Category:Inspection Report
MONTHYEARIR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 IR 05000255/20240012024-05-10010 May 2024 NRC Inspection Report No. 05000255/2024001 IR 05000255/20244012024-04-0909 April 2024 – Decommissioning Security Inspection Report 05000255/2024401 IR 05000255/20240102024-03-20020 March 2024 Plant Reference Simulator Inspection Report 05000255/2024010 IR 05000255/20230042024-02-20020 February 2024 NRC Inspection Report 05000255/2023004(DRSS) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) – Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 IR 05000255/20220022022-08-0303 August 2022 Integrated Inspection Report 05000255/2022002 IR 05000255/20220012022-05-13013 May 2022 Integrated Inspection Report 05000255/2022001 IR 05000255/20220102022-04-0101 April 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2022010 IR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) IR 05000255/20210102022-02-24024 February 2022 Triennial Fire Protection Inspection Report 05000255/2021010 IR 05000255/20210042022-02-0808 February 2022 Integrated Inspection Report 05000255/2021004 and Exercise of Enforcement Discretion IR 05000255/20214042021-11-15015 November 2021 NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000255/2021404 and 07200007/2021401 IR 05000255/20210032021-11-0303 November 2021 Integrated Inspection Report 05000255/2021003 IR 05000255/20214032021-10-21021 October 2021 Material Control and Accounting Program Inspection Report 05000255/2021403 IR 05000255/20214022021-10-0606 October 2021 Security Baseline Inspection Report 05000255/2021402 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20210022021-08-10010 August 2021 Integrated Inspection Report 05000255/2021002 ML21197A0322021-07-21021 July 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000255/20210012021-05-12012 May 2021 Integrated Inspection Report 05000255/2021001 IR 05000255/20214012021-04-14014 April 2021 Security Baseline Inspection Report 05000255/2021401 IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200042021-02-11011 February 2021 Integrated Inspection Report 05000255/2020004 IR 05000255/20204012021-01-0606 January 2021 Security Baseline Inspection Report 05000255/2020401 ML20342A1812020-12-10010 December 2020 Security Inspection Report Cover Letter 05000255/2020420 IR 05000255/20204202020-12-10010 December 2020 Security Inspection Report 05000255/2020420 IR 05000255/20204022020-11-30030 November 2020 Cyber Security Inspection Report 05000255/2020402 IR 05000255/20205012020-11-20020 November 2020 Emergency Preparedness Inspection Report 05000255/2020501 IR 05000255/20200032020-11-13013 November 2020 Integrated Inspection Report 05000255/2020003 IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) IR 05000255/20200102020-08-24024 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000255/2020010 IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 IR 05000255/20200022020-08-11011 August 2020 Integrated Inspection Report 05000255/2020002 and Exercise of Enforcement Discretion IR 05000255/20010082020-05-12012 May 2020 Final ASP Analysis - Palisades (IR 050002552001008) IR 05000255/20200012020-05-12012 May 2020 Integrated Inspection Report 05000255/2020001 IR 05000255/20200112020-04-21021 April 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000255/2020011 IR 05000254/20204012020-03-23023 March 2020 Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401 IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190042020-01-28028 January 2020 Integrated Inspection Report 05000255/2019004 and 07200007/2019001 ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 IR 05000255/20190112019-11-27027 November 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2019011 IR 05000255/20194112019-11-25025 November 2019 Security Baseline Inspection Report 05000255/2019411 and Independent Spent Fuel Storage Security Inspection Report 07200007/2019401 (Cover Letter Only) (DRS-M.Ziolkowski) IR 05000255/20190032019-11-14014 November 2019 Integrated Inspection Report 05000255/2019003 IR 05000255/20190102019-10-29029 October 2019 Reissue - Palisades Nuclear Plant - Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 ML19294A2872019-10-21021 October 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 2024-09-06
[Table view] Category:Letter
