Susquehanna Public Meeting to Discuss Public Meeting to Discuss Substantive Cross-Cutting Issues Nuclear Regulatory Commission - Region I Berwick, PA 1

October 16, 2012

Agenda g

  • Introduction
  • Review of Cross-Cutting Aspects, Themes, d S b t ti C

C tti I

(SCCI) and Substantive Cross-Cutting Issues (SCCI)

  • PPL Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions 2

Reactor Oversight Process g

Strategic Strategic Safety Cornerstones g

Performance Areas Safety Cornerstones g

Performance Areas Every 6 months the NRC looks back over the Baseline Inspection Results Significance Significance Performance Indicator Results Baseline Inspection Results Significance Significance Performance Indicator Results back over the previous 12 months to Significance Threshold Action Matrix g

Threshold Significance Threshold Action Matrix g

Threshold months to evaluate plant performance Regulatory Response Regulatory Response and issues an assessment letter 3

Regulatory Response Regulatory Response letter

Cross-Cutting Aspects, Themes, and Substantive Cross Cutting Issues Substantive Cross-Cutting Issues NRC Finding Cross Cutting Aspect (CCA)

NRC Finding Cross-Cutting Aspect (CCA)

CCA CCA CCA CCA Cross-Cutting Theme Does the NRC have a concern with the scope of the licensees efforts or progress in addressing Open SCCI No SCCI Yes No 4

the theme?

Substantive Cross-Cutting Issues g

P bl Id tifi ti d R l ti

  • Problem Identification and Resolution-Evaluation [P.1 (c) - Evaluation/Extent f C diti

]

of Condition]

- Theme identified during 2010 End of Cycle

- SCCI opened during the 2011 Mid Cycle

- Maintained open during the 2011 End of C

l d 2012 Mid C l

b d

PPL Cycle and 2012 Mid Cycle based upon PPL not meeting established exit criteria 5

Substantive Cross-Cutting Issues g

H P

f

[H 2( )

Documentation and Procedures]

- Theme identified during the 2011 Mid Cycle Assessment SCCI d d i

th 2011 E d f C l

- SCCI opened during the 2011 End of Cycle

- Maintained open during 2012 Mid Cycle based pon PPL not meeting established based upon PPL not meeting established exit criteria 6

Susquehanna Substantive Cross-Cutting Issue Summary Cross Cutting Issue Summary

  • SCCI in P.1 (c) (Evaluation/Extent of Condition) remains open for a third ti t

consecutive assessment

  • SCCI in H.2(c) (Documentation and Procedures) remains open for a second Procedures) remains open for a second consecutive assessment 7

Licensee Response and Remarks Timothy S. Rausch Sr Vice President & Chief Nuclear Sr. Vice President & Chief Nuclear Officer PPL Susquehanna LLC PPL Susquehanna, LLC 8

Contacting the NRC g

R t

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs 9

Select What We Do for Public Affairs

Reference Sources Reactor O ersight Process

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html dex.html Public Electronic Reading Room Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free) 10 1 800 397 4209 (Toll Free)