ML20141A019: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000269/1985028]]
{{Adams
| number = ML20141A019
| issue date = 10/02/1985
| title = Insp Repts 50-269/85-28,50-270/85-28 & 50-287/85-28 on 850903-06.Violation Noted:Inadequate Procedure for Documentation of Vital Area Barrier Insp.Details Withheld (Ref 10CFR2.790(d) & 73.21)
| author name = Masnyk O, Mcguire D, Perny C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name =
| addressee affiliation =
| docket = 05000269, 05000270, 05000287
| license number =
| contact person =
| document report number = 50-269-85-28, 50-270-85-28, 50-287-85-28, NUDOCS 8510240392
| package number = ML20141A015
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000269/1985028]]
 
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION-
*
                                                                                                                    UNITED STATES
    [p 40                                o                                                                NUCLEAR REGULATORY COMMISSION
  [                        j)7Ij
                                                g                                                                    REGION 11
  3                                                                                                            101 MARIETTA STREET.N.W.
  *                                              E                                                              ATLANTA, GEORGI A 30323
  \...../
      Report Nos. 50-269/85-28, 50-270/85-28, and 50-287/85-28
      Licensee: Duke Power Company
                                                                    422 Church Street
                                                                      Charlotte, NC 28242
      Docket Nos. 50-269, 270, and 287                                                                                                            License Nos. DPR-38, 47, and 55
      Facility Name: Oconee Nuclear Station
      Inspection Date:                                                                              Septpaber 3-6, 1985
      Inspecto                                                                                        ,                                                                                                                                                                                          45    ff
                                                              C. D. Perny,' Physical Security Inspector                                                                                                                                                                                Date Signed
                                                                                    huwMhwL
                                                            0. M. Masnyk, Physical Lecurity Specialist
                                                                                                                                                                                                                                                                                              lo-oz-ss
                                                                                                                                                                                                                                                                                        Date Sig ed
      Approved by:                                                                                      u    _h                                                                                                                                                                      /C              /[
                                                                            D. R. McGuire, Chief, Physical Security Section                                                                                                                                                            Date Tigned
                                                                            Nuclear Materials Safety and Safeguards Branch
                                                                            Division of Radiation Safety and Safeguards
                                                                                                                        SUMMAy
      Scopo                                    This routine, unannounced inspection involved 64 inspector-hours on
      site (6 hours backshift) by two inspectors inspecting Security Plan and
      Implementing Procedures; Security Organization; Securi_ty Program Audits,
      Records and Reports; Physical Barriers- Protected Area; Physical Barriers -
      Vital Area; Security System Power Supply; Lighting; Assessment Aids; Detection
      Aids - Protected and Vital Areas; Alarm Stations and Communications.
      Results:                                                      Three violations were identified: inadequate procedure for
      documentation of vital area barrier inspection (85-28-01); failure to meet the
      alarm annunciation requirement in the Physical Security Plan (85-28-02); and
      breach of a vital area barrier (85-28-03). One unrcsolved item was identified
      in the area of physical barriers protected area (85-28-04).
                                                                                  !?ni*":My g y
                                                                                                                                                                                                                                                              ENCLOSURE CON
                                                                                                                                                                                                                                                                  " "'" " * " " * " * *
                                                                                                          SAFEGUARDS INFORMADQh. "                                                                                                                                                                        I
          . . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _ . . _ _                    . . _ . . _ _ _ _ _ . _ _ _    . . _ _ _ _ _ _ . . _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _
}}

Latest revision as of 15:53, 27 October 2020

Insp Repts 50-269/85-28,50-270/85-28 & 50-287/85-28 on 850903-06.Violation Noted:Inadequate Procedure for Documentation of Vital Area Barrier Insp.Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20141A019
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/02/1985
From: Masnyk O, Mcguire D, Perny C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20141A015 List:
References
50-269-85-28, 50-270-85-28, 50-287-85-28, NUDOCS 8510240392
Download: ML20141A019 (1)


See also: IR 05000269/1985028

Text

SAFEGUARDS INFORMATION-

UNITED STATES

[p 40 o NUCLEAR REGULATORY COMMISSION

[ j)7Ij

g REGION 11

3 101 MARIETTA STREET.N.W.

  • E ATLANTA, GEORGI A 30323

\...../

Report Nos. 50-269/85-28, 50-270/85-28, and 50-287/85-28

Licensee: Duke Power Company

422 Church Street

Charlotte, NC 28242

Docket Nos. 50-269, 270, and 287 License Nos. DPR-38, 47, and 55

Facility Name: Oconee Nuclear Station

Inspection Date: Septpaber 3-6, 1985

Inspecto , 45 ff

C. D. Perny,' Physical Security Inspector Date Signed

huwMhwL

0. M. Masnyk, Physical Lecurity Specialist

lo-oz-ss

Date Sig ed

Approved by: u _h /C /[

D. R. McGuire, Chief, Physical Security Section Date Tigned

Nuclear Materials Safety and Safeguards Branch

Division of Radiation Safety and Safeguards

SUMMAy

Scopo This routine, unannounced inspection involved 64 inspector-hours on

site (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> backshift) by two inspectors inspecting Security Plan and

Implementing Procedures; Security Organization; Securi_ty Program Audits,

Records and Reports; Physical Barriers- Protected Area; Physical Barriers -

Vital Area; Security System Power Supply; Lighting; Assessment Aids; Detection

Aids - Protected and Vital Areas; Alarm Stations and Communications.

Results: Three violations were identified: inadequate procedure for

documentation of vital area barrier inspection (85-28-01); failure to meet the

alarm annunciation requirement in the Physical Security Plan (85-28-02); and

breach of a vital area barrier (85-28-03). One unrcsolved item was identified

in the area of physical barriers protected area (85-28-04).

!?ni*":My g y

ENCLOSURE CON

" "'" " * " " * " * *

SAFEGUARDS INFORMADQh. " I

. . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _ . . _ _ . . _ . . _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ . . _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _