UNITED STATES NUCLEAR REGULATORY COMMISSION ber 17, 2018
SUBJECT:
NINE MILE POINT NUCLEAR STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000220/2018010 AND 05000410/2018010
Dear Mr. Hanson:
On September 27, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station (NMPNS), Units 1 and 2. On September 27, 2018, the NRC inspectors discussed the results of this inspection with Mr. Peter Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR ), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket Numbers: 50-220 and 50-410 License Numbers: DPR-63 and NPF-69
Enclosure:
Inspection Report 05000220/2018010 and 05000410/2018010
Inspection Report
Docket Numbers: 05000220 and 05000410 License Numbers: DPR-63 and NPF-69 Report Numbers: 05000220/2018010 and 05000410/2018010 Enterprise Identifier: I-2018-010-0068 Licensee: Exelon Generation Company, LLC (Exelon)
Facility: Nine Mile Point Nuclear Station, LLC (NMPNS)
Units 1 and 2 Location: Oswego, New York Inspection Dates: September 10, 2018, to September 27, 2018 Inspectors: D. Kern, Senior Reactor Inspector (Team Lead)
L. Dumont, Reactor Inspector C. Hobbs, Reactor Inspector A. Patel, Senior Reactor Inspector J. Patel, Reactor Inspector J. Rady, Reactor Inspector D. Werkheiser, Senior Reactor Inspector Approved By: G. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
NMPNS Units 1 and 2 by conducting the triennial fire protection team inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or more-than-minor violations were identified.
INSPECTION SCOPES
This inspection was conducted using the appropriate portions of the inspection procedure (IP) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
NMPNS Unit 1: 71111.05XT - Fire Protection - NFPA 805 (Triennial) The inspectors evaluated the following from September 10 - 27, 2018:
Fire Protection Inspection Requirements (3 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas (FA) and/or fire zones (FZ):
- (1) FA 2 / FZ R3B, Reactor Building West (elevation 281)
- (2) FA 5 / FZ T3B, Turbine Building West of Main Steam Isolation Valve Room (elevations 237, 261, 277)
- (3) FA 11/ FZ C2, Auxiliary Control Room, Computer Room (elevation 261)
In performing this review, the inspectors performed an analysis of the following electrical circuits:
- (1) PMP-80-23 (and associated power supply breaker), Containment Spray Pump 122
- (2) PMP-28-15, Control Rod Drive Pump 11 NC08A
- (3) IV-39-05, Emergency Cooling Loop 11 Condensate Return Air Operated Isolation Valve
- (4) IV-39-10R, Motor Operated Loop 12 Steam Outlet Inside Isolation Valve 121
- (5) LI-60-22C, Emergency Condenser 111-112 Level Indicator Remote Shutdown
B.5.b Inspection Activities (1 Samples)
The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:
- (1) N1-DRP-OPS-001 (section 6.6.1), Venting Primary Containment without AC power Method 1; Reverse Flow Using the Large De-inerting Lines NMPNS Unit 2: 71111.05T - Fire Protection (Triennial)
The inspectors evaluated the following from September 10 - 27, 2018:
Fire Protection Inspection Requirements (4 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones:
- (1) FA 2 / FZ 204SW, Reactor Building, Reactor Core Isolation Cooling (RCIC) Pump Room (elevation 175)
- (2) FA 24/ FZ 356NZ/354SG, Control Building, Power Generation Control Complex Relay Room (elevation 288)
- (3) FA 3 / FZ 208 SW, C Residual Heat Removal (RHR) Pump Room, South Auxiliary Bay (elevation 175)
In performing this review, the inspectors performed an analysis of the following electrical circuits:
- (1) 2ICS*MOV120, RCIC Steam Supply Valve to Turbine
- (2) 2ICS*FE101, RCIC Flow Instrument
- (3) 2RHS*P1B, B RHR Pump
- (4) 2RHS*MOV15B, B RHR Reactor Containment Spray
- (5) 2EGS*EG3, 4160-V ACB-103-14 Division II Emergency Diesel Generator Output Breaker
- (6) 2CMS*TE54A, Suppression Pool Temperature Element
B.5.b Inspection Activities (1 Samples)
The inspectors evaluated feasibility of the following B.5.b Mitigating Strategies:
- (1) N2-DRP-OPS-001 (section 7.2.10), Injection of an Alternate Water Source into the Reactor Pressure Vessel via Residual Heat Removal Train A
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 27, 2018, the inspectors presented the triennial fire protection team inspection results to Mr. Peter Orphanos, Site Vice President, and other members of the Exelon staff.
