ML20127P271: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:__    _        _  __
0-
                  ,                                                      fJuclear Reactor Facihty I' M                                                                        Nuclear Reactor Ralia MO 65401-0249 fei+ phone (3146 341 d230 UNIVERSITY OF MISSOURI ROLLA January 28, 1993 Document Control Desk U.S. Nuclear Regulatory Commission MS 10-D-21 Washington, D.C.      20555
 
==Dear Sirs:==
 
Please find enclosed a copy of the report " Initial Loading and Testing of Low Enriched Uranium Fuel at the University of Missouri-Rolla Reactor Facility".          The report documents    the receipt, inspection, initial core loading, and core characterization of the new LEU fuel.
Sincerely, IaittA 4 avid W. Freeman Reactor Manager DWF/lp copy to:    Dr. Albert E. Bolon, UMR Reactor Director Dr. Don L. Warner, Dean, School of Mines and Metallurgy A. Burt Davis, Regional Administrator, Region III, USNRC Marvin Mendonca, Project Manager, USNRC 01001?
9302010231 920128                ***#*"'''"***"                                                Ol PDR      ADOCK 05000186                                                                          /
P PDR                                                                        .
t}}

Latest revision as of 14:27, 23 July 2020

Forwards Initial Loading & Test of Low Enriched U Fuel at Univ of Missouri-Rolla Reactor Facility. Rept Documents Receipt,Insp,Initial Core Loading & Core Characterization of New Low Enriched U Fuel
ML20127P271
Person / Time
Site: University of Missouri-Columbia
Issue date: 01/28/1993
From: Freeman D
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127P274 List:
References
NUDOCS 9302010231
Download: ML20127P271 (1)


Text

__ _ _ __

0-

, fJuclear Reactor Facihty I' M Nuclear Reactor Ralia MO 65401-0249 fei+ phone (3146 341 d230 UNIVERSITY OF MISSOURI ROLLA January 28, 1993 Document Control Desk U.S. Nuclear Regulatory Commission MS 10-D-21 Washington, D.C. 20555

Dear Sirs:

Please find enclosed a copy of the report " Initial Loading and Testing of Low Enriched Uranium Fuel at the University of Missouri-Rolla Reactor Facility". The report documents the receipt, inspection, initial core loading, and core characterization of the new LEU fuel.

Sincerely, IaittA 4 avid W. Freeman Reactor Manager DWF/lp copy to: Dr. Albert E. Bolon, UMR Reactor Director Dr. Don L. Warner, Dean, School of Mines and Metallurgy A. Burt Davis, Regional Administrator, Region III, USNRC Marvin Mendonca, Project Manager, USNRC 01001?

9302010231 920128 ***#*""***" Ol PDR ADOCK 05000186 /

P PDR .

t