February 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station, Unit 1
ML020720470
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/08/2002
From: Fast J
FirstEnergy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CCN: P-6-02-02
Download: ML020720470 (4)


Text

FrstEnergy Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor,Ohio 43449-9760 March 8, 2002 CCN: P-6-02-02 Docket No. 50-346 License No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:

Monthly Operating Report, February 2002 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of February 2002.

If you have any questions, please contact Aaron Quaderer at (419) 321-7384.

Very truly yours, J. Randel Fast Plant Manager Davis-Besse Nuclear Power Station ASQ/ljk Enclosure cc: S. P. Sands NRC Project Manager J. E. Dyer NRC Region III Administrator C. S. Thomas NRC Senior Resident Inspector

/ 2 C,

(N

UNIT SHUTDOWNS DOCKET NO. 50-346 UNIT NAME Davis-Besse #1 DATE 03/02102 COMPLETED BY A. S. Quaderer REPORTING PERIOD: February, 2002 TELEPHONE (419) 321-7384 NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING

&:SCHEDULED DOWN (2) COMMENTS 2 2/16/02 S: SCHEDULED 309.1 C 1 Began 13th refueling outage.

SUMMARY

The reactor remained at approximately 100% power from February 1, 2002 to February 9, 2002. Plant power was reduced on February 9, 2002 at 1705 hours0.0197 days <br />0.474 hours <br />0.00282 weeks <br />6.487525e-4 months <br /> from approximately 100 percent power to approximately 95 percent power to maintain a control rod index less than 297 after a RCS boron increase occurred when placing deborating demin #1 in service. Plant power was returned to approximately 100 percent power on February 11, 2002 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />. Plant power was reduced on February 12, 2002 at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> from approximately 100 percent power to approximately 95 percent power to conduct Main Steam Safety Valve testing. On February 15, 2002 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> the power reduction to 15 percent power for the 13th refueling outage began from 95 percent power. The main turbine was manually tripped at 0254 hours0.00294 days <br />0.0706 hours <br />4.199735e-4 weeks <br />9.6647e-5 months <br /> on January 16, 2002. The reactor was shutdown on February 16, 2002 at 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br /> by performing a Control Rod Drop Test. Plant remained shutdown for the remainder of the month.

(1) Reason: (2) Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Exami 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1 DATE 03/02/02 COMPLETED BY A.S. Quaderer TELEPHONE 419-321-7384 REPORTING PERIOD February, 2002 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net). 906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net). 882 The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.

3 Number of Hours the Reactor Was Critical. 363.6 1,107.6 147,634.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line. 362.9 1,082.2 145,037.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5 Unit Reserve Shutdown Hours. 0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH). 305,977 923,533 119,112,148 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.

P-6-02-02 March 8, 2002 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A