2008 Mid-Cycle Performance Review and Inspection Plan - Beaver Valley
ML082470472
Person / Time
Site: Beaver Valley
Issue date: 09/02/2008
From: Bellamy R
NRC/RGN-I/DRP/PB6
To: Sena P
FirstEnergy Nuclear Operating Co
BELLAMY RR
References
Download: ML082470472 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 2, 2008 Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4 Shippingport, PA 15077

SUBJECT:

MID CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

BEAVER VALLEY, UNITS 1 AND 2

Dear Mr. Sena:

On August 11, 2008, the NRC staff completed its performance review of the Beaver Valley Units 1 and 2 for the first half of calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2008 at Beaver Valley Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

P. Sena 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Raymond J. Powell Acting for/

Ronald R. Bellamy, Ph.D., Chief Division of Reactor Projects Projects Branch 6 Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73

Enclosure:

Beaver Valley Units 1 and 2 Inspection/ Activity Plan cc w/encl:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering L. Freeland, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency

Page 1 of 2 BV 08/29/2008 15:39:23 Inspection / Activity Plan Report 22 07/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - L.O. REQUAL.PROG.(FOCUS U1)+P/F RVW 2 1, 2 IP 7111111B Licensed Operator Requalification Program 08/04/2008 08/08/2008 Baseline Inspections 71002 - LICENSE RENEWAL 7 1, 2 IP 71002 License Renewal Inspection 07/14/2008 07/18/2008 License Renewal Inspec 12/8 EXM - U2 INITIAL OPERATOR LICENSING EXAMS 4 2 U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 11/10/2008 11/14/2008 Not Applicable 2 U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 12/08/2008 12/12/2008 Not Applicable 2 U01628 BEAVER VALLEY UNIT 2 INITIAL EXAM (FY09) 12/15/2008 12/19/2008 Not Applicable 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 7111121 - CDBI 7 1, 2 IP 7111121 Component Design Bases Inspection 09/15/2008 09/19/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/29/2008 10/03/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/06/2008 10/10/2008 Baseline Inspections TI 171 - TI 171 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 Generic Safety Inspectio TI 176 - TI 176 1 1, 2 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin 11/03/2008 11/07/2008 Generic Safety Inspectio Testing 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 7112102-7112102R ALARA - Required 02/09/2009 02/13/2009 Baseline Inspections 71122.01 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/23/2009 03/27/2009 Baseline Inspections 7111108P - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/20/2009 04/24/2009 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 Baseline Inspections 1 IP 7112102-7112102R ALARA - Required 04/27/2009 05/01/2009 Baseline Inspections 7111111B - REQUAL (FOCUS U2) W/ P/F RESULTS 3 1, 2 IP 7111111B Licensed Operator Requalification Program 07/20/2009 07/24/2009 Baseline Inspections 71122.03 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/13/2009 07/17/2009 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP 7111105T Fire Protection [Triennial] 07/20/2009 07/24/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 BV 08/29/2008 15:39:23 Inspection / Activity Plan Report 22 07/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP 7111105T Fire Protection [Triennial] 08/03/2009 08/07/2009 Baseline Inspections EP PROG - EP PROGRAM INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/31/2009 09/04/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/31/2009 09/04/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/31/2009 09/04/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/31/2009 09/04/2009 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 08/31/2009 09/04/2009 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 08/31/2009 09/04/2009 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 08/31/2009 09/04/2009 Baseline Inspections 71152B - PI&R BIENNIAL TEAM 5 1, 2 IP 71152B Identification and Resolution of Problems 08/17/2009 08/21/2009 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/31/2009 09/03/2009 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/19/2009 10/30/2009 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112102 ALARA Planning and Controls 10/26/2009 10/30/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.