (419) 321-7302.

Very truly yours, Barry S. Allen Director - Site Operations Davis-Besse Nuclear Power Station AWB/s Enclosures cc: DB-I NRC/NRR Senior Project Manager DB-1 SeniorResident Inspector NRC Region III Administrator

Docket No. 50-346 License No. NPF-3 Serial No. 3126 Distribution bcc: B. S. Allen, DB-2101 A. W. Bless, DB 3065 B. D. Boles, DB-1056 D. R. Converse, DB-3310 J. J. Grabnar, DB-3210 L. J. Kovach, DB-1056 A. R. Miller, DB-1056 G. C. Wilson, DB-2103 D. R. Wuokko, DB-3065 CNRB Administrator D. W. Jenkins, GO-18 R. Runo, GO-14 T. Schneider, A-GO-17 F. Heizer, PUCO B. Lewis, Utility Data Institute, Inc.

R. Schomaker, Framatome American Nuclear Insurers INPO Records Center Ohio EPA - DERR Compliance Utility Radiological Safety Board

Docket No. 50-346 License No. NPF-3 Serial No. 3126 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419) 321-8585 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

Commitments Due Date None N/A

Docket No. 50-346 License No. NPF-3 Serial No. 3126 Monthly Operating Report for January 2005 (two pages to follow)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-0346 Davis-Besse Unit 1 02/01105 A. R. Miller 419-321-7824 REPORTING PERIOD January, 2005 YEAR TO DATE MONTH CUMULATIVE 1 Design Electrical Rating (MWe-Net).

The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net).

The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical.

The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line.

(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours In the reporting period.

5 Unit Reserve Shutdown Hours.

The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

906 882 389.0 386.5 0.0 389.0 386.5 0.0 154,835.3 152,052.6 5,532.0 6 Net Electrical Energy (MWH).

The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed In mega-watt hours. Negative quantities should not be used.

333,513 333,513 125,243,736

UNIT SHUTDOWNS DOCKET NO.

50-346 UNIT NAME Davis-Besse #1 DATE 2/01/05 COMPLETED BY A.R. Miller REPORTING PERIOD:

January, 2005 TELEPHONE (419) 321-7824 NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING S: SCHEDULED DOWN (2)

COMMENTS 1

01/17/05 5

357.5 B

I Commenced the Mid-Cycle Steam Generator Inspection Outage

SUMMARY

On January 17, 2005, the unit commenced the Mid-Cycle Steam Generator Inspection Outage and remained off-line the remainder of January.

(1) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(2)

Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)