MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0525902392005-09-13013 September 2005 August 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0522803442005-08-11011 August 2005 July 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0519903562005-07-14014 July 2005 June 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0516702922005-06-14014 June 2005 May 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0513704582005-05-13013 May 2005 April 2005 Monthly Operating Report for Davis-Besse, Unit 1 ML0510402512005-04-12012 April 2005 March 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0507302372005-03-10010 March 2005 February 2005 Monthly Operating Report for Davis-Besse Unit 1 ML0504601962005-02-10010 February 2005 January 2005 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0502100522005-01-14014 January 2005 December 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0435101212004-12-14014 December 2004 November 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0432101612004-11-12012 November 2004 October 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0429200442004-10-14014 October 2004 September 2004 Monthly Operating Report for Davis-Besse ML0425904932004-09-13013 September 2004 August 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0423001512004-08-12012 August 2004 July 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0419706432004-07-14014 July 2004 June 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0418401302004-06-30030 June 2004 April 2004 Monthly Operating Report for Davis-Besse, Revision 1 ML0413504852004-05-13013 May 2004 April 2004 Monthly Operating Report for Davis-Besse, Unit 1 ML0410702422004-04-14014 April 2004 March 2004 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0407605212004-03-12012 March 2004 February 2004 Monthly Operating Report for Davis-Besse, Unit 1 ML0404901912004-02-13013 February 2004 January 2004 Monthly Operating Report for Davis-Besse, Unit 1 ML0401604412004-01-14014 January 2004 December 2003 Monthly Operating Report for Davis-Besse, Unit 1 ML0335100202003-12-12012 December 2003 November 2003 Monthly Operating Report for Davis-Besse Unit 1 ML0332103562003-11-13013 November 2003 October 2003 Monthly Operating Report for Davis-Besse ML0328904372003-10-14014 October 2003 September 2003 Monthly Operating Report for Davis-Besse Unit 1 ML0325907872003-09-12012 September 2003 August 2003 Monthly Operating Report for Davis-Besse, Unit 1 ML0322702142003-08-13013 August 2003 July 2003 Monthly Operating Report for Davis-Besse, Unit 1 ML0319601852003-07-11011 July 2003 June 2003 Monthly Operating Report for Davis Besse Nuclear Power Station Unit 1 ML0316806382003-06-12012 June 2003 May 2003 Monthly Operating Report for Davis Besse Nuclear Power Station Unit 1 ML0313600242003-05-13013 May 2003 April 2003 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0310500312003-04-11011 April 2003 March 2003 Monthly Operating Report for Davis-Besse Unit 1 ML0307602552003-03-13013 March 2003 February 2003 Monthly Operating Report for Davis-Besse, Unit 1 ML0305000812003-02-13013 February 2003 January 2003 Monthly Operating Report for Davis-Besse, Unit 1 ML0301602002003-01-13013 January 2003 December 2002 Monthly Operating Report for Davis Besse Unit 1 ML0235000122002-12-12012 December 2002 November 2002 Monthly Operating Report for Davis Besse, Unit 1 ML0236001132002-12-12012 December 2002 November 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station ML0231900852002-11-13013 November 2002 October 2002 Monthly Operating Report for Davis-Besse Unit 1 ML0228901252002-10-11011 October 2002 September 2002 Monthly Operating Report for Davis Besse Nuclear Power Station Unit 1 ML0225900712002-09-12012 September 2002 August 2002 Monthly Operating Report for Davis-Besse Unit 1 ML0223102462002-08-13013 August 2002 July 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station, Unit 1 ML0219600452002-07-11011 July 2002 June 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station ML0216901992002-06-12012 June 2002 May 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 ML0213600122002-05-14014 May 2002 April 2002 Monthly Operating Report for Davis-Besse Unit 1 ML0210501652002-04-10010 April 2002 March 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station, Unit 1 ML0207204702002-03-0808 March 2002 February 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station, Unit 1 ML0205100702002-02-13013 February 2002 January 2002 Monthly Operating Report for Davis-Besse Nuclear Power Station, Unit 1 ML0201604882002-01-10010 January 2002 December 2001 Monthly Operating Report for Davis-Besse 2005-09-13
[Table view] |
Text
FirstEneWn Davis-Besse Nuclear Power Station 550, North Oak Harbor, OhioState Route 2 43449-9760 Docket No. 50-346 License No. NPF-3 Serial No. 3171 July 14, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Monthly Operating Report, June 2005 Davis-Besse Nuclear Power Station Unit I Ladies and Gentlemen:
Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of June 2005.
Please direct questions to Brian D. Boles, Manager - Plant Engineering, at (419) 321-7302.
Very truly yours, Barry S. Allen Director- Site Operations Davis-Besse Nuclear Power Station KJA/s Enclosures cc: DB-1 NRC/NRR Project Manager DB-1 Senior Resident Inspector NRC Region m Administrator
Docket No. 50-346 License No. NPF-3 Serial No. 3171 Distribution bcc: B. S. Allen, DB-2101 A. W. Bless, DB-3065 B. D. Boles, DB-1056 D. R. Converse, DB-3310 J. J. Grabnar, DB-3210 L. J. Kovach, DB-1056 A. R. Miller, DB-1056 G. C. Wilson, DB-2103 D. R. Wuokko, DB-3065 CNRB Administrator D. W. Jenkins, GO-18 R. Runo, GO-14 T. Schneider, A-GO-17 F. Heizer, PUCO B. Lewis, Utility Data Institute, Inc.
R. Schomaker, Framatome American Nuclear Insurers INPO Records Center Ohio EPA - DERR Compliance Utility Radiological Safety Board
Docket No. 50-346 License No. NPF-3 Serial No. 3171 Page I of I COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419) 321-8585 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
Commitments Due Date None N/A
Docket No. 50-346 License No. NPF-3 Serial No. 3171 Monthly Operating Report for June 2005 (two pages to follow)
-t .*
UNIT SHUTDOWNS DOCKET NO. 50-346 UNIT NAME Davis-Besse #1 DATE 7/01/05 COMPLETED BY A.R. Miller REPORTING PERIOD: June, 2005 TELEPHONE (419) 321-7824 NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS No Unit Shutdowns
SUMMARY
The reactor was at 100% power for the majority of the month. On June 5, the unit down powered to approximately 93% for Main Turbine Control Valve and Combined Intermediate Valve Testing.
(1) Reason: (2) Method:
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E.Operator Training & License Exam 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1 DATE 07/01/05 COMPLETED BY A. R. Miller TELEPHONE 419-321-7824 REPORTING PERIOD June, 2005 YEAR TO MONTH DATE CUMULATIVE 1 Design Electrical Rating (MWe-Net). 906 The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2 Maximum Dependable Capacity (MWe-Net). 882 The gross electrical output as measured at Ihe output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
3 Number of Hours the Reactor Was Critical. 720.0 3,786.9 158,233.2 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4 Number of Hours the Generator Was On Line. 720.0 3,770.0 155,436.1 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.
The sum of the hours the generator was on line plus the total outage hours should equal the gross hours In the reporting period.
5 Unit Reserve Shutdown Hours. 0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6 Net Electrical Energy (MWH). 637,405 3,350,563 128,260,786 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-watt hours. Negative quantities should not be used.