MONTHYEARPLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 2024-09-06
[Table view] Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21035A1842021-02-11011 February 2021 Summary of the January 26, 2021, Meeting with Susquehanna Nuclear Regarding a Future License Amendment Request Related to Adopting Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML20065F5522020-03-19019 March 2020 Summary of February 27, 2020, Meeting with Talen Energy Regarding Future License Amendment Request Related to Creating New Condition for Inoperable Manual Synchronization Circuit at Susquehanna Steam Electric Station, Units 1 and 2 ML19308A1082019-11-18018 November 2019 Summary of Meeting with Talen Energy Regarding a Future License Amendment Request Related to Revising the Dose Consequence Analysis for a Loss-Of-Coolant Accident at Susquehanna Steam Electric Station, Units 1 and 2 ML19259A2222019-10-16016 October 2019 Summary of September 16, 2019, Closed Meeting with Susquehanna Nuclear, LLC Regarding the Transition to Allow the Use of Atrium 11 Fuel for the Susquehanna Steam Electric Station, Units 1 and 2 ML19176A0502019-07-16016 July 2019 Summary of June 18, 2019, Meeting with Talen Energy Regarding Submittal of a Potential License Amendment Request Related to Changes to the Emergency Response Organization Staffing and Augmentation ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML19134A0292019-05-21021 May 2019 Summary of Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Use of Atrium 11 Fuel ML18311A2622018-11-26026 November 2018 Summary of Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Emergency Service Water Piping Replacement for Susquehanna Steam Electric Station, Units 1 and 2 ML18156A2632018-06-15015 June 2018 May 15, 2018, Summary of Closed Pre-Submittal Meeting with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request the Use of Atrium 11 Fuel for Susquehanna Steam Electric Station, Units 1 and 2 ML18141A2032018-05-22022 May 2018 2018 Susquehanna Annual Assessment Meeting Summary and Attendance List ML17250A3902017-09-14014 September 2017 Susquehanna Station, Units 1 and 2 - Summary of August 10, 2017, Pre-Submittal Teleconference with Susquehanna Nuclear, LLC to Discuss a Potential License Amendment Request Re: Technical Specifications Task Force Traveler-542 (CAC Nos. MG0059 and MG0060) ML17153A1012017-06-0202 June 2017 May 4, 2017, Summary of Annual Assessment Meeting for Susquehanna Steam Electric Station Held ML16131A1942016-05-10010 May 2016 April 27, 2016, Summary of Public Meeting on Susquehanna Steam Electric Station ML15295A2022015-10-29029 October 2015 Summary of Meeting with Susquehanna Nuclear, LLC on the TSTF-425 License Amendment Request for Susquehanna Steam Electric Station, Units 1 and 2 ML15278A4922015-10-0909 October 2015 Summary of Meeting with Susquehanna Nuclear, LLC on the Emergency Action Level Scheme Change Submittal for a License Amendment for Susquehanna Steam Electric Station, Units 1 and 2 ML15174A0262015-06-23023 June 2015 Annual Assessment Meeting Summary 2014 ML14247A6082014-09-0404 September 2014 2014 Susquehanna Regulatory Performance Meeting - Summary of Public Meeting ML14191A6992014-07-31031 July 2014 July 2, 2014 Summary of Meeting with PPL Susquehanna, LLC, Pre-Submittal Meeting Regarding Future Submittal for a License Transfer Amendment for Susquehanna Steam Electric Station, Units 1 and 2 ML14133A0592014-07-0101 July 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis.. ML14104B1302014-04-14014 April 2014 Summary of Public Meeting on April 9, 2014 ML13121A0812013-05-0101 May 2013 Summary of Public Meeting, Susquehanna Steam Electric Station ML13107B1372013-04-17017 April 2013 Annual Assessment Meeting Sign in Sheets for April 10, 2013 Public Meeting ML12297A2252012-10-23023 October 2012 Summary of Substantive Cross-Cutting Issues Progress Meeting with PPL Susquehanna, LLC, and Acknowledgement of Readiness for NRC 95002 Supplemental Follow-Up Inspection ML12093A3152012-04-0202 April 2012 Summary of March 21, 2012 Susquehanna 95002 Supplemental Inspection Public Exit and Regulatory Performance Meeting ML12093A1472012-04-0202 April 2012 Annual Assessment Meeting Summary ML1015304112010-06-0707 June 2010 Summary of Conference Call with Boiling Water Reactor Vessel and Internals Project Regarding Recent Operating Experience Associated with Replacement Steam Dryer ML0919101962009-07-16016 July 2009 Summary of Telephone Conference Call Held on June 25, 2009, Between the U.S. NRC and PPL Susquehanna, LLC, Comments on the Safety Evaluation Report with Open Items Related to the License Renewal of Susquehanna Steam Electric Station, Units ML0919402172009-07-13013 July 2009 SCWE Public Mtg Sign-in Sheets, for July 6, 2009 ML0919404402009-07-13013 July 2009 Meeting Summary, Public Meeting with PPL Susquehanna, LLC Re SCWE at Site ML0914800822009-06-0101 June 2009 Summary of Telephone Conference Call Held on May 21, 2009, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0915204952009-06-0101 June 2009 Summary of Annual