Susquehanna Steam Electric Station Supplemental Inspection Exit and Regulatory Performance Meeting Nuclear Regulatory Commission - Region 1 Berwick , PA March 21, 2012 1

Agenda Opening Remarks Supplemental Inspection Objective and Scope Supplemental Inspection Results and observations PPL Response Action Matrix Outcome Closing Remarks Questions from the Public Adjourn Meeting 2

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 3

Action Matrix Concept Licensee Regulatory Degraded Multiple Repetitive Unacceptable Response Response Cornerstone Degraded Cornerstone Performance All Inputs are 1 or 2 White 2 White or 1 Yellow Multiple Yellow Inputs or Overall Unacceptable Green; Inputs (in Input; Cornerstone 1 Red Input; Performance; Plants Cornerstone different Objectives Met w/ Cornerstone Objectives not permitted to Objectives cornerstones); Moderate Met w/ Significant Operate w/in this Fully Met Cornerstone Degradation in Degradation in Safety Column; Unacceptable Objectives Fully Safety Performance Performance Margin to Safety Met Susquehanna Unit 1

  • Increasing safety significance
  • Increasing NRC inspection efforts
  • Increasing NRC/Licensee management involvement
  • Increasing regulatory actions 4

Safety Significant Finding (White)

  • Event: Flooding in the Unit 1 condenser bay on July 16, 2010
  • Cause: Inadequate maintenance and operations procedures
  • Risk: Elevated due to loss of the normal heat sink 5

Safety Significant Performance Indicator

  • The Unplanned Scrams performance indicator (Pl) crossed the Green-to-White threshold during the first quarter 2011 2011.
  • Specifically, Unit 1 had four unplanned scrams in a twelve month period.
  • April, May, July 2010, and January 2011 6

Supplemental Inspection Inspection Procedure 95002 Objectives:

  • To provide assurance that the root and contributing causes of risk-significant performance issues are understood.
  • To independently assess the extent of condition and extent of cause.

cause

  • To independently determine if safety culture components caused or significantly contributed to the performance issues.
  • To provide assurance that the licensees corrective actions are sufficient to address the root and contributing causes and prevent recurrence.

7

Supplemental Inspection Inspection Procedure 95002 Areas Covered:

  • Problem Identification
  • Root Cause Evaluation
  • Corrective Actions
  • Independently Assess of Extent of Condition and Extent of Cause
  • Safety Culture 8

Supplemental Inspection

  • Conducted February 13 - March 2, 2012
  • Inspectors: Senior Resident Inspector, Senior Project Engineer, 2 Resident Inspectors, Project Engineer, and Safety Culture Expert
  • Document Review
  • Focus Group interviews
  • Interviews, observations, and verification
  • Independent review of Root Cause Evaluations
  • Related issue review; Extent of Cause and Extent of Condition 9

Inspection Results

  • Unplanned Scrams White Performance Indicator Closed
1. All Four 1 F Objectives Obj ti M Mett
2. Risk Based Decision Making Implemented
3. Implemented New Corrective Action Process 10

Inspection Results

  • Condenser Bay Flood White Finding Held Open 3/4Corrective Action and Extent of Condition/Extent of Cause Objectives not met
  • Actions taken or planned to correct the issue do not provide the assurance level required to meet the inspection objectives
  • Some Corrective Actions were Delayed
  • Narrow Scope of Actions taken to address Extent of Condition and Extent of Cause 11

Follow-up Inspection

  • Focus on objectives not met:
1. Verify Extent of Condition for leaks and Extent of Cause for inadequate maintenance procedures are appropriately addressed
2. Verify adequacy and effectiveness of selected action items related to the procedure quality upgrade project 12

PPL Response and Remarks Timothy S. Rausch Sr. Vice President & Chief Nuclear Offi Officer PPL Susquehanna, LLC 13

Action Matrix Outcome William Dean - Regional Administrator USNRC Region I 14

Action Matrix Concept Licensee Regulatory Degraded Multiple Repetitive Unacceptable Response Response Cornerstone Degraded Cornerstone Performance All Inputs are 1 or 2 White 2 White or 1 Yellow Multiple Yellow Inputs or Overall Unacceptable Green; Inputs (in Input; Cornerstone 1 Red Input; Performance; Plants Cornerstone different Objectives Met w/ Cornerstone Objectives not permitted to Objectives cornerstones); Moderate Met w/ Significant Operate w/in this Fully Met Cornerstone Degradation in Degradation in Safety Column; Unacceptable Objectives Fully Safety Performance Performance Margin to Safety Met Susquehanna Unit 1

  • Increasing safety significance
  • Increasing NRC inspection efforts
  • Increasing NRC/Licensee management involvement
  • Increasing regulatory actions 15

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

16

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695 695-7403 7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs 17

Reference Sources

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index

.html

  • Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html

  • Public Document Room 800-397-4209 (Toll Free) 18