Line 2: |
Line 2: |
| | number = ML15264A687 | | | number = ML15264A687 |
| | issue date = 09/21/2015 | | | issue date = 09/21/2015 |
| | title = SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR (TAC Nos. MF6057 and MF6058) | | | title = SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR |
| | author name = | | | author name = |
| | author affiliation = Susquehanna Nuclear, LLC | | | author affiliation = Susquehanna Nuclear, LLC |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML15104A5342015-04-14014 April 2015 E-mail from J. Whited to D. Filchner SSES Acceptance of LAR Request to Adopt EAL Scheme Pursuant to NEI 99-01 Rev 6 Project stage: Acceptance Review ML15230A0462015-08-17017 August 2015 Draft RAIs SSES EAL Scheme Change LAR in Accordance with NEI 99-01 Rev 6 Project stage: Draft RAI ML15229A4052015-08-17017 August 2015 E-mail from J. Whited to J. Jennings Draft RAIs Regarding SSES Request to Adopt EAL Scheme Change in Accordance with NEI 99-01 Rev 6 Project stage: Draft RAI ML15230A0802015-08-26026 August 2015 Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, EAL Scheme Change Project stage: RAI ML15264A6872015-09-21021 September 2015 SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR Project stage: Meeting ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting Project stage: Meeting ML15278A4922015-10-0909 October 2015 Summary of Meeting with Susquehanna Nuclear, LLC on the Emergency Action Level Scheme Change Submittal for a License Amendment for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Meeting ML15296A0602015-10-16016 October 2015 Enclosure 3, Revised (Clean) Copy of the SSES EAL Basis Document Which Includes the Changes Made in Enclosure 2 Project stage: Other ML15296A0592015-10-16016 October 2015 Enclosure 1, Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt Nuclear Energy Institute 99-0 1, Revision 6 and Enclosure 2, Mark-up of the Changes Made to the SSES EAL Basis.. Project stage: Response to RAI PLA-7393, Submittal of Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, Emergency Action Level Scheme Change2015-10-16016 October 2015 Submittal of Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt NEI 99-01, Revision 6, Emergency Action Level Scheme Change Project stage: Response to RAI PLA-7425, Supplemental Information to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62016-01-0808 January 2016 Supplemental Information to License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 Project stage: Supplement 2015-08-17
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21025A1752021-01-26026 January 2021 License Amendment Request to Adopt TSTF-505 - Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Pre-Application Meeting, January 26, 2021 (Slides) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19298A9552019-10-29029 October 2019 License Amendment Request for a Revision to the Dose Consequence Analysis for a Loss of Coolant Accident - Pre-Application Meeting, October 29, 2019 ML19165A0062019-06-18018 June 2019 (SSES) License Amendment Request for Proposed Changes to Emergency Response Organization Staffing Augmentation. Pre-Submittal Call Meeting June 18, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19099A0162019-04-0909 April 2019 Pre-application Meeting for Framatome Fuel - Slide ML18305B0582018-11-0505 November 2018 Emergency Service Water Piping Replacement LAR - NRC Pre-Application Meeting ML18129A4242018-05-10010 May 2018 Advanced Framatome Methods LAR - NRC Pre-Application Meeting ML15264A6872015-09-21021 September 2015 SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR ML14182A3222014-06-10010 June 2014 Presentation in Support of PPL Meeting with NRC Staff License Transfer Pre-Application Meeting to Be Held July 2, 2014 ML14100A3712014-04-0909 April 2014 Susq 2014 Aam Slides ML13107B1962013-04-10010 April 2013 Slide Presentation for Susquehanna 2012 EOC Annual Assessment Meeting, on April 10, 2013 ML12296A6702012-10-16016 October 2012 SCCI Public Meeting - Slides, 10-16-12 ML12089A4302012-03-21021 March 2012 Aam 95002 Slide Presentation ML12089A1342012-03-21021 March 2012 Annual Assessment Meeting NRC Slide Presentation ML1014500762010-05-25025 May 2010 Susq NRC Slides for Aam, April 27, 2010 ML1014503572010-05-25025 May 2010 PPL Slides for Susquehanna Annual Assessment Meeting, April 27, 2010 ML0919402082009-07-13013 July 2009 PPL Slides for Susquehanna SCWE Public Mtg July 6, 2009 ML0919401892009-07-0606 July 2009 Meeting Slides, NRC Susquehanna Safety Conscious Work Environment (SCWE Public Meeting ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0900903402009-01-26026 January 2009 Transmittal of Summary of Telephone Conference Call Held on January 5, 2009, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc. Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Applicat ML0828807292008-05-31031 May 2008 Draft Comprehensive Plan for the Water Resources of the Susquehanna River Basin ML0915201302008-05-19019 May 2008 Annual Assessment Meeting Slides for 5/19/09, 2008 Reactor Oversight Process ML0808103392008-03-18018 March 2008 Meeting on March 18, 2008 (NON-Proprietary Version) Presentation (Tac No. MD8099) ML0725600652007-08-10010 August 2007 Susquehanna Meeting Presentation, ATWS and Stability Implementation ML0719802842007-07-19019 July 2007 Meeting Slides for Category 1 Working-Level Meeting with PPL to Discuss Steam Dryer Analysis, Licensing, Design Approach, and Power Asension Test Plans ML0717104272007-06-13013 June 2007 Summary of June 13, 2007, Category 1 Working -Level Meeting with PPL to Discuss the Licensee'S Proposed License Amendment Request Regarding Electrical Distribution Systems Dated March 2, 2007 ADAMS Accession No. ML070720545 ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0715101782007-05-30030 May 2007 Attachment 2 to PLA-6211, Steam Dryer Replacement, NRC Meeting ML0714401562007-04-24024 April 2007 EOC Meeting Slides (NRC) on NRC Annual Performance Assessment of Susquehanna Steam Electric Station - 2006 Reactor Oversight Program ML0714401792007-04-24024 April 2007 EOC 2006 Meeting Slides (PPL) ML0703804702006-11-15015 November 2006 License Renewal Scoping Meeting Handouts: Public Input by Sue Fracke ML0609602842006-04-0606 April 2006 Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005 ML0602602402006-01-19019 January 2006 Enclosure 2 - Meeting Handouts from 1/19/06 Meeting with PPL Susquehanna, LLC to Discuss an Impending Exemption Request to CoC 72-1004 ML0536201842005-11-21021 November 2005 NRC-PPL Extended Power Uprate Pre-Submittal Meetings. Start-Up Testing/Large Transient Testing Process Topics ML0514403502005-04-0606 April 2005 NRC Annual Assessment Meeting, PPL Susquehanna LLC Team (PPL Slides) ML0513704462005-04-0606 April 2005 Annual Assessment Meeting Notice, Slides ML0315307242003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F4 - Hubert J. Miller - Region I Breakout ML0314906962003-04-16016 April 2003 April 16, 2003 - RIC 2003 Presentation - W8 - Bryce L. Shriver - Safety Management - Promoting Safety Culture to Achieve Safe Performance ML0210903772002-04-16016 April 2002 NRC - Region I Susquehanna Steam Electric Station Annual Assessment Meeting Slides ML18025A2921975-08-25025 August 1975 Letter Attaching the Outline of the BWR Mark II Containment Supporting Program ML17037B8491975-08-23023 August 1975 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21025A1752021-01-26026 January 2021 License Amendment Request to Adopt TSTF-505 - Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Pre-Application Meeting, January 26, 2021 (Slides) ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20058B1672020-02-27027 February 2020 Talen Energy Presentation Slides Susquehanna Steam Electric Station Pre-Application Meeting of February 27, 2020 License Amendment Request to Create an Action for an Inoperable Manual Synchronization Circuit ML19165A0062019-06-18018 June 2019 (SSES) License Amendment Request for Proposed Changes to Emergency Response Organization Staffing Augmentation. Pre-Submittal Call Meeting June 18, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML15264A6872015-09-21021 September 2015 SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR ML14247A2612014-09-0303 September 2014 NRC Slides for 95002 Presentation for Susquehanna & PPL Public Meeting ML14182A3222014-06-10010 June 2014 Presentation in Support of PPL Meeting with NRC Staff License Transfer Pre-Application Meeting to Be Held July 2, 2014 