Assessment Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station Units 1 and 2 for the Calendar Year 2008 ML0912502542009-05-0707 May 2009 Summary of Tele Conf Call Held on April 14th, 2009, Between the USNRC and PPL Susquehanna, LLC, Concerning Draft Requests for Additional Information Pertaining to the SSES, Units 1 and 2, License Renewal Application ML0900803792009-01-30030 January 2009 Summary of Telephone Conference Call Held on 12/18/08, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning TLAA RAI ML0833101132008-12-0303 December 2008 Meeting Summary, Telephone Conference Call Between U.S. NRC and PPL Susquehanna, LLC, Concerning the Draft Request for Additional Information Pertaining to the Susquehanna Steam Electric Station Units 1 & 2, LRA ML0832307862008-11-19019 November 2008 11/13/2008-Summary of Telephone Conference Call Between NRC and PPL, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0832209472008-11-19019 November 2008 Summary of Telephone Conference Call Held on October 10, 2008, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc., Concerning the Responses to Requests for Additional Information Pertaining to the Susquehanna Steam... ML0830305912008-11-0303 November 2008 Summary of Telephone Conference Call Held on Sept 24, 2008, Between the U.S. NRC and PPL Susquehanna, Llc., Concerning Draft Requests for Additional Information Pertaining to the SSES, Units 1 and 2, License Renewal Application ML0828901522008-10-21021 October 2008 Summary of Telephone Conference Call Held on October 8, 2008, Between the USNRC and PPL Susquehanna, Llc. Concerning Draft Requests for Additional Information Pertaining to the, License Renewal Application ML0828004392008-10-17017 October 2008 09/15/2008-Summary of Telephone Conference Call Between Us NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna Steam Electric Station, Units 1 & 2, License Renewal Application ML0828205772008-10-17017 October 2008 09/18/2008 Meeting Summary, Meeting Between the NRC and PPL Susquehanna, Llc., Concerning Requests for Additional Information Responses Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0822603532008-10-0101 October 2008 06/25/2008 Meeting Summary, Telephone Conference Call Between the NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0814200522008-05-30030 May 2008 05/19/2008 Summary of Telephone Conference Call Held Between the NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0811307322008-04-22022 April 2008 Summary of Annual Assessment Meeting with PPL Corporation and Susquehanna Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station (Susquehanna) for Calendar Year 2007 ML0734804472008-04-0404 April 2008 05/14/2007 to 05/17/2007 - Summary of Meeting with PPL Susquehanna, LLC, Environmental Site Audit Related to the Review of the License Renewal Application ML0808501552008-03-26026 March 2008 Units 1 & 2 - Summary of March 18, 2008, Meeting with PPL Susquehanna, on Submission Details for Susquehanna Units and 2, Pose-Extended Power Uprate (EPU) Power Ascension (Tac No. MD8079) ML0801405152008-02-11011 February 2008 Summary of Telephone Conference Call Held on December 28, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Un 2024-06-03
[Table view] |
Text
September 7, 2007 LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 23, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC held a telephone conference call on August 23, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Susquehanna Steam Electric Station, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/
Evelyn Gettys, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
As stated cc w/encls: See next page
ML072360232 OFFICE PM:RLRA:DLR LA:DLR BC:RLRA:DLR NAME EGettys SFigueroa LLund DATE 09/4/07 09/06/07 09/07/07
TELEPHONE CONFERENCE CALL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 23, 2007 PARTICIPANTS AFFILIATIONS Evelyn Gettys U.S. Nuclear Regulatory Commission (NRC)
Simon Sheng NRC Duane Filchner PPL Susquehanna, LLC (PPL)
Jeff Weik PPL Mike Detamore PPL Enclosure 1
DRAFT REQUESTS FOR ADDITIONAL INFORMATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION August 23, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC held a telephone conference call on August 23, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Susquehanna Steam Electric Station (SSES), Units 1 and 2, license renewal application (LRA).
D-RAI 4.2.1-1 Section 4.2.1 of the Susquehanna LRA, Neutron Fluence, provides the calculated reactor pressure vessel (RPV) beltline fluence values at 54 effective full power years (EFPY) for both units. Please confirm that this fluence calculation is consistent with that associated with the current pressure-temperature (P-T) limits, valid for 35.7 EFPY for Unit 1 and 30.2 EFPY for Unit 2. Provide the fluence values and approximate expiration dates corresponding to these EFPYs for the current P-T limits.
Discussion: The discussion between the staff and the applicant eliminated this D-RAI .
Therefore, this question is withdrawn and will not be sent as a formal RAI.