MONTHYEARML24312A2262024-11-0606 November 2024 Letter from C. Nelson, Michigan SHPO Regarding Palisades Nuclear Plant Architectural Survey ML24292A1572024-11-0505 November 2024 Ape Notification to Burt Lake Band Palisades ML24310A0142024-11-0505 November 2024 Ape Notification to Mackinac Bands of Chippewa Palisades ML24310A0132024-11-0505 November 2024 Ape Notification to Grand River Bands of Ottawa Indians Palisades ML24309A2032024-11-0404 November 2024 Ape Notification to Ottawa Tribe of Oklahoma Palisades ML24309A1972024-11-0404 November 2024 Ape Notification to Little Traverse Bay Bands of Odawa Indians Palisades ML24309A1982024-11-0404 November 2024 Ape Notification to Match E Be Nash She Wish Band of Pottawatomi Indians Palisades ML24309A1872024-11-0404 November 2024 Ape Notification to Grand Portage Band of Lake Superior Chippewa Palisades ML24309A2072024-11-0404 November 2024 Ape Notification to Quechan Tribe of the Fort Yuma Indian Reservation Palisades ML24309A1832024-11-0404 November 2024 Ape Notification to Bois Forte Band of the Minnesota Chippewa Tribe Palisades ML24309A2122024-11-0404 November 2024 Ape Notification to Sault Ste. Marie Tribe of Chippewa Indians Palisades ML24309A2042024-11-0404 November 2024 Ape Notification to Pokagon Band of Potawatomi Indians Palisades ML24292A0492024-11-0404 November 2024 Ape Notification to Bad River Band of the Lake Superior Tribe of Chippewa Indians Palisades ML24309A1932024-11-0404 November 2024 Ape Notification to Leech Lake Band of Ojibwe Palisades ML24309A2012024-11-0404 November 2024 Ape Notification to Mille Lacs Band of Ojibwe Palisades ML24309A1922024-11-0404 November 2024 Ape Notification to Lac Vieux Desert Band of Lk Superior Chippewa Indians Palisades ML24309A1892024-11-0404 November 2024 Ape Notification to Hannahville Indian Community Palisades ML24309A2002024-11-0404 November 2024 Ape Notification to Miami Tribe of Oklahoma Palisades ML24309A1952024-11-0404 November 2024 Ape Notification to Little River Band of Ottawa Indians Palisades ML24309A2112024-11-0404 November 2024 Ape Notification to Saint Croix Chippewa Indians of Wisconsin Palisades ML24309A1902024-11-0404 November 2024 Ape Notification to Lac Courte Oreilles Band of Lake Superior Chippewa Palisades ML24309A2022024-11-0404 November 2024 Ape Notification to Nottawaseppi Huron Band of the Potawatomi Palisades ML24309A1852024-11-0404 November 2024 Ape Notification to Citizen Potawatomi Nation Palisades ML24309A2142024-11-0404 November 2024 Ape Notification to White Earth Band of Minnesota Chippewa Tribe Palisades ML24309A2092024-11-0404 November 2024 Ape Notification to Red Lake Band of Chippewa Indians Palisades ML24309A1862024-11-0404 November 2024 Ape Notification to Forest County Potawatomi Community Palisades ML24309A1822024-11-0404 November 2024 Ape Notification to Bay Mills Indian Community Palisades ML24309A2052024-11-0404 November 2024 Ape Notification to Prairie Band Potawatomi Nation Palisades ML24309A2102024-11-0404 November 2024 Ape Notification to Saginaw Chippewa Indian Tribe of Michigan Palisades ML24309A2082024-11-0404 November 2024 Ape Notification to Red Cliff Band of Lake Superior Chippewa Indians Palisades ML24309A1992024-11-0404 November 2024 Ape Notification to Menominee Indian Tribe of Wisconsin Palisades ML24292A0072024-11-0404 November 2024 Ape Notification to Achp Palisades ML24309A1882024-11-0404 November 2024 Ape Notification to Grand Traverse Band of Ottawa and Chippewa Indians Palisades ML24309A1842024-11-0404 November 2024 Ape Notification to Chippewa Cree Indians of the Rocky Boys Reservation of Montana Palisades ML24309A1912024-11-0404 November 2024 Ape Notification to Lac Du Flambeau Band of Lake Superior Chippewa Indians Palisades ML24309A2132024-11-0404 November 2024 Ape Notification to Turtle Mountain Band of Chippewa Indians Palisades ML24309A2062024-11-0404 November 2024 Ape Notification to Prairie Island Indian Community Palisades PNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations 2024-09-06
[Table view] |
Text
March 15, 2019
SUBJECT:
PALISADES NUCLEAR PLANT July 28, 2016
subject
to redaction of information pursuant to the FOIA.
Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records.
The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading
-rm/foia/foia
-request.html
. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA Nathan Sanfilippo Acting for/
Kenneth G. O'Brien, Director Division of Reactor Safety Docket No. 50
-255 License No. DPR-20 Nonpublic Enclosure:
1. DRS IR 05000255/2018416 Public Enclosure:
2. D RP IR 05000255/2018416 cc w/o encl 1: Distribution via LISTSERV c c w/encl 1 and 2: D. Asselin, State Liaison Officer, State of Michigan
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensee's performance by conducting an inspection at the Palisades Nuclear Plant in accordance with the
Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/
operating/oversight.html for more information. The NRC and self-revealed findings, violations, and additional items are summarized in the table below. There were no Licensee-identified violations.