ML14100A3712014-04-0909 April 2014 Susq 2014 Aam Slides ML13107B1962013-04-10010 April 2013 Slide Presentation for Susquehanna 2012 EOC Annual Assessment Meeting, on April 10, 2013 ML12296A6702012-10-16016 October 2012 SCCI Public Meeting - Slides, 10-16-12 ML12089A4302012-03-21021 March 2012 Aam 95002 Slide Presentation ML12089A1342012-03-21021 March 2012 Annual Assessment Meeting NRC Slide Presentation ML1114407092011-05-19019 May 2011 Aam Slides, May 19, 2011, 2010 Reactor Oversight Process ML1014503572010-05-25025 May 2010 PPL Slides for Susquehanna Annual Assessment Meeting, April 27, 2010 ML1014500762010-05-25025 May 2010 Susq NRC Slides for Aam, April 27, 2010 ML0919402082009-07-13013 July 2009 PPL Slides for Susquehanna SCWE Public Mtg July 6, 2009 ML0919401892009-07-0606 July 2009 Meeting Slides, NRC Susquehanna Safety Conscious Work Environment (SCWE Public Meeting ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0828807292008-05-31031 May 2008 Draft Comprehensive Plan for the Water Resources of the Susquehanna River Basin ML0915201302008-05-19019 May 2008 Annual Assessment Meeting Slides for 5/19/09, 2008 Reactor Oversight Process ML0811206272008-04-16016 April 2008 SSES 2007 ROP Slides ML0808103392008-03-18018 March 2008 Meeting on March 18, 2008 (NON-Proprietary Version) Presentation (Tac No. MD8099) ML0719802842007-07-19019 July 2007 Meeting Slides for Category 1 Working-Level Meeting with PPL to Discuss Steam Dryer Analysis, Licensing, Design Approach, and Power Asension Test Plans ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0715101782007-05-30030 May 2007 Attachment 2 to PLA-6211, Steam Dryer Replacement, NRC Meeting ML0714401792007-04-24024 April 2007 EOC 2006 Meeting Slides (PPL) ML0714401562007-04-24024 April 2007 EOC Meeting Slides (NRC) on NRC Annual Performance Assessment of Susquehanna Steam Electric Station - 2006 Reactor Oversight Program ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts ML0631701532006-11-0606 November 2006 Meeting Slides ML0611100212006-04-12012 April 2006 NRC Annual Assessment Meeting, PPL Susquehanna Slides ML0609602842006-04-0606 April 2006 Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005 ML0534604562005-12-0808 December 2005 Update on Control Cell Friction ML0536201842005-11-21021 November 2005 NRC-PPL Extended Power Uprate Pre-Submittal Meetings. Start-Up Testing/Large Transient Testing Process Topics ML0536201932005-11-15015 November 2005 NRC Extended Power Uprate Pre-Submittal Meeting, Susquehanna, Flow Induced Vibration Evaluation & Reactor Pressure Vessel Steam Dryer Analysis ML0514403502005-04-0606 April 2005 NRC Annual Assessment Meeting, PPL Susquehanna LLC Team (PPL Slides) ML0513704462005-04-0606 April 2005 Annual Assessment Meeting Notice, Slides ML0412100952004-04-27027 April 2004 PPL Susquehanna, LLC Slides for the Annual Assessment Meeting ML0411906342004-04-27027 April 2004 NRC Region I Slides for the Susquehanna Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2003 ML0315307242003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F4 - Hubert J. Miller - Region I Breakout ML0314906962003-04-16016 April 2003 April 16, 2003 - RIC 2003 Presentation - W8 - Bryce L. Shriver - Safety Management - Promoting Safety Culture to Achieve Safe Performance ML0310400692003-03-31031 March 2003 Susquehanna Annual Assessment Meeting Slides for Region I and PPL Susquehanna, LLC ML0210903912002-04-16016 April 2002 PPL Susquehanna, LLC Annual Assessment Meeting Slides 2024-05-16
[Table view] |
Text
SUSQUEHANNA NUCLEAR, LLC REQUEST FOR PUBLIC MEETING DISCUSSION OF ADDITIONAL PROPOSED CHANGES TO THE SUSQUEHANNA STEAM ELECTRIC STATION (SSES)
EMERGENCY ACTION LEVEL (EAL) BASIS DOCUMENT SINCE SUBMITTAL OF LICENSE AMENDMENT REQUEST TO ADOPT NEI 99-01, REVISION 6, EMERGENCY ACTION LEVEL SCHEME CHANGE (TAC NOS. MF6057 AND MF6058)
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Several proposed changes are being made to the SSES EAL Basis document as a result of the following:
- Corrective actions taken in response to the NRC EP White finding, and
- Susquehanna Nuclear, LLC, Emergency Operating Procedure (EOP) upgrade project to Revision 3 of the BWROG Emergency Procedure Guidelines (EPGs) /Severe Accident Guidelines (SAGs).
