IR 05000395/2018010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::April 4, 2018]]
Mr. George Lippard III Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) REPORT NUMBER 05000395/2018010
==Dear Mr. Lippard,==
On February 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Virgil C. Summer Nuclear Station, Unit 1, and discussed the potential findings with you and other members of your staff. On March 29, 2018, a re-exit meeting was conducted via teleconference to present the final inspection results to Mr. S. Zarandi and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented three findings of very low safety significance (Green) in this report. Three of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC resident inspector at the Virgil C. Summer Nuclear Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,/RA/ Marvin D. Sykes, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-395 License Nos. NPF-12
===Enclosure:===
Inspection Report 05000395/2018010 cc: Distribution via ListServ
}}
}}

Revision as of 23:35, 17 April 2018

Virgil C. Summer Nuclear Station - NRC Design Bases Assurance Inspection (Programs) Report Number 05000395/2018010
ML18094A162
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/02/2018
From: Sykes M D
NRC/RGN-II
To: Lippard G
South Carolina Electric & Gas Co
References
IR 2018010
Download: ML18094A162 (17)


Text

April 4, 2018

Mr. George Lippard III Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) REPORT NUMBER 05000395/2018010

Dear Mr. Lippard,

On February 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Virgil C. Summer Nuclear Station, Unit 1, and discussed the potential findings with you and other members of your staff. On March 29, 2018, a re-exit meeting was conducted via teleconference to present the final inspection results to Mr. S. Zarandi and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented three findings of very low safety significance (Green) in this report. Three of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC resident inspector at the Virgil C. Summer Nuclear Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA/ Marvin D. Sykes, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-395 License Nos. NPF-12

Enclosure:

Inspection Report 05000395/2018010 cc: Distribution via ListServ