August 30, 2022
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000220/2022401 AND 05000410/2022401
Dear David Rhoades:
On August 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station, Units 1 and 2, and discussed the results of this inspection with Pete Orphanos, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket Nos. 05000220 and 05000410 License Nos. DPR-63 and NPF-69
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000220 and 05000410
License Numbers:
Report Numbers:
05000220/2022401 and 05000410/2022401
Enterprise Identifier: I-2022-401-0053
Licensee:
Constellation Energy Generation, LLC
Facility:
Nine Mile Point Nuclear Station, Units 1 and 2
Location:
Lycoming, NY
Inspection Dates:
August 8, 2022 to August 10, 2022
Inspectors:
D. Caron, Senior Physical Security Inspector
T. Eck, Physical Security Inspector
M. Ordoyne, Physical Security Inspector
Approved By:
Daniel L. Schroeder, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Nine Mile Point Nuclear Station,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: 5 Requirements (02.09, 02.10 a-c, 02.11 a)
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: 10 Requirements (02.06 c, 02.07 a, 02.08 a-d,f-i)
- Tier III: 1 Requirement (02.09)
71130.08 - Fitness for Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection elements. A portion of the inspection was conducted at Limerick Generating Station to review corporate elements of this inspection procedure including interviews of the Constellation fleet medical review officer and substance abuse expert, and fitness for duty documents related to blind samples, random testing files, laboratory audits and reports, specimen collector training, secure methodology for transference of drug test results, pre-access files, random files, follow-up files, for cause files, post event files, appeals, dilute tests, subverted tests, adulterated tests, and substituted tests for inspections this year at the James A. Fitzpatrick Nuclear Power Plant and R.E. Ginna Nuclear Power Plant as well as Nine Mile Point Nuclear Station:
Fitness For Duty Program (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 26 Requirements list requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08, 02.09 a - e)
- Tier III: 6 Requirements list requirements (02.10, 02.11, 02.12, 02.14 a - c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
===procedure elements:
Security Plan Changes===
- (1) Since the last NRC inspection of this program area, Security Plan Revision 14 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan.
However, this review does not constitute formal NRC approval of the changes.
Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) July 1, 2021 through June 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 10, 2022, the inspectors presented the security baseline inspection results to Pete Orphanos, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
NANTEL Generic Fitness for Duty and Behavior Observation
Training
6/1/2021
Procedures
Access Authorization Program
Revision 17
SY-AA-103-500-
F-04
Critical Group Inclusion/Removal Form
Revision 02
Utilizing the Personnel Access Data System (PADS)
Revision 17
Review Criteria for Determining Trustworthiness and
Reliability
Revision 09
Access Authorization In-Processing/ Out-Processing of
Personnel
Revision 26
Site Authorization for Unescorted Access
Revision 21
Access Authorization Process Description
Revision 1
Self-Assessments
Fitness for Duty and Access Authorization Audit Report
8/26/2020
Fitness for Duty and Access Authorization Program Audit
Report
9/1/2021
21-044 VA
Interquest Northwest Audits
5/27/2021
A-PIC1-21-05
Pinnacle Investigations Audits
5/6/2021
NOV 2021-121
Confidential Services Inc
6/23/2021
XEL 2021-0040
Information Reporting Services Inc Audit
7/28/2021
Corrective Action
Documents
04444683
04454314
04460949
04474973
04482637
04483842
04484094
04484519
04484822
04484860
04485365
04487330
04489154
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
04489241
04502969
04426957
04505276
04511767
04505153
04487330
04511956
04481967
04462041
Procedures
Physical Security
Plan
Control and Classification of Safeguards Information (SGI)
and Sensitive Unclassified Non-Safeguards Information
(SUNSI)
Revision 022
Response to Contingency Events
Revision 16
Exelon Search Processes
Revision 038
SY-AA-101-112-
1004
Protected Area Search Processes
Revision 5
Processing and Escorting of Personnel and Vehicles
Revision 34
Control of Badges
Revision 010
Control of Security Access Control Devices
Revision 009
SY-NM-101-117
Processing and Escorting of Visitors at Nine Mile Point
Revision 1
Procedures
Exelon Generation Fitness for Duty Program
Revision 22
Testing for Cause
Revision 21
Treatment Plan and Follow-up Testing
Revision 8
Random Selection and Notification Process
Revision 14
Fitness for Duty Appeal Review
Revision 10
Designated Collection Facility
Revision 9
Collection of Specimens for Testing in an Exelon Facility
Revision 16
Breath Alcohol Testing
Revision 12
Urine Collection in a Temporary Collection Site
Revision 7
SY-AA-102-245-
1001
Operators Manual RBTV IV
Revision 1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Self-Assessments NOSA-NMP-20-
Security Programs Audit
2/06/2020
NOSA-NMP-20-
Fitness for Duty and Access Authorization Audit Report
08/26/2020
NOSA-NMP-21-
Security Programs Audit
2/10/2021
NOSA-NMP-21-
Fitness for Duty and Access Authorization Program Audit
Report
09/01/2021
Miscellaneous
Nine Mile Point Nuclear Station Physical Security,
Safeguards Contingency, Security Training and Qualification
Plan and Security Program for the Nine Mile Point
Independent Spent Fuel Storage Installation
Revision 14
71151
Calculations
PI Calculations July 2021 through June 2022