ML022310246
| ML022310246 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/13/2002 |
| From: | Fast J FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CCN: P-6-02-07 | |
| Download: ML022310246 (17) | |
Text
Davis-Besse Nuclear Power Station Firstnr_
5501 North State Route 2 Oak Harbor, Ohio 43449-9760 August 13, 2002 CCN: P-6-02-07 Docket No. 50-346 License No. NPF-3 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:
Monthly Operating Report, July 2002 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of July 2002. Also enclosed are revised Operating Data Reports from July 2001 to present which reflect corrections to "net electrical energy (MWH)."
A calculation error caused the calculation of Station House Power to be approximately 3 percent high during that timeframe, resulting in an under reported net electrical energy value.
If you have any questions, please contact Aaron Quaderer at (419) 321-7384.
Very truly yours, J. Randel Fast Plant Manager Davis-Besse Nuclear Power Station ASQ/Ijk Enclosure cc:
D. V. Pickett NRC Project Manager J. E. Dyer NRC Region III Administrator C. S. Thomas NRC Senior Resident Inspector
Docket Number 50-346 License Number NPF-3 P-6-02-07 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at Davis-Besse of any questions regarding this document or any associated regulatory commitments.
Commitments Due Date None
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/02/02 A. S. Quaderer 419-321-7384 July, 2002 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
906 882 0.0 1,107.6 0.0 1,082.2 0.0 0.0 0
929,023 MONTH YEAR TO DATE CUMULATIVE 147,634.3 145,037.1 5,532.0 119,131,798
UNIT SHUTDOWNS DOCKET NO.
50-346 UNIT NAME Davis-Besse #1 DATE 08/02/02 COMPLETED BY A. S. Quaderer REPORTING PERIOD: July, 2002 TELEPHONE (419) 321-7384 NO.
DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS)
SHUTTING
&: SCHEDULED DOWN (2)
COMMENTS 2
2/16/02 S: SCHEDULED 744.0 C, H 1
13th refueling outage, discovery of boric acid corrosion (cont.)
on reactor vessel head
SUMMARY
The reactor was shutdown on February 16, 2002 to begin the 13th refueling outage.
due to the discovery of boric acid corrosion on the reactor vessel head.
(1) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exami F-Administrative G-Operational Error (Explain)
H-Other (Explain)
The plant remained shutdown throughout the month of July (2) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 July, 2001 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
744.0 744.0 0.0 YEAR TO DATE CUMULATIVE 906 882 5,087.0 5,087.0 0.0 142,853.7 140,303.8 5,532.0 6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
657,312 4,508,161 115,005,930
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 AuMust, 2001 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
744.0 744.0 0.0 YEAR TO DATE CUMULATIVE 906 882 5,831.0 5,831.0 0.0 143,597.7 141,047.8 5,532.0 6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
656,257 5,164,418 115,662,187
OPERATING DATA REPORT 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 September, 2001 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
720.0 720.0 5 Unit Reserve Shutdown Hours.
0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
638,406 5,802,824 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD YEAR TO DATE CUMULATIVE 906 882 6,551.0 6,551.0 0.0 144,317.7 141,767.8 5,532.0 116,300,593
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 October, 2001 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
YEAR TO DATE CUMULATIVE 906 882 745.0 723.0 0.0 7,296.0 7,274.0 0.0 145,062.7 142,490.8 5,532.0 6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
625,446 6,428,270 116,926,039
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 November, 2001 CUMULATIVE 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
906 882 720.0 720.0 0.0 8,016.0 7,994.0 0.0 616,050 7,044,321 MONTH YEAR TO DATE 145,782.7 143,210.8 5,532.0 117,542,090
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 December, 2001 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
906 882 744.0 744.0 0.0 8,760.0 8,738.0 0.0 660,685 7,705,006 MONTH YEAR TO DATE CUMULATIVE 146,526.7 143,954.8 5,532.0 118,202,775
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 January, 2002 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
YEAR TO DATE CUMULATIVE 906 882 744.0 719.3 0.0 744.0 719.3 0.0 147,270.7 144,674.1 5,532.0 6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
619,713 619,713 118,822,488
OPERATING DATA REPORT DOCKET NO.
50-0346 UNIT NAME Davis-Besse Unit 1 DATE 08/06/02 COMPLETED BY A. S. Quaderer TELEPHONE 419-321-7384 REPORTING PERIOD February, 2002 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net).
