NRC-PPL Extended Power Uprate Pre-Submittal Meetings. Start-Up Testing/Large Transient Testing Process Topics
ML053620184
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/21/2005
From: Bartos J, Browning K, Geosits J, Jones G, Oddo J
Susquehanna
To:
Office of Nuclear Reactor Regulation
References
Download: ML053620184 (35)


Text

\\pI NRC-PPL Extended Power Uprate Pre-Submittal Meetings RRIONOMM Start-Up Testing/Large Transient Testing Process Topics George T. Jones John A. Bartos Kevin G. Browning John J. Geosits John M. Oddo Susquehanna Steam Electric Station November 21, 2005 A, I

 s

Purpose of the Meetings Describe PPL Susquehanna approach e

- Start-up Testing/Large Transient Testing

- Process Topics Understand staff positions/expectations7 2

Spec iic Meeting Objectives Start-Up Testing/Large Transient Teastn

- CLTR Basis

- SRP 14.2.1 Adherence

- Basis for not performing large transient test

- Describe Licensing Basis change: ability to; withstand condensate/feedwater pump trip

,&ark.

 I0 1 I Specific Meeting Objectives SPf Process Topics

- CLTR/ELTR Basis for EPU Submittal Basis for Framatome Fuel Evaluations

,j

- RS-OO1:;

  • Correlation Matrix
  • Template Safety Evaluation Mark-UpA i

.i,

wIle EPU Related NRC Submittas

--M - -

PRNMS AST ARTS/MELLLA EPU Recirc Pump Seizure*

Steam Dryer Evaluations Supplement 1 Steam Dryer Evaluations Supplement 2 License Renewal MELLLA+

06/27/2005 10/13/2005 11/2005 03/2006 03/2006 2nd Quarter 2006, I e.-

i,*WA.ti 3rd Quarter 2006 1r 09/2006 2007 5

Recirculation Pump Seizure Licensing Basis Elimination'


-- I -

M I A 

1 11

i A, IN',

-I, 7 -

,!, I V

  • Current licensing basis Ir
  • Revision of SSES licensing basis discussed with NRC. Separate submittal planned.
  • EPU submittal contingent upon approval of AST and Recirculation Pump Seizure NRC submittals.

-0r2 6

EPU NRC Submittal Outline 0

A.

License Change Request Letter S

B.

Enclosure:

PPL Susquehanna Evaluation of the Proposed Changes A :

i,!

i IP~

1.

2.

3.

4.

Description Proposed Change

Background

Technical Analysis

b.

i Is 6

l 0~I t'i:'

EPUT NR Submittal Outline (co nt.)

XI.

I t

O

'i

..' 'l
5. Regulatory Safety Analysis 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6. Environmental Consideration
7. Summary
8. References It

i '

.; 1 4,',: j.

i" -

JI,

T EPU NRC Submittal Outlne (cont.)

C. Attachments:

1. Technical Specification Mark-up
2. Technical Specifications Bases Mark-up
3. List of Regulatory Commitments
4. Supplemental Environmental Report
5. PUSAR (GE Proprietary, Framatomei Prop rietary)

, f

.e-i

l IEPU NRC Submittal Outline (cont.)

6. PUSAR (Non-proprietary) ha, :
7. Plant Modifications
8. Startup Test Plan (Including Justification for Exception to Large Transient Testing)
9. Flow Induced Vibration Extent of Condition Review
10. Steam Dryer Report i

1 EPU NRC Submittal Outine (cont.)

11. Grid Stability
12. RS-OO1 - Correlation Matrices
13. RS-OO1 - Template Safety Evaluations-Mark-ups

'At'

' Li

General Electric BWR Extended Power Uprate Licensing Topical Reports (LTR) imilar to LTR for Stretch UDrates 0

(~5% Uprates)

X Defines the overall scope of safety analyses

  • Reviewed and accepted for reference for BWR EPU submittals
  • PPL is using the LTR structure as basis for the non-fuel-dependent safety analyses

..q.

12 II

 i t

: 1

I

?