D-RAI 4.2.5-1 In the July 28, 1998, SER on BWRVIP-05, the NRC staff concluded that examination of the RPV circumferential shell welds would need to be performed if the corresponding volumetric examinations of the RPV axial shell welds revealed the presence of an age-related degradation mechanism. Confirm whether or not previous volumetric examinations of the RPV axial shell welds have shown any indication of cracking or other age-related degradation mechanisms in the welds. Please also confirm whether there are any flaw evaluations performed to date on RPV flaws as a result of previous volumetric examinations of the RPVs, and, if flaw evaluations exist, why they are not considered as TLAAs.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.7.3-1 LRA Section 4.7.3 states that, based on BWRVIP-25, BWR Core Plate Inspection and Flaw Evaluation Guidelines, the core plate hold-down bolts will have at least 81-percent preload remaining at 54 EFPY and, based on the GE extended power uprate (EPU) analyses of the core plate hold-down bolts, the preload at the end of 60 years would be adequate to prevent lateral motion of the core plate for the period of extended operation. This conclusion is not supported by any Susquehanna plant-specific evaluation. Please provide the following additional information:
Enclosure 2
(1) Demonstrate the applicability of the BWRVIP-25 loss of preload analysis to the Susquehanna units. Identify the temperature of the bolts during the normal operation and the projected bolt neutron fluence at the end of the period of extended operation for the Susquehanna units. Provide a plant-specific evaluation demonstrating that the loss of preload due to stress relaxation for the Susquehanna RPV core plate hold-down bolts is bounded by the value of 19 percent from Appendix B of BWRVIP-25.
(2) Perform a plant-specific core plate hold-down bolt analysis using the BWRVIP-25 Appendix A methodology, demonstrating that the axial and bending stresses for the mean and highest loaded hold-down bolts will not exceed the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section III allowable stresses for Pm (primary membrane) and Pm + Pb (primary membrane plus bending) as a result of a plant-specific reduction in the bolt preload at the end of the extended period of operation. State clearly the assumptions on which the plant-specific analysis was based.
(3) Provide sufficient information regarding the GE EPU analyses on the core plate hold-down bolts so that the staff can determine whether the Susquehanna hold-down bolts are adequate to prevent lateral motion of the core plate for the period of extended operation.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.7.3-2 LRA Appendix C discussed the applicants response to BWRVIP report application action items.
The majority of these BWRVIP reports are related to degradation of the structural integrity of austenitic stainless steel RPV internals due to irradiation assisted stress corrosion cracking, and the associated BWRVIP application action items require evaluation of TLAA for these RPV internals for the period of extended operation. Except for a couple of cases, the LRA plant-specific responses to these BWRVIP reports do not address TLAA. Please address the TLAA for RPV internals discussed in the Appendix C and demonstrate that the Susquehanna RPV internals are bounded by these BWRVIP reports. For the Susquehanna RPV internals which are not bounded by these BWRVIP reports, discuss any additional programs and activities to be implemented in the extended period of operation so that their TLAAs will be acceptable. Further, perform a similar evaluation for Susquehanna RPV core shrouds, referencing BWRVIP-76, Boiling Water Reactor Core Shroud Inspection and Flaw Evaluation Guidelines.
Discussion: Based on the discussion with the applicant, the staff agreed to revise this question as follows. The revised question will be sent as a formal RAI.
RAI 4.7.3-2 LRA Appendix C discussed the applicants response to BWRVIP report application action items.
The BWRVIP reports addressing the TLAA regarding irradiation assisted stress corrosion cracking (IASCC) in austenitic stainless steel RPV internals are BWRVIP-25, BWRVIP-26-A, BWR Top Guide Inspection and Flaw Evaluation Guidelines, BWRVIP-76, BWR Core Shroud Inspection and Flaw Evaluation Guidelines, and BWRVIP-47-A, BWR Lower Plenum Inspection and Flaw Evaluation Guidelines. Although managing TLAA using aging management programs or other measures is stated in Appendix C in your response to BWRVIP report application action items, IASCC in austenitic stainless steel RPV internals should be discussed in the TLAA section to build the connection between LRA Section 4.0 and Appendix C. Further, the fact that BWRVIP-47 is under the NRC staff review doesnt imply that you dont need to address it. In addition to your plant-specific evaluation using BWRVIP-76, you need to make a commitment to follow all BWRVIP-76 requirements and limitations, as adjusted by the NRC staffs safety evaluation on the BWRVIP-76 report.
Letter to PPL Susquehanna, from E. Gettys dated September 7, 2007
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 23, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes
YDiaz RGuzman BRogers EGettys
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Robert A. Saccone Bryan A. Snapp, Esq.
Vice President - Nuclear Operations Associate General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Terry L. Harpster Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSA4 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Walter E. Morrissey Pennsylvania Department of Supervising Engineer Environmental Protection Nuclear Regulatory Affairs Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Crowthers U.S. Nuclear Regulatory Commission Supervising Engineer P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs Berwick, PA 18603-0035 PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Regional Administrator, Region 1 Allentown, PA 18101-1179 U.S. Nuclear Regulatory Commission 475 Allendale Road Steven M. Cook King of Prussia, PA 19406 Manager - Quality Assurance PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSB2 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035 Luis A. Ramos Community Relations Manager, Dr. Judith Johnsrud Susquehanna National Energy Committee PPL Susquehanna, LLC Sierra Club 634 Salem Blvd., SSO 443 Orlando Avenue Berwick, PA 18603-0467 State College, PA 16803
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Ms. Julie Keys Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708