List of Findings and Violations Security-Related Information Cornerstone Significance Cross-Cutting Aspect Report Section Not Applicable Severity Level IV NCV 05000255/2018416
-01 Open/Closed EA 18-027 Not Applicable
Security-Related Information Security-Related Information Cornerstone Significance Cross-Cutting Aspect Report Section Security Green NCV 05000255/2018416
-02 Opened/Closed EA 18-027 H.2 - Human Performance, Field Presence
Security-Related Information Additional Tracking Items Type Issue Number Title Report Section Status URI 05000255/2016404
-02 Security-Related Information
Closed Type Issue Number Title Report Section Status URI 05000255/2016003
-02 Hourly Fire Tour Discrepancies 71152 Closed 3
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently, approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light
-Water Reactor Inspection Program-Operations Phase." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71152 - Problem Identification and Resolution
Annual Follow
-Up of Selected Issues The inspectors reviewed the licensee's implementation of its Corrective Action Program and the licensee's actions related to the following issues:
- (1) CR-PLP-2016-02650, A Review of Fire Tours Reported As Completed by Security Personnel Found Discrepancies in What was Reported; and
- (2) Unresolved Item (URI) 05000255/2016003
-02, Hourly Fire Tour Discrepancies.
No inspection samples were completed
INSPECTION RESULTS
71152 - Problem Identification and Resolution
URI (Closed) Hourly Fire Tour Discrepancies 0500255 /2016003
-02 IP 71152
Description:
The inspectors documented an URI in I R 2016003 when they identified discrepancies in the licensee's fire tour log sheets. The inspectors identified numerous areas on the fire tour log sheets that were annotated as complete, yet there were no corresponding badge records for these areas.
On April 6, 2016, the NRC issued a Confirmatory Order EA 100 to the Waterford Steam Electric Station, Unit 3 (ML16096A474) associated with deliberate violations related to fire watches that occurred between July 2013 and April 2014. The Confirmatory Order discussed actions required for Waterford and all other Entergy Nuclear Fleet sites, including Palisades. Palisades was working to complete these actions at the time this issue was identified. However, the licensee's root cause evaluation identified programmatic, training, and organizational gaps with this issue that were specific to Palisades. These gaps resulted in site-specific corrective actions to prevent recurrence in addition to the actions required for the Confirmatory Order. The licensee's root cause evaluation also identified that a contributing cause of this event was that Palisades' Security management's response to operating 4 experience from Waterford in 2014 did not validate that the vulnerability from the operating experience existed at Palisades, which allowed the aforementioned performance gaps to go unrecognized.
Corrective Action Reference: CR
-PLP-2016-02650 Closure Basis: The concerns identified by the inspectors were consistent with the issues identified in Confirmatory Order EA-15-100. The order was open at the time that the issues at Palisades were identified. Therefore, the inspectors' issues of concern are being closed to Confirmatory Order EA 100.
Observation 71152 As discussed in NRC Inspection Report (IR) 05000255/2017001 and IR 05000255/2017004, the licensee completed a root cause evaluation for this issue and identified corrective actions to prevent recurrence. Additionally, the licensee determined contributing causes and associated corrective actions.
The licensee also conducted effectiveness reviews to ensure that the corrective actions for the root causes and contributing causes adequately addressed the gaps identified in the root cause evaluation. These effectiveness reviews included:
- (1) a review of changes to the fleet and station procedures associated with the conduct of fire tours to ensure that all elements of the corrective actions to prevent recurrence were included and interviews of responsible individuals to affirm their knowledge of their responsibilities within the procedures; and
- (2) conduct of fire tour observations to assess performance of fire tours. The inspectors reviewed the results of these effectiveness review and did not identify any gaps associated with the implementation of corrective actions.
EXIT MEETING AND DEBRIEFS The inspectors confirmed that proprietary information was controlled to protect from public disclosure
.
On March 15, 2019, the inspectors presented the inspection and investigation results to Mr. Charles Arnone and other members of the licensee staff.
DOCUMENTS REVIEWED
71152-Problem Identification and Resolution
- CR-PLP-2016-02650; Discrepancies Found During Review of Completed Fire Tours; 06/08/2016
- EN-OP-139; Fire Watch Program; Revision 1
- FPIP-4; Fire Protection Systems and Fire Protection Equipment; Revision 36
- LO-PLPLO-2016-00037; Effectiveness Reviews for Root Cause Evaluation, CR-PLP-2016-02650; 06/16/2016