These proposed changes do not require prior NRC approval and were identified after SSES submitted a license amendment to the NRC to adopt the NEI 9901, Rev. 6 EAL scheme change. (ML #15091A657) 2
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Section 3.1.1 - Added language directly from the NSIR/DPRISG01 Interim Staff Guidance EMERGENCY PLANNING FOR NUCLEAR POWER PLANTS Rev. 0 (November 2011)Section IV.H Emergency Declaration Timeliness to provide complete classification timeliness guidance. This change was made as a result of corrective actions taken by Susquehanna Nuclear, LLC in response to the NRC EP White Finding.
3
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT EAL SS6.1 - Updated the Heat Capacity Temperature Limit figure. This change was made as a result of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
4
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT EAL SU6.1 Bases - Added language currently in the NRC approved SSES EAL bases (NEI 9901, Rev. 4 version) that clarifies that the EAL is not applicable if a manual scram is initiated and no RPS setpoint is exceeded. This change was made as a result of corrective actions taken by Susquehanna Nuclear, LLC, in response to the NRC EP White Finding.
5
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Table F1 Fission Product Barrier Threshold Matrix -
Revised PC Loss # 2 for PC Integrity or Bypass that intentional Primary Containment venting can be initiated via various EPDS or EO procedures not just EPDS004. This change was made as a result of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
6
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Fuel Clad Loss on Reactor Vessel Level Bases -
Updated the SAG entry conditions. This change was made as part of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
7
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Fuel Clad Loss Judgment Bases - Added language currently in the NRC approved SSES EAL bases (NEI 9901 Rev. 4 version) that clarifies actions to take on loss of water level indication due to an electrical problem. This change was made as a result of corrective actions taken by Susquehanna Nuclear, LLC, in response to the NRC EP White Finding.
8
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Fuel Clad Potential Loss Judgment Bases - Added language currently in the NRC approved SSES EAL bases (NEI 9901 Rev. 4 version) that clarifies actions to take on loss of water level indication due to an electrical problem. This change was made as a result of corrective actions taken by Susquehanna Nuclear, LLC, in response to the NRC EP White Finding.
9
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Reactor Coolant System (RCS) Loss # 2 on RCS Leak Rate Bases - Deleted the phrase and keep them open to eliminate the possibility of not declaring the barrier lost if all SRVs are not continuously kept open during emergency reactor pressure vessel (RPV) depressurization.
10
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT RCS Potential Loss for RCS leakage Bases -
Relocated the phrase (EAL trigger) and added the sentence If it cannot be determined within 15 minutes of the EAL Trigger that the leak is isolable and not the result of a condition previously described, the EAL shall be declared. This change was made as a result of corrective actions taken in response to the NRC EP White Finding. No intent change.
11
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT RCS Loss Judgment Bases - Added language currently in the NRC approved SSES EAL bases (NEI 9901, Rev. 4 version) that clarifies actions to take on loss of water level indication due to an electrical problem. The change was made as a result of corrective actions taken by Susquehanna Nuclear, LLC, in response to the NRC EP White Finding.
12
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Potential Loss on Reactor Vessel Level Bases - Updated the SAG entry conditions. This change was made as a result of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
13
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Loss for RCS leakage Bases -
Revised Max Safe language to align the Max Norm language with respect to EAL trigger and declaration requirements. This includes deleting the following sentences:
- If subsequent actions taken to isolate the leak are successful, the threshold for this EAL is still met and must be declared. Once leakage is isolated, downgrading the emergency may be appropriate.
This change was made in response to the NRC EP White Finding. 14
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Loss for RCS leakage Bases -
Revised Max Safe language to match Max Norm language.
- Added the sentence If subsequent actions taken to isolate the leak are successful within the 15 minute classification period, this EAL should not be declared.
15
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Potential Loss on Primary Containment Conditions Bases - Revised the procedure that defines deflagration (Hydrogen and Oxygen) limits as part of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
16
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Loss on PC Conditions -
Updated the Heat Capacity Temperature Limit figure. This change was made as a result of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
17
SUSQUEHANNA NUCLEAR, LLC PUBLIC MEETING TO DISCUSS PROPOSED CHANGES TO THE SSES EMERGENCY PREPAREDNESS EAL BASIS DOCUMENT Primary Containment Loss on PC Integrity or Bypass Bases - Revised to state that intentional Primary Containment venting can be initiated via various EP damage procedures or emergency operating procedures and not just EPDS004, Primary Containment and RPV Venting. This change was made as a result of the SSES EOP upgrade project to conform to Revision 3 of the generic BWROG EPGs/SAGs.
18