February 2005 Monthly Operating Report for Davis-Besse Unit 1
ML050730237
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/10/2005
From: Allen B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3134
Download: ML050730237 (6)


Text

FirstEnergy. Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor Ohio 43449-9760 Docket No. 50-346 License No. NPF-3 Serial No. 3134 March 10, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Monthly Operating Report, February 2005 Davis-Besse Nuclear Power Station Unit I Ladies and Gentlemen:

Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of February 2005.

Please direct questions to Brian D. Boles, Manager- Plant Engineering, at (419) 321-7302.

Very truly yours, K5SH/9 I

Barry S. Allen V v Director - Site Operations Davis-Besse Nuclear Power Station AWB/s Enclosures cc: DB-I NRC/NRR Senior Project Manager DB-l Senior Resident Inspector NRC Region III Administrator

fJf2LI

Docket No. 50-346 License No. NPF-3 Serial No. 3134 Distribution bcc: B. S. Allen, DB-2101 A. W. Bless, DB 3065 B. D. Boles, DB-1056 D. R. Converse, DB-3310 J. J. Grabnar, DB-3210 L. J. Kovach, DB-1056 A. R. Miller, DB-1056 G. C. Wilson, DB-2103 D. R. Wuokko, DB-3065 CNRB Administrator D. W. Jenkins, GO-18 R. Runo, GO-14 T. Schneider, A-GO-17 F. Heizer, PUCO B. Lewis, Utility Data Institute, Inc.

R. Schomaker, Framatome American Nuclear Insurers INPO Records Center Ohio EPA - DERR Compliance Utility Radiological Safety Board

Docket No. 50-346 License No. NPF-3 Serial No. 3134 Page 1 of I COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419) 321-8585 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

Commitments Due Date None N/A

Docket No. 50-346 License No. NPF-3 Serial No. 3134 Monthly Operating Report for February 2005 (two pages to follow)

OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1 DATE 03/01/05 COMPLETED BY A. R.Miller TELEPHONE 419-321-7824 REPORTING PERIOD February, 2005 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net). 906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net). 882 The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical. 470.9 859.9 155,306.2 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line. 456.5 843.0 152,509.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers dosed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours In the reporting period.

5 Unit Reserve Shutdown Hours. 0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH). 402,330 735,843 125,646,066 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours. Negative quantities should not be used.

)

UNIT SHUTDOWNS DOCKET NO. 50-346 UNIT NAME Davis-Besse #1 DATE 3/01/05 COMPLETED BY A.R. Miller REPORTING PERIOD: February, 2005 TELEPHONE (419) 321-7824 NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSEICORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING

&: SCHEDULED DOWN (2) COMMENTS 1 1/17/05 5 215.5 B 1.4 Ended Mid-Cycle Steam Generator Inspection Outage on February 9, 2005.

SUMMARY

On January 17, 2005, the unit was shutdown to begin the Mid-Cycle Steam Generator Inspection Outage. On February 9, 2005, at approximately 0909 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br /> Reactor criticality was achieved. Later that same day, the unit synchronized the Turbine-Generator to the grid and finished the Mid-Cycle Steam Generator Inspection Outage. The unit was returned to approximately 100% power on February 11.

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Exam 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)