DOCUMENTS REVIEWED
71111.05XT
Fire Protection Licensing and Design Basis Documents
DBD-Appendix R, Appendix R Safe Shutdown System, Revision 11
DCD-805, Nine Mile Point Unit 1 NFPA 805 Design Criteria, Revision 1
E208, Nine Mile Point 1 Nuclear Safety Capability Assessment, Revision 0
N1-FQ-F001, Fire PRA Notebook, Revision 5
N1-FRE-F001, Fire Risk Evaluation Report, Revision 3
Nine Mile Point Nuclear Station Unit 2, Renewed Facility Operating License NPF-69,
Amendment No. 144
Nine Mile Point Nuclear Station Unit 2, Updated Safety Analysis Report, Revision 22
NMP Unit 2 USAR - Chapter 9.5, Other Auxiliary Systems - Fire Protection System,
Revision 23
NMP Unit 2 USAR - Appendix 9A, Degree of Compliance with Branch Technical Position
CMED 9.5-1, Revision 2
NMP Unit 2 USAR - Appendix 9B, Appendix R Review Safe Shutdown Evaluation, Degree of
Compliance with Branch Technical Position CMED 9.5-1, Revision 22
NUREG-1047, Safety Evaluation Report (SER) related to the Operation of NMP Unit 2, dated
2/1985
NUREG-1047, SER Supplement 1 - NMP Unit 2, dated 07/1985
NUREG-1047, SER Supplement 2 - NMP Unit 2, dated 11/1985
NUREG-1047, SER Supplement 3 - NMP Unit 2, dated 07/1985
NUREG-1047, SER Supplement 4 - NMP Unit 2, dated 09/1986
NUREG-1047, SER Supplement 5 - NMP Unit 2, dated 10/1986
NUREG-1047, SER Supplement 6 - NMP Unit 2, dated 07/1987
Calculations, Analysis, and Engineering Evaluations
51-9156521-000, Recovery Action Review for Nine Mile Point Nuclear Power Station Unit 1
Transition to NFPA 805, Revision 0
130-5007D, Halon 1301 Evaluation - NMP2, Underfloor Area Zone #354SG, dated 04/08/1986
1NER-1E-035, Resolution of Issues Related to Fire-Induced Circuit Failures, Revision 2
1NER-1E-037, Nine Mile Point Unit 1 NFPA 805 - Cable Selection, Revision 1
1NER-1E-039, Nine Mile Point Unit 1 NFPA 805 Coordination Study, Revision 0
A10.1-N-401, Appendix R Service Water Flow Evaluation, Revision 0
E208, Nine Mile Point 1 Nuclear Safety Capability Assessment, Revision 0
EC-160, 125 VDC Breaker Coordination, Revision 0
EC-166, 4160 VAC Safety Related Breaker Coordination, Revision 0
EC-49, DC Short Circuit, Revision 7
ECP-12-000299, Multiple Spurious Operations (MSO) - 2RHS*MOV15A, 15B, 25A, and 25B,
Revision 0
ECP-12-000571, Unit 1 NFPA Transition Project - Modification for BV-37-01(02) Reactor Head
Vent Valves, Revision 0
ECP-12-000574, Reactor Water Cleanup System (RWCS), Revision 002
ECP-12-000576, Form 7 - Design Change Technical Evaluation, Revision 0
ECP-12-000658, Portable Charger for Existing Battery Chargers, Revision 0
ECP-13-000516 - NMP U2 Fire Protection Improvement Project - Fire Panel Replacement for
Local Fire Control Panels Upgrade for 2FPM-PNL131, Revision 0
ECP-13-000517 - NMP U2 Fire Protection Improvement Project - Fire Panel Replacement for
Local Fire Control Panels Upgrade for 2FPM-PNL128, Revision 0
ECP-13-000520 - NMP U2 Fire Protection Improvement Project - Fire Panel Replacement for
Local Fire Control Panels Upgrade for 2FPM-PNL129, Revision 3
ECP-13-000973, Fire Protection Review, dated 11/21/13
