05000244/LER-1979-007-03, /03L-0 on 790402:surveillance Requirement for Nuclear Intermediate Range Channel Test within Seven Days Was Not Performed for Two Training Criticalities.Caused by Unclear Training Procedures

From kanterella
(Redirected from ML17261A114)
Jump to navigation Jump to search
/03L-0 on 790402:surveillance Requirement for Nuclear Intermediate Range Channel Test within Seven Days Was Not Performed for Two Training Criticalities.Caused by Unclear Training Procedures
ML17261A114
Person / Time
Site: Ginna 
Issue date: 04/30/1979
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A488 List:
References
LER-79-007-03L, LER-79-7-3L, NUDOCS 7905040147
Download: ML17261A114 (2)


LER-1979-007, /03L-0 on 790402:surveillance Requirement for Nuclear Intermediate Range Channel Test within Seven Days Was Not Performed for Two Training Criticalities.Caused by Unclear Training Procedures
Event date:
Report date:
2441979007R03 - NRC Website

text

NRC FCtRM 366.

(7 77)~

[OD1]

7 8

CON'T [os]

7 8

U S. NUCLEAR REGULATORY COMMISSION 79-007/03L-0 LICENSEE EVENT REPORT (CAR 1217)

Qi (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION) 6 0

0 0

0 0

0 0

Q3 4

1 1

1 1 Q4~

Qs LICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58 CONTROL. BLOCK:

1 N Y R

E G

1 Q20 0

9 LICENSEE CODE 14 15 9

QB 0

4 3

0 7

9 QQB 74 75 REPORT DATE soURcE LLJQ6 0

5 0

0 0

2 4

4 7

0 4

0 2

7 60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During o erator review of corn leted rocedures it was determined that surveillance requirement for nuclear intermediate range instrument channel test within seven days prior to criticality was not performed for 2 training criticalities.

(T.S. 4. l.a)

~O6

~O7

~OB 7

8 9

80

~OS 7

8 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODF

~IA Q>>

D Qia

~ZQ43 Z

Z Z

Z Z

Z Qi4

~ZQia

~z Qia 9

10 12 13 18 IB 20 SEQUENTIAL OCCURRENCE REPORT R EVISION I.E RiiRO EVENT YEAR REPORT NO.

CODE TYPE NO.

Q>>

<<assi

~79

~

~00 7

~w

~03

~L

~0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS

+22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER

~GQ13 ~ZQls L~JQ30 L~JQ3 0

0 0

0 N

Q33

~NQ34

~ZQ33 Z

9 9

9 Qsa 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o

Procedure for training criticalities, unlike that for criticality for normal startup, did not require performing precritlcal Technical Specification check list prior to each criticality. Procedure for training criticality has been changed to require this prior to 3

each criticality.

NAME OF PREPARER C. Peck 4

7 8

9 FACIUTY STATUS

% POWER OTHER STATUS Q s

~ZQ33

~<~

9 Qts 8

9 10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ

~l6

~Z Q33 Z

Q34 NA 7

8,9 10 44 PERSONNEL EXPOSURES NUI'ABER TYPE DESCRIPTION Q36

~3

~OO O

Qa Z

Qaa NA 7

8 9

I I 12 13 PERSONNEL INBURIES NUMBER DESCRIPTIONQ 3 ~00 0

Q4o NA 7

8 9

11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE

DESCRIPTION

3 z

Q43 NA

,7 8

9 10 PUBLICITY ISSUED DESCRIPTIONQ o

~NQ44 NA 7

8 9

10 METHOD OF DISCOVERY

~AQ31 45 46 45 DISCOVERY DESCRIPTION Q32 operator review LOCATIONOF RELEASE Q NA 80 80 80 vs osoe. oped NRC USE ONLY 80 80 68 69 80 43 716/546-2700,ext.291-205

l