4 j

Hi,

5'1

'z

BWR Extended Power Uprate Safety Analysis Basis Licensing Documents Generic Guidelines for General Generic Evaluations of General Constant Pressure Power Uprate Office bf Nuclear Reactor Electric Boiling Water Reactor Electric Boiling Water Reactor Licensing Topical Report Regulation Extended Power Uprate Extended Power Uprate Review Standard For CLTR Extended Towe Uprates ELTR-1 ELTR-2 RS-001 r

Generic Evaluations of General Electric Boiling Water Reactor Susquehanna Steam P

Extended Power Uprate Electric Station Supplement 1, Volume I Power Uprate Safety ELTR-2:Analysis Report Supplement 1, Vol I A

Repr PUSAR Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume II ELTR-2 Supplement 1, Vol II 13

BWR Extended Power Uprate Safety Afiaysis Basis Licensing Documents Generic Guidelines for General Generic Evaluations of General Constant Pressure Power Uprate OffMte'"Of ApiWear Reactor Electric Boiling Water Reactor Electric Boiling Water Reactor licensing Topical Report

.:,.jRe~ition Extended Power Uprate Extended Power Uprate Review StandardFor CLTR Extended,#.o*.AJUpmtes ELTR-1 ELTR-2 iS-OO1 Generic Evaluations of General Electric Boiling Water Reactor Susquehanna Steam Extended Power Uprate Electric Station Supplement 1, Volume I Power Uprate Safety EAnalysis Report Supplement 1, Vol I PUSAR Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume 11 ELTR-2 Supplement 1, Vol II 4

. L BWR Extended Power Uprate Safety Analysis -

Basis Licensing Documents Generic Guidelines fof General Electric Boiling Water Reactor Extended Power Uprate ELTR-1 Constant Pressure Power Uprate Genetic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Constant Pressure POWe ~rt Licensing Topical Report CLTR Office OfNuclear ReactorS

, Regulation Review Stndard for Extended Pover Uprates RS-OO1 ELTR-2 I

Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume I

'Jr Susquehanna Steam Electric Station Power Uprate Safety Analysis Report PUSAR ELTR-2 Supplement 1, Vol I

  • - ;d!,1.

.:. ;0 In i l !

-I n;

Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume II ELTR-2 Supplement 1, Vol II

~

15 t }{

BWR Extended Power Uprate Safety Analysis Basis Licensing Documents Generic Guidelines for General Generic Evaluations of General Constant Pressure Power Uprate Office.Of Nucfear Reactor Electric Boiling Water Reactor Electric Boiling Water Reactor licensing Topical Report ReVlation Extended Power Uprate Extended Power Uprate Review Standard For Extended Power Uprates ELTR-1 ELTR-2 RS-OO1 Generic Evaluations of General Electric Boiling Water Reactor Susquehanna Steam Extended Power Uprate Supplement 1, Volume I E

St Power Uprate Safety ELTR-2 Suppleen VlAnalysis Report Supplement 1, Vol I PUSAR Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume H A

ELTR-2 Supplement 1, Vol II 16

Constant Pressure Power Uprate Licensing Topical Report

  • Overall scope of analysis with no increase in maximum steam dome pressure
  • Other EPU assumptions
  • Builds on of generic dispositions in ELTR-1 & ELTR-2
  • Format and content for Susquehann" a s Pwrpa Power Uprate Safety Analysis Report (PUSAR);6 17

_ C5;.,-,i a

nt~ ]BWR Extended Power Uprate Safety Analysis Basis Licensing Documents Generic Guidelines for General Generic Evaluations of General Constant Pressure Power Uprate Office Of Nuclear Reactor Electric Boiling Water Reactor Electric Boiling Water Reactor Licensing Topical Report sARegolation Extended Power Uprate Extended Power Uprate Review dtandrd For CLTR Extended Power Uprates ELTR-1 ELTR-2

.RS'-O(~

Generic Evaluations of General Electric Boiling Water Reactor Susquehanna Steam Extended Power Uprate Eeti tto Supplement 1, Volume I Electric Station ELT Power Uprate Safety TRAnayi Report; Supplement 1, Vol I PUSAR Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume H ELTR-2 Supplement 1, Vol II 18

, jS3 t

_Vl_

2O l BWR Extended Power Uprate Safety Analysis Basis Licensing Documents Generic Guidelines for General Generic Evaluations of General Constant Pressure Power Uprate for.

Electric Boiling Water Reactor Electric Boiling Water Reactor Licensing Topical Report Regulation Extended Power Uprate Extended Power Uprate Review Standard For CLTR Extended Power Uprates ELTR-1 ELTR-2 RS- '001 Generic Evaluations of General Electric Boiling Water Reactor Susquehanna Steam Extended Power Uprate Electric Station Supplement 1, Volume I Power Uprate Safety ELTR-2Analysis Report Supplement 1, Vol I AasiReport PUSAR c

i Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate Supplement 1, Volume H ELTR-2 Supplement 1, Vol II 19

Evaluation Control Process II

  • Matrix of tasks
  • Individual Tasks:

Safety analyses System/component impacts Programs Task Evaluations 20

Evaluation Contro Process

  • Task Evaluations controlled process Design Input Requests Task Scoping Documents Task Reports PUSAR
  • Tasks performed by external and internal organizations Similar task evaluation control process uskl for EPU-related work 21