ECP-13-000973, Form 7 - Design Change Technical Evaluation, Revision 0
ECP-13-000972, Form 7 - Design Change Technical Evaluation, Revision 0
ECP-14-000514, Form 7 - Design Change Technical Evaluation, Revision 0
ECP-15-000297, Unit 2 Open Phase Detection Implementation (ABS and RTX Transformers),
Revision 1
ECP-18-000425, Temporary Modification for 2MTX-XM1A Low Conservator Oil Alarm,
Revision 0
FPEE1-12-001, Evaluation of NMP 1 Appendix R Exceptions for Transition to NFPA 805,
Revision 01
FPEE2-14-001, Fire Protection Engineering Evaluation - DC Hot Shorts on Non-safety Related
Ammeter Circuits, Revision 0
FPEE2-17-002, Use of Non IEEE-383 Rated Cabling in Power Generation Control Complex,
Revision 0
N1-HRA-F001, Fire PRA Notebook Human Reliability Analysis NMP1, Revision 4
NMP Unit 1 Fire PRA Notebook, Human Reliability Analysis, Revision 4
NMP Unit 1 PRA Success Criteria Notebook, Revision 0
S13.1100F002, Fire Protection Water Supply, dated 4/12/07
Drawings and Wiring Diagrams
0007.241-001-009, Nine Mile Point Unit 2 Elementary Diagram, Residual Heat Removal
System, Revision 3
0007.241-001-016, Nine Mile Point Unit 2 Elementary Diagram, Residual Heat Removal
System, Revision 4
0007.245-001-022, Nine Mile Point Unit 2 Elementary Diagram, Reactor Core Isolation Cooling
System, Revision 4
0007.511-980-574, Nine Mile Point Unit 2 Wiring Diagram, Remote Shutdown Panel 2CES*405,
Revision 3
01040209024, Nine Mile Point Unit 2, Control Schematic 2CES*IPNL406 (G) &
2CES*IPNL408 (Y), Revision 3
2177-EE-11HB-2, Nine Mile Point Unit 2 Wiring Diagram, Misc. Equipment, Revision 2
2177-EE-IJ-9, Nine Mile Point Unit 2 13.8KV One Line Diagram, Emergency Bus
2EPS*SWG001, 002, 003, 004, & Normal Bus 2NPS-SWG004, 005, Revision 9
2177-ESK-11RSS05, Nine Mile Point Unit 2 Wiring Diagram, D.C. Misc. Circuits - Suppression
Pool Temperature Selector, Revision 2
2177-ESK-5EGP03, Nine Mile Point Unit 2
- D.C. Elementary Diagram, Standby Diesel
Generator 2EGS*EG3 ACB103-14, Sht.s 1-2, Revision 18
2177-ESK-5RHS05, Nine Mile Point Unit 2
Pump 1B, Revision 6
2177-ESK-5SWP01, Sht. 1, Service Water Pump 1A Elementary Diagram, Revision 13
2177-ESK-5SWP01, Sht. 2, Service Water Pump 1A Elementary Diagram, Revision 13
2177-ESK-5SWP02, Sht. 1, Service Water Pump 1B Elementary Diagram, Revision 13
2177-ESK-5SWP03, Sht. 1, Service Water Pump 1C Elementary Diagram, Revision 15
2177-ESK-5SWP04, Sht. 1, Service Water Pump 1D Elementary Diagram, Revision 14
807E170TY, Nine Mile Point Unit 2 Elementary Diagram, Residual Heat Removal System,
Revision 27
B-40142-C Sht. 5, Fire Zones Reactor Bldg. F
- L. EL.237 and 250, Revision 2
B-40143-C Sht. 5, Fire Zones Reactor Bldg. F
- L. EL.261, Revision 2
B-40144-C, Fire Zones Reactor Building/Turbine Building el. 281/277, Revision 1
B-40144-C Sht. 5, Fire Zones Reactor Bldg. F
- L. EL.277 and 281, Revision 2
C-18002-C, Sht. 1, Main Steam & High Pressure Turbine, Revision 49
C-18002-C, Sht. 2, Main Steam & High Pressure Turbine, Revision 36
C-18007-C, Sht. 1, Reactor Core Spray, Revision 62
