Susquehanna Steam Electric Station Supplemental Inspection Public Exit and Regulatory Performance Meeting f Unit for U it 2 Nuclear Regulatory Commission - Region I Berwick, PA September 3, 2014
Agenda Overview of Reactor Oversight Process Supplemental Inspection Objective and Scope Inspection Results and Observations PPL Response Action ct o Matrix at Next e t Steps Closing Remarks Questions from the Public Adjourn Meeting
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix R
Regulatory l t Response R
Action Matrix Concept Licensee Regulatory Degraded Multiple Repetitive Unacceptable
Response
p Response p Cornerstone Degraded g Cornerstone Performance All Inputs are 1 or 2 White 22 White WhitePerformance or 1 Yellow Multiple Yellow Inputs or Overall Unacceptable Green; Inputs (in Input; Cornerstone Indicators 1 Red Input; Performance; Plants Cornerstone different - Objectives Unplanned Scrams Met w/ Cornerstone Objectives not permitted to Objectives cornerstones); with Complications Moderate >1 Met w/ Significant Operate w/in this Fully Met Cornerstone Degradation in Degradation in Safety Column; Unacceptable
- Unplanned Scrams Objectives Fully Safety per 7000Performance hours > 3 Performance Margin to Safety Met Susquehanna Unit 2
- Increasing safety significance
- Increasing NRC inspection efforts
- Increasing NRC/Licensee management involvement
- Increasing regulatory actions
Safety Significant Performance Indicator
- Unplanned Scrams with Complications
- Exceed green/white threshold (more than 1)
- Two scrams with complications
- Nov 9, 2012 - Shutdown required in response to a malfunction of the feed water control system.
- Dec 16, 2012 - Operator response to an automatic scram included reactor water level control challenges outside what is expected in a normal scram.
- Performance Indicator returned to Green during the 4th quarter of 2013.
Unit 2 - 95001 Supplemental Inspection Results
- Inspection completed in September 2013
- All inspection objectives were met
- Focus of the inspection was:
- White Unplanned Scrams with Complications Performance Indicator
- SScram with ith C Complications li ti - November N b 9 9, 2012
- Scram with Complications - December 16, 2012
Safety Significant Performance Indicator
- Unplanned p Scrams p per 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br />
- Exceeded green/white threshold (more than 3)
- Four unplanned p scrams
- November 9, 2012 (Integrated Control System Malfunction)
- December 16, 2012 (Turbine Control Valve Testing)
- December 19, 2012 (Loss of Feedwater)
- September 14 14, 2013 (Le (Level el Transient d during ring Planned Shutdown)
- Performance Indicator returned to Green during the 4th quarter of 2013.
Unit 2 - 95002 Supplemental Inspection - Objectives
- Provide assurance that the root and contributing causes off risk-significant i k i ifi t performance f iissues are understood.
- Independently assess the extent of condition and extent of cause.
- Independently determine if safety culture components caused or significantly contributed to the performance issues issues.
- Provide assurance that the licensees corrective actions are sufficient to address the root and contributing causes and prevent recurrence.
Unit 2 - 95002 Supplemental Inspection - Areas Covered
- Problem Identification
- Root Cause Evaluation
- Corrective Actions
- Independently Assess Extent of Condition
- Independently Assess Extent of Cause
- Safetyy Culture Assessment Inspection requirements that were common to the successfully completed 95001 inspection were not re-re inspected
Unit 2 - 95002 Supplemental Inspection - Dates and Team
- Conducted July 14 - July 31 31, 2014
- Senior S i Resident R id t IInspector t (Lead),
(L d)
- Senior Reactor Inspector,
- 2 Resident Inspectors,
- 2 Project Engineers Engineers, and
- Safety Culture Expert
Unit 2 - 95002 Supplemental Inspection - Conduct
- Document Review
- Independent Safety Culture Review (F
(Focus Group G interviews) i t i )
- Interviews, observations, and verification
- Independent review of Root Cause E l ti Evaluations
- Related issue review; Extent of Cause and Extent of Condition
Unit 2 - 95002 Supplemental Inspection - Focus
- Degraded Cornerstone for Initiating Events
- White Unplanned Scrams Per 7000 Critical Hours Performance Indicator
- Previously inspected scrams on November 9, 2012 and December 16, 2012
- Scrams on December 19, 2012 and September p 14,, 2013
Common Cause Assessment for Degraded Cornerstone
- 2 Root Causes
- Less Than Adequate Decision-making Related to Integrated Control System Design Scope (Single Point Vulnerabilities) and Operating Experience Reviews
- Less Than Adequate Management Reinforcement and Personal Accountability for Procedure Use and Adherence in O
Operations ti andd Engineering E i i D Departments t t
Common Cause Assessment Key Corrective Actions
- Accountability with Respect Model
- Change Organizational Behavior
- R Revise i Human H P Performance f Tools T l Implementation I l t ti Guide (additional tools for Engineers and Workers)
- Modify Integrated Control System to address Single Point Vulnerabilities
- Revise Design Guide for Failure Modes and Effects Analysis - Provide specific guidance on how to Analysis disposition Single Point Vulnerabilities
Unit 2 - 95002 Supplemental Inspection - Results
- Green Non-cited Non cited Violation
- TS 5.4.1 for improperly maintaining a required procedures for operation of the Integrated Control System
- General G l Weaknesses W k
- Operator Performance
- Accountability with Respect
- Operating Experience Process
- Design Control Process
PPL Response and Remarks Robert Franssen General Manager g - Operations p
Action Matrix Follow Up Assessment Ho Nieh Director Division of Reactor
- Director, Projects USNRC Regiong I
Action Matrix Process and Next Steps
- Perform Onsite 95002 Inspection
- Complete and Objectives Met
- Conduct Public Performance Assessment Meeting g
- Completed Tonight
- Assess Colors of Current Performance Indicators and Inspection Findings
- Currently All Green
- Issue 95002 Inspection Report and Follow Follow-up up Assessment Letter
- within 45 days y
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- At WWW.NRC.GOV, you can:
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
Contacting the NRC
- Report an emergency
- (301) 816-5100 (call collect)
- Report a safety concern
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources
- Reactor Oversightg Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index
.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free)