-EvaluationControl Process

  • Task evaluations become PPL calculations
  • Audits of organizations' evaluations will be performed 22

Approachfor Fuel Dependent Analyses in the Safetv Analysis Revort F

  • Both SSES Units contain full cores of Framatome ATRIUM-lO fuel. Framatone fuel used for almost two dozen cycles of operation
GE LTRs will not be used as the basis for fuel related analyses
  • Fuel dependent safety analysis basis and applicability of the methods for EPU conditions provided for the analyses 23 or-~

roach for Fuel Dependent Anal ses In the Safety Analysis Report

Several EPU, NRC and Framatome methodology meetings Limiting events for EPU conditions determined by Framatome through evaluation of FSAR events

Approach for Fuel Dependent Analy'es j

In the Safety Analysis Reporit Safety analysis events:

  • Generator Load Rejection with Bypass Failure
  • Recirculation Flow Run-up
  • Single-Feedwater Pump Trip
  • Loss of All FW flow
  • Over Pressurization
  • Loss of Coolant Accident

. i25

i Approach for F urel I)

In the Safety At pendent Analyses Olysis Report to 0-

- M Reload analysis report for first uprate core will be available for NRC audit pior to first EPU power ascension step 26

'.4

ybrid Task Approach - ATWS Analysis IH f or ATRIUM-IJO Fuel

+ Apply GE ATWS methodology to Framatome ATRIUM-12 fuel for EPU conditions consistent with past ATWS

  • Process controlled as previously discussed A Design Input Requests and Task Reports,-

" i 1i, 4 27

4IHybrid Task Approach - ATWS An-aysis for ATRIU -J10 Fuel

  • ATRIUM-lO thermal hydraulic design and performance data provided to GE to model ATRIUM-10 fuel with GE methods
  • Nuclear composition of representative EPU core design provided to GE to model core design with GE methods
  • GE ATWS methodology used to produce SSES specific ATWS analysis for ATRIUM-10 fuel 28

j Process Topics RS-O01 Review Standards for Extended Power Uprate

1.

NRC RS-OO1 Scope and Associated Technical Review Guidance matrices

> RS-OO1/CLTR

>) CLTR based EPU submittal

> Correlation matrix of:

  • RS-OO1 and
  • Submittal

> Example RS-OO1 correlation matrix 29

MATRIX 5 SCOPE AND ASSOCIATED TECHNICAL REVIEW GUIDANCE Plant Systems nce to; k 7

1 Flood Protection EPUs that result In significant increases in fluid volumes of tanks and vessels D.

I.. I...I...- 2.

GDC-2 SPIB 3.4.1 Rev. 2 July 1981 2.5.1.1

.1 2.5.1.1

.1 10.1.2 SSES NOTE X 10.1.2 Equipment and EPUs that result in SPLI-Floor Drainage Increases in fluid System volumes or In installation of larger capacity pumps or piping systems Circulating EPUs that result in SPLB Water System increases in fluid volumes associated with the circulating water system or In Installation of larger capacity pumps or piping systems 9.3.3 GDC-2 Rev. 2 GDC-4 July 1981 10.4.5 GDC-4 Rev. 2 July 1981 2.5.1.1 2.5.1.1 8.1 8.1

.2

.2 SSES X

NOTE X 2.5.1.1 2.5.1.1 6.4.2 6.4.2

.3

.3 SSES NOTE X 2.5.1.2 2.5.1.2 7.1, 7.1, 1

S0~

10.1 I0 It.

SSES NOTE X 2.5.1.2 2.5.1.2 10.1 10.1

.1

.1 ADD SSES NOTE X Internally Generated Missiles (Outside Containment)

EPUs that result in substantially higher system pressures or changes in existing system configuration SPLIB EMCB EMEB 3.5.1.1 Rev. 2 July 1981 GDC-4 Internally EPUs that result in SPLB EMCB 3.5.1.2 GDC-4 Generated substantially higher EMEB Rev. 2 Missiles (Inside system pressures or July Containment) changes in existing 1981 system configuration

e___

Process Topics (cont.)

2.

RS-OO1 BWR Template Safety Evaluation

> Mark-ups (as required)

> Susquehanna GDC plant 31

NUCLEAR REGULATORY COMMISSION EXTENDED POWER UPRATE PRE-SUBMITTAL MEETING SUSQUEHANNA STEAM ELECTRIC STATION STARTUP TESTING / LARGE TRANSIENT TESTING 11/21/2005

PPL SUSQUEHANNA EXTENDED-POWER UPRATE Plant Overview / Uprate History & Plans PLANT OVERVIEW

-- Two-Unit Site - Berwick, Pa. (Northeast Pa.)