C-18012-C, Sht. 1, Reactor Containment Spray Raw Water System, Revision 26
C-18015-C, Reactor Vessel Instrumentation P&ID Diagram, Revision 42
C-18017-C, Emergency Cooling System P&I Diagram, Revision 56
C-18030-C Sht. 2, Fire Protection Foam & Spray Water P&I Diagram, Revision 15
C-18030-C Sht. 3, Fire Protection Water System P&I Diagram, Revision 42
C-18030-C Sht. 4, Fire Protection Water System P&I Diagram, Revision 21
C-18030-C Sht. 5, Fire Protection Water System P&I Diagram, Revision 24
C-18030-C Sht. 6, Fire Protection Water System P&I Diagram, Revision 33
C-18030-C Sht. 7, Fire Protection Water System P&I Diagram, Revision 25
C-18030-C Sht. 8, Fire Protection Water System P&I Diagram, Revision 15
C-18039-C Sht. 2, Cardox Fire Extinguishing System, Revision 9
C-18039-C Sht. 3, Cardox Fire Extinguishing System, Revision 13
C-19409-C, Sht. 1B, Unit 1 AC Station Power Distribution One Line Diagram, Revision 18
C-19410-C, Sht. 6, Unit 1 4.16 kV Emergency Power Board & Diesel Generator, Revision 25
C-19436-C, Sht. 2, Unit 1 Elementary Wiring Diagram 600V Power Board #16, Revision 19
C-19437-C, Sht. 6, Unit 1 Elementary Wiring Diagram 600V Power Board 161B, Revision 26
C-19839-C, Sht. 19, Unit 1 One Line Diagram 125 VDC Control Bus, Revision 13
C-19839-C, Sht. 2, Unit 1 One Line Diagram 125 VDC Control Bus, Revision 23
C-19839-C, Sht. 3, Unit 1 One Line Diagram 125 VDC Control Bus, Revision 25
C-19839-C, Sht. 9, Unit 1 One Line Diagram 125 VDC Control Bus, Revision 4
C-19859-C, Sht. 8, Unit 1 Reactor Protection System, Revision 51
C-19859-C, Sht. 8A, Unit 1 Reactor Protection System, Revision 25
C-22014-C, Sht. 1, Unit 1 Wiring Diagram Emergency Cooling, Revision 18
C-23107-C, Sht. 2, Unit 1 Auxiliary Control Cabinet Emergency Cooling, Revision 29
C-34812-C, Sht. 1, Unit 1 Remote Reactor Shutdown System, Revision 7
C-34813-C, Sht. 1, Unit 1 Wiring Diagram Remote Reactor Shutdown System, Revision 13
EB-22A, Nine Mile Point Unit 2, Fire Protection Arrangement Unit 2 Station Buildings Plan
Elevation 175 & 198, Revision 15
EB-22C, Nine Mile Point Unit 2, Fire Protection Arrangement Unit 2 Station Buildings Plan
Elevation 237 & 240, Revision 19
EB-22D, Nine Mile Point Unit 2, Fire Protection Arrangement Unit 2 Station Buildings Plan
Elevation 250 & 274, Revision 22
EB-22E, Nine Mile Point Unit 2, Fire Protection Arrangement Unit 2 Station Buildings Plan
Elevation 277 & 288, Revision 20
EE-001C, Nine Mile Point Unit 2 Main One Line Diagram, 4.16KV Auxillary Transformer Normal
4.16KV & 600V System, Revision 13
EE-001CN, Nine Mile Point Unit 2 125V DC One Line Diagram, Emergency Switchgear
2BYS*SWG002B, Revision 18
EE-001D, Nine Mile Point Unit 2 Main One Line Diagram, Emergency 4.16KV & 600V System ,
Revision 19
EE-001P, Nine Mile Point Unit 2 4160V One Line Diagram, Normal Bus 2NNS-SWG017 &
2NNS-SWG018, Revision 11
EE-001R, Nine Mile Point Unit 2 4160V One Line Diagram, 2ENS*SWG103 Emergency Bus,
Revision 16
EE-009NK, Nine Mile Point Unit 2 Wiring Diagram, 2EHS*MCC303 Bus D Control Room Bldg.
