ML17244A487: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:PP~~"I."i79'j/l'li)fà V,3%liilrtil/IZli7i1 ROCHESTER GASANDELECTRICCORPORATIOH PI~la~&la0~89EASTAVEHUE,ROCHESTER, N.Y.14649LEOND.WHITE,JR.VICEPIIKSIDENT April30,1979TCLCPHONf.
{{#Wiki_filter:PP~~"I."i79'j/l'li)fà V , 3%liilrtil/IZli7i1 ROCHESTER GAS AND ELECTRIC CORPORATIOH PI~la~&la 0~89 EAST AVEHUE, ROCHESTER, N.Y.14649 LEON D.WHITE, JR.VICE PIIKSIDENT April 30, 1979 TCLCPHONf.
APCACOOETIKI5462700Mr.BoyceH.Grier,DirectorU.S.NuclearRegulatory Commission OfficeofInspection andEnforcement RegionI631ParkAvenueKingofPrussia,Pennsylvania 19406
APCA COOE TIKI 546 2700 Mr.Boyce H.Grier, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406  


==Subject:==
==Subject:==
LER79-007/03L-O, NuclearIntermediate RangeInstrument ChanneltestomissionR.E.GinnaNuclearPowerPlant,UnitNo.1DocketNo.50-244
LER 79-007/03L-O, Nuclear Intermediate Range Instrument Channel test omission R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244  


==DearMr.Grier:==
==Dear Mr.Grier:==
Inaccordance withTechnical Specifications, Article6.9.2.b.(3)observedinadequacies intheimplementation ofadministrative orprocedural controlswhichthreatentocausereduction ofdegreeofredundancy providedinreactorprotection systemsorengineered safetyfeaturesystems,theattachedreportofReportable Occurrence 79-007,30-day,isherebysub-mitted.Twoadditional copiesofthisletterandtheattachment areenclosed.
In accordance with Technical Specifications, Article 6.9.2.b.(3)observed inadequacies in the implementation of administrative or procedural controls which threaten to cause reduction of degree of redundancy provided in reactor protection systems or engineered safety feature systems, the attached report of Reportable Occurrence 79-007, 30-day, is hereby sub-mitted.Two additional copies of this letter and the attachment are enclosed.Very truly yours, L.D.White, Jr.Attachment cc;Mr.John G.Davis (30)Mr.William G.McDonald (3)TOOEOCO@IO'(
Verytrulyyours,L.D.White,Jr.Attachment cc;Mr.JohnG.Davis(30)Mr.WilliamG.McDonald(3)TOOEOCO@IO'(
Ci'}}
Ci'}}

Revision as of 16:11, 7 July 2018

Forwards LER 79-007/03L-0
ML17244A487
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1979
From: WHITE L D
ROCHESTER GAS & ELECTRIC CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A488 List:
References
NUDOCS 7905040101
Download: ML17244A487 (2)


Text

PP~~"I."i79'j/l'li)fà V , 3%liilrtil/IZli7i1 ROCHESTER GAS AND ELECTRIC CORPORATIOH PI~la~&la 0~89 EAST AVEHUE, ROCHESTER, N.Y.14649 LEON D.WHITE, JR.VICE PIIKSIDENT April 30, 1979 TCLCPHONf.

APCA COOE TIKI 546 2700 Mr.Boyce H.Grier, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

LER 79-007/03L-O, Nuclear Intermediate Range Instrument Channel test omission R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244

Dear Mr.Grier:

In accordance with Technical Specifications, Article 6.9.2.b.(3)observed inadequacies in the implementation of administrative or procedural controls which threaten to cause reduction of degree of redundancy provided in reactor protection systems or engineered safety feature systems, the attached report of Reportable Occurrence 79-007, 30-day, is hereby sub-mitted.Two additional copies of this letter and the attachment are enclosed.Very truly yours, L.D.White, Jr.Attachment cc;Mr.John G.Davis (30)Mr.William G.McDonald (3)TOOEOCO@IO'(

Ci'