  • Commercial Operation:

Unit 1 - July. 1983 Unit 2-February 1985 SUSQUEHANNA STEAM ELECTRIC STATION (SSES)

POWER UPRATE HISTORY / PLANNED

  • Original Licensed Thermal Power: 3293 MWth (OLTP)

Stretch Uprate: - 4.5% Thermal Increase To 3441 MWth / 1993-1994 limeframe Feedwater Measurement Uncertainty Recapture (MUR) Uprate: - 1.6% Thermal Increase To 3489 MWth - Current Licensed Thermal Power (CLTP) / 2002 - 2003 Timeframe

  • Turbine Retrofit Project (TRP): No Thermal Power Increase -

'v 50 Mwe Increase /

2003 - 2004 Timeframe Extended Power Uprate (EPU) Project Current Plan

  • Currently At

-' 106% Of OLTP

  • Planning On Licensing Up To The Full 120% Of OLTP
  • Each Unit's Uprate To Be Implemented Over 2 Fuel Cycles a Unit 2 1-Step (ai 7% Thermal) - Spring 2007
  • Unit 1 1s Step (-i 7% Thermal) - Spring 2008
  • Unit 2 2nd Step (Generator Limited To 1300 MWe) - Spring 2009 n Unit 1 2nd Step (Generator Limited To 1300 MWe) - Spring 2010
  • Normal Anticipated Power Level For Most Of The Year: - 116 - 117 % OLTP Page 2 of 4

PPL SUSQUEHANNA EXTENDED POWER UPRATE Startup Testing / Large Transient Testing CLTR is Basis for Power Ascension and StartuD Testing at SSES CLTR Testing Requirements are Similar to NRC Approved ELTR Testing Requirements with the Exception of the Elimination of Large Transient Testing CLTR Provides for a Stepped Approach to Power Ascension CLTR Testing Accepted by NRC Staff Except for Elimination of Large Transient Testing (LTT)

CLTR SER Allows LTT Exemptions to be Considered on Plant-by-Plant Basis SSES CPPU Testing is Described in Power Uprate Safety Analysis Report (PUSAR) and License Change Request (LCR) Testing Attachment SSES LU1 Exemption Justifications Provided in Testing Attachment o

NRC Guidance for Exemptions Justifications per SRP 14.2.1 SSES CPPU License Change Reguest: PUSAR / Testing Attachment Complies with SRP 14.2.1 Guidance o

Comparison to Startup Testing o

Evaluates Attachments to SRP 14.2.1

  • Includes CPPU Post-Modification Testing o Aggregate Impact of Modifications o Integrated Operation of Multiple Structures, Systems, and Components Provides Justifications for Exemptions from Large Transient Testing o Feedwater Pump Trip o

Condensate Pump Trip o

Loss of Feedwater Heating o

MSIV Closure Events o Turbine Trip/Generator Load Rejection o

Recirculation Pump Trip o

Relief Valve Testing o

RCIC Functional Testing o

HPCI Functional Testing Describes Operator Training/Large Transient Simulations on SSES Simulator Contains Large Transient Testing Risk Assessment

  • Attaches Tabular Data o Startup Testing Comparison Tables All Original Startup Tests 4.5% Uprate (1993 to 1995)

CPPU o Post-Modification Testing Tables o Planned CPPU Power Ascension Testing Tables Page 3 of 4

PL. -SUSQUEHANNA EXTENDED POWER UPRATE Startup Testing / Large Transient Testing

  • Current Status of LTT Exemption Justification Work in Progress/Best Estimates of Conclusions o Exemptions will be Technically Justified o Current Rationale Includes:
  • Events are well documented
  • EPU profiles are comparable
  • Gains do not justify the risks
  • Advanced analytical methods are applicable to EPU conditions
  • Other Discussion Topics
  • Two-step uprate o

Full complement of tests for first step o

Full complement of tests after second step o

Full Power is defined as 95% to 100%

RFP trip or condensate pump trip may cause Unit trip under some conditions o

FW flow margin about 7% after first step increase (10% today) o Parametric studies being performed by NSSS Vendor o

MELLLA+ operation makes these transients more susceptible to Unit trip o Administrative limits on low water level may result in a pre-emptive trip

  • Steam Dryer Performance and Structural Testing o

Stepped approach to power ascension o Moisture carryover and acoustic loading criteria included in acceptance criteria

SUMMARY

  • Testing per CLTR Test Program
  • Testing Attachment will Supply Justification for LTT Exemptions
  • Testing Attachment will Demonstrate Compliance with SRP 14.2.1
  • Testing Exemptions will be Technically Justified
  • Steam Dryer testing similar to recent submittals Change in Licensing Basis for Condensate and Feedwater Pump Trips in LCR Page 4 of 4