EL 261, Revision 6
EE-009SG, Nine Mile Point Unit 2 Wiring Diagram, 600V 2EHS*MCC303 Control Room Bldg.
EL 261, Revision 6
EE-011HA, Nine Mile Point Unit 2 Wiring Diagram, Misc. Equipment, Revision 6
EE-1AW, Nine Mile Point Unit 2 One Line Diagram, 600V 2EHS*MCC302 Reactor Building
Auxillary Bay South, Revision 14
EE-1CP, Nine Mile Point Unit 2 One Line Diagram, 125 VDC 2DMS*MCCA1 Auxillary Building,
Revision 15
EE-1K, Nine Mile Point Unit 2 4160V One Line Diagram, Normal Bus 2NNS-SWG011 &
2NNS-SWG012, Revision 13
EE-1L, Nine Mile Point Unit 2 4160V One Line Diagram, Normal Bus 2NNS-SWG013,
Revision 12
EE-1M, Nine Mile Point Unit 2 4160V One Line Diagram, Normal Bus 2NNS-SWG014,
Revision 11
EE-1N, Nine Mile Point Unit 2 4160V One Line Diagram, Normal Bus 2NNS-SWG015,
Revision 11
EE-1Q, Nine Mile Point Unit 2 4160V One Line Diagram, 2ENS*SWG101 Emergency Bus,
Revision 16
EE-3MG, Nine Mile Point Unit 2 Wiring Diagram, Remote Shutdown Panel - 2CES*PNL405,
Revision 4
EE-M01F, Nine Mile Point Unit 2 Plant Master One Line Diagram, Emergency & Normal 125V &
24/48 VDC, Revision 8
EE-MO001A, Nine Mile Point Unit 2 Plant Master One Line Diagram, Normal Power Distribution,
Revision 23
EE-MO001B, Nine Mile Point Unit 2 Plant Master One Line Diagram, Emergency Power
Distribution, Revision 9
ESK-06RHS008, Nine Mile Point Unit 2 Elementary Diagram, Residual Heat Removal 600V
MCC Circuit, Sht. 1, Revision 8
ESK-11ICS01, Nine Mile Point Unit 2 Elementary Diagram, Reactor Core Isolation Cooling
Steam Valve to Turbine 2ICS*MOV120, Revision 12
F-45094-C, Fire Protection Halon P&I Diagram, Revision 6
FSK-11RSS07, Nine Mile Point Unit 2 Elementary Diagram, 125 VDC Remote Shutdown
System, Revision 8
FSK-33-2C, Nine Mile Point Unit 2 Loop Diagram, Containment Atmosphere Monitoring -
2CMS*54, Revision 7
PID-31A, Nine Mile Point Unit 2 P&ID, Residual Heat Removal System, Revision 25
PID-31B, Nine Mile Point Unit 2 P&ID, Residual Heat Removal System, Revision 22
PID-82B-21, Nine Mile Point Unit 2 P&ID, Containment Atmosphere Monitoring System,
Revision 21
TL2CMS-065, Nine Mile Point Unit 2 Test Loop Diagram, Suppression Pool Water Temperature
- 2CMS*TE54A, Sht.s 1-2, Revision 2
TL2ICS-018, Nine Mile Point Unit 2 Test Loop Diagram, 2ICS*P1 Discharge Flow 2ICS*FT101,
Sht.s 1-4, Revision 4
W-4162-S; Drawing EP-116C-20, Revision 20
W-6746-C; Drawing 12177-EP-64X-18, Revision 18 and 12177-EP-64BB-4, Revision 4
Fire Brigade Drills and Critiques
Crew A Announced Drill Critique, dated 06/03/2018
Crew B Announced Drill Critique, dated 06/03/2018
Crew B Announced Drill Critique, dated 04/14/2018
Crew B UnSat Drill Critique, dated 04/04/2018
Crew B Unannounced Drill Critique, dated 03/28/2018
Crew C Announced Drill Critique, dated 06/02/2018
Crew D Announced Drill Critique, dated 06/09/2018
Crew D Unannounced Drill Critique, dated 11/29/2017 (NEIL Drill)
Crew E Announced Drill Critique, dated 06/09/2018