906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
882 The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
363.6 1,107.6 147,634.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
362.9 1,082.2 145,037.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
309,310 929,023 119,131,798 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 March, 2002 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
0.0 1,107.6 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
0.0 1,082.2 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
0 929,023 MONTH YEAR TO DATE CUMULATIVE 906 882 147,634.3 145,037.1 5,532.0 119,131,798
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 April, 2002 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
906 882 0.0 1,107.6 0.0 1,082.2 0.0 0.0 0
929,023 MONTH YEAR TO DATE CUMULATIVE 147,634.3 145,037.1 5,532.0 119,131,798
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 May, 2002 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
906 882 0.0 1,107.6 0.0 1,082.2 0.0 5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
0.0 MONTH YEAR TO DATE CUMULATIVE 147,634.3 145,037.1 5,532.0 119,131,798 0
929,023
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-0346 Davis-Besse Unit 1 08/06/02 A. S. Quaderer 419-321-7384 June. 2002 MONTH 1 Design Electrical Rating (MWe-Net).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line.
(Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5 Unit Reserve Shutdown Hours.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
YEAR TO DATE CUMULATIVE 906 882 0.0 0.0 0.0 1,107.6 1,082.2 0.0 147,634.3 145,037.1 5,532.0 6 Net Electrical Energy (MWH).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega watt hours. Negative quantities should not be used.
0 929,023 119,131,798
NOP-LP-2001-01 CONDITION REPORT CR Number TITLE:
NET GENERATION UNDERREPORTED ON NRC MONTHLY OPERATING REPORT 02-03860 DISCOVERY DATE TIME EVENT DATE TIME SYSTEM I ASSET#
8/6/2002 0900 n/a n/a N/A N/A EQUIPMENT DESCRIPTION N/A DESCRIPTION OF CONDITION and PROBABLE CAUSE (if known) Summarize any attachments. Identify what, when, where, why, how.
A calculation error caused the calculation of station house power to be approximately 3% high since R
July of 2001. As a result, the monthly net generation reported on the NRC operating report for the R
months of July 2001 - February 2002 was lower than it should have been. Monthly data for March G
June of 2002 was unaffected as house power is not reported if the station output breakers are open.
G Cumulative data on all reports were reported low. This CR has been generated to document the I
error.
N A
T SUPV COMMENTS I IMMEDIATE ACTIONS TAKEN (Discuss CORRECTIVE ACTIONS completed, basis for closure.)
I Corrected reports have been prepared and are to be included in this months report submittal to the O
NRC. This should be classified as CC the cause of the error is know, has been corrected and the N
reports have been corrected. No further action is required.
QUALITY ORGANIZATION USE ONLY IDENTIFIED BY (Check one)
ED Self-Revealed ATTACHMENTS Quality Org. Initiated ED Yes W IndividualiWork Group D] Internal Oversight Quality Org. Follow-up El Yes Dl No El Supervision/Management El External Oversight
[- Yes W No ORIGINATOR ORGANIZATION DATE SUPERVISOR DATE PHONE EXT.
QUADERER, A PE 8/8/2002 BARRON, J.
i 8/9/2002 8394 SRO EQUIPMENT EVALUATION IMMEDIATE ORGANIZATION MODE CHANGE REVIEW OPERABLE REQUIRED INVESTIGATION REQUIRED NOTIFIED RESTRAINT REl Yes No E Ys DE No
-N/A
[
Yes [] No El Yes W No N/A
[1 Yes RI No L
I]Ys[
o[
es[
O[
/,
A MODE i ASSOCIATED TECH SPEC NUMBER(S)
ASSOCIATED LCO ACTION STATEMENT(S)
N T
- 2 O
DECLARED REPORTABLE?
One Hour N/A APPLICABLE UNIT(S)
INOPERABLE (Date/ Time) El]Yes 6dNo E
N/A EljEval Required Other N/A 66Ul UD U2 El Both R
COMMENTS A
N/A T~
0 N
Current Mode - Unit I Power Level - U4161 Cuenod-Unit 2 Power Level - Unit 2 S
N/A N/A N/A NIA SRO - UNIT I SRO - UNIT 2 DATE Approved By Supv 8/9/2002 CATEGORYI EVAL ASSIGNED ORGANIZATION DUE DATE R! REPORTABLE?
Ejl Yes El No El LER No.
-G CRPA TREND CODES Comp Type IID Resp u
REPORTABILITY REVIEWER Process I Activity I Cause Code(s)
(If Cause T or W)
Org A
DATE
/
R MRB Y