End of the Year Fire Drill Review, Completed on 12/28/16
End of the Year Fire Drill Review, Completed on 12/15/17
Fire Drill quarterly Review, Completed on 6/28/16
Fire Drill quarterly Review, Completed on 9/27/16
Fire Drill quarterly Review, Completed on 12/28/16
Fire Drill quarterly Review, Completed on 3/24/17
Fire Drill quarterly Review, Completed on 6/25/17
Fire Drill quarterly Review, Completed on 10/6/17
Fire Drill quarterly Review, Completed on 12/31/17
NMP Unsatisfactory Drill Summary, dated 08/22/2018
NMP Unannounced Drill Schedule 2016 - 2018, dated 08/22/2018
OP-AA-201-003, Announced Fire Drill Record, Completed on 7/13/16
OP-AA-201-003, Announced Fire Drill Record, Completed on9/7/16
OP-AA-201-003, Announced Fire Drill Record, Completed on 2/24/16
OP-AA-201-003, Announced Fire Drill Record, Completed on11/15/17
OP-AA-201-003, Announced Fire Drill Record, Completed on 2/25/17
OP-AA-201-003, Unannounced Fire Drill Record, Completed on 11/15/17
OP-AA-201-003, Unannounced Fire Drill Record, Completed on 11/29/17
OP-AA-201-003, Unannounced Fire Drill Record, Completed on 12/2/17
OP-AA-201-003, Unannounced Fire Drill Record, Completed on12/3/17
OP-AA-201-003, Unannounced Fire Drill Record, Completed on 12/10/17
Fire Fighting Strategies (i.e., Pre-Fire Plans)
N1-PFP-0101, Unit 1 Pre-Fire Plans, Revision 5
N2-FPI-PFP-0201, Nine Mile Point Unit 2 Pre-Fire Plans, Revision 5
NMP Fire Brigade Training Lesson Plans, dated 08/22/2018
Issue Reports (* written as a result of the NRC inspection)
2386737 02731612 04153695 04177242*
2451647 03985725 04165743 04177243*
2466129 03987731 04168498* 04177301*
2512975 04009918 04171603* 04177325*
2525704 04056647 04172378* 04177360*
2539404 04060022 04172682* 04177602*
2574976 04134964 04172929* 04177679*
2594680 04146572 04172933* 04177717*
2631360 04147291 04173143* 04177730*
2641770 04148844 04173174* 04177789*
2719945 04148873 04173216*
2725444 04153260 04177236*
Maintenance Orders/Work Orders
C90944610 C93592851 C93539647 C93624893
C93455439 C93188022 C93623262 C92787911
C93455560 C92073139 C91916097 C91987944
C93469547 C93633239 C93621049 N2060027
C93469568 C93298175 C93161344 N2072150
C93470114 C92807105 C93628910 N2089806
C93470175 C92073136 C93633631 N2101337
C93470175 C93552754 C93068249 N2104141
C93502926 C92938470 C92299697 N2111453
C93586855 C93167744 C93533770
C99289531 C92038944 C93155172
C92902999 C93176027 C93619558
Operating Experience
NRC IN 2010-13, Failure to Ensure Post-Fire Shutdown Procedures Can be Performed
NRC IN 2014-10, Potential Circuit Failure-Induced Secondary Fires or Equipment Damage
NRC IN 2015-02, Anti-Freeze Agents in Fire Water Sprinkler Systems
NRC LER 05000-263/2016-002-01, Inadequate Floor Fire Barrier for Control Room
Procedures
CC-AA-201, Plant Barrier Control Program, Revision 12
CC-AA-206, Fuse Control, Revision 11
CC-AA-209, Fire Protection Program Configuration Change Review, Revision 6
CC-AA-211, Fire Protection Program, Revision 8
CC-AA-211-1001, Fire Protection Engineering Evaluations, Revision 2
ER-AA-610-1003, NFA 805 Monitoring Program, Revision 0
N1-ARP-K1, Control Room Panel K1, Revision 7
N1-DRP-GEN-004, Emergency Damage Repair for Fire Zones C2 and C3, Revision 12
N1-EOP-2, RPV Control, Revision 16
N1-EOP-8, RPV Blowdown, Revision 12
N1-SOP-21.1, Nine Mile Point Unit 2 Special Operating Procedure, Revision 14
N1-SOP-21.2, Control Room Evacuation, Revision 16
N2-ARP-FPM, Fire Computer System Alarm Response Procedures, Revision 16
N2-DRP-OPS-001, Emergency Damage Repair, Revision 1
N2-EOP-6.11, Nine Mile Point Unit 2 Emergency Operating Procedure, Defeating WCS System
Isolation Interlocks, Revision 1
N2-EPM-GEN-555, GE 13.8 KV MAGNE-BLAST Breaker, Revision 4
N2-EPM-GEN-V582, Molded Case Circuit Breaker and Thermal Overload Relay Testing,
Revision 23
N2-OP-78, Remote Shutdown System, Revision 14
N2-OSP-FOF-M001, ENGINE DRIVEN FIRE PUMP OPERABILITY & STORAGE TANK LEVEL
TEST, Revision 3
N2-SOP-03, Loss of AC Power, Revision 18
N2-SOP-34, Stuck Open Safety Relief Valve, Revision 6
N2-SOP-78, Control Room Evacuation, Revision 9
N2-SOP-101C, Reactor Scram, Revision 13
N2-SOP-101D, Rapid Power Reduction, Revision 10
OP-AA-201-001, Fire Marshal Tours, Revision 6
OP-AA-201-002, Fire Event reports, Revision 6
OP-AA-201-203, Fire Drill Performance, Revision 16
OP-AA-201-004, Fire Prevention for Hot Work, Revision 15
OP-AA-201-005, Fire Brigade Qualification, Revision 9
OP-AA-201-006, Control of Temporary Heat Generating Equipment, Revision 8
OP-AA-201-007, Fire Protection System Impairment Control, Revision 0
OP-AA-201-008, Pre-Fire Plan Manual, Revision 4
OP-AA-201-009, Control of Transient Combustible Material, Revision 20
OP-AA-201-011-1001, Fire Marshal Certification Process, Revision 4
OP-NM-102-106, Operator Response Time Program at NMP, Revisions 9 and 10
OP-NM-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL, Revision 0
OP-NM-201-105, Commentary Measures for Inoperable Fire Protection Systems and
Components, Revision 4
S-EPM-GEN-551, 600 VAC, 480 VAC, and 125 VDC ITE Breaker and Breaker Load Test,
Revision 7
S-EPM-GEN-813, Annual Inspection of Emergency Battery Light Units, Revision 4
TQ-AA-173, Emergency Services Training Programs, Revision 3
Completed Tests and Surveillances
C93522067, Remote Shutdown Emergency Condenser Level Control Loop Calibration,
completed on 03/08/18
Halon 1301 Acceptance Test - NMP 2, dated 07/11/1986
N2-EPM-GEN-20Y712, Motor Control Center Bus Work, completed 04/05/14
N2-EPM-GEN-R@576, Remote Shutdown Panel 2CES*PNL405 Switch Checks for
SW16-2RSSN95, SW10-2RSSN89, completed 05/07/18
N2-EPM-GEN-R@576, Remote Shutdown Panel 2CES*PNL405 Switches 2, 3, 4, 5, 11, &14,
completed 05/14/18
N2-EPM-RSS-578, 2CES*PNL415 and 2CES*PNL416 Switch Checks, completed 05/03/18
N2-FSP-FPP-R001, Fire Rated Assemblies (Penetrations) Visual Inspection Test, completed
03/24/2014, 04/04/2016, 05/01/2018
N2-FSP-FPW-R001, Electric / Diesel Fire Pump Functional Test, completed 11/17/2017
N2-ISP-FPM-A104, Functional Test of the Fire Detection Zones for 2FPM-PNL104, completed
07/26/18
N2-MPM-FPW-A854, Diesel Fire Pump Engine Inspection 2FPW-ENG1 (5 Year and Annual),
completed 07/23/2013
N2-OSP-FOF-M001, Engine Driven Fire Pump Operability & Storage Tank Level, completed
8/17/2018
N2-OSP-RSS-R001, RCIC Remote Shutdown System Test, completed 05/12/18
N2-OSP-RSS-R002, RHS Shutdown and Suppression Pool Cooling Mode Remote Shutdown
System Test, completed 05/04/18
N2-OSP-RSS-R003, Service Water Remote Shutdown Operability Test, completed 09/18/17
N2-OSP-RSS-R005, RHS Shutdown Cooling Mode MOV Isolation Remote Shutdown System
Test, completed 05/06/18
N2-OSP-RSS-R006, Nitrogen Supply to ADS Remote Shutdown System Test, completed
05/03/18
N2-PM-M007, Motor-Driven Fire Pump Operability Test, completed 07/27/2018
S-PM-004, Operation Equipment Inventories and Checklists, Completed on 6/14/18
S-PM-004, Operation Equipment Inventories and Checklists, Completed on 8/24/18
Miscellaneous Documents
List of Fire Brigade Members qualification Training, dated 9/13/18
MI-2AI-185, Foxboro 2AI-P2V Series Platinum Resistance to Voltage Converter Styles B and C,
issued August 1980
Nine Mile Point Nuclear Station Unit 2, Individual Plant Examination for External Events
(IPEEE), June 1995
NMP Operations Equipment Inventories and Checklists:
Quarterly Inspection/Inventory of Fire Brigade Turnout Gear, 2018
Quarterly Inspection/Inventory of Fire Brigade Turnout Gear, 2017
Quarterly Inspection/Inventory of Fire Brigade Turnout Gear, 2016
Annual Inventory, Fire Cabinet: U2, 2017
NMP Unit 1 Fire Impairment Log, dated 08/22/2018
NMP Unit 1 Fire Protection Program Health Report, Period 2018
NMP Unit 1 and Unit 2 Fire Protection System Health Report, dated 06/27/2018
NMP Unit 2 Fire Protection Program Health Report, dated 2018P1
NMP Unit 2 South Auxiliary Bay, Electrical Room, Elevation 20 Halon System Piping and
Nozzle Pictures, dated 2017
NMP Transient Combustible Permit Log, dated 08/22/2018
NMP Transient Combustible Permits; Permit ID 469, 470, 472,473 and 475
NMP Unit 2 Training Lesson Plan 2100-PLTSOJ004, Perform RCIC Reactor Operator Actions,
Revision 0
NMP Unit 2 Training Lesson Plan 2100-PLTSOPJ003, Unit 2, Perform Lower Control Building
Actions, Revision 0
NMP Unit 2 Training Lesson Plan 2101-SOP78C01, N2-SOP-78, Unit 2, Control Room
Evacuation, Revision 0
NRC Information Notice 2014-10, Potential Circuit Failure Induced Secondary Fires or
Equipment Damage, issued 09/16/14
NRC Information Notice 2017-06, Battery and Battery Charger Short-Circuit Current
Contributions to a Fault on the Direct Current Distribution System, issued 09/26/17
PI-AA-126-1001, NMP-2018 Fire Protection Self-Assessment, completed 07/10/18
SAS-TR-95-001, NMP-2 IPEEE, dated 06/1995