Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005ML060960284 |
Person / Time |
---|
Site: |
Susquehanna |
---|
Issue date: |
04/06/2006 |
---|
From: |
NRC Region 1 |
---|
To: |
|
---|
References |
---|
Download: ML060960284 (24) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21025A1752021-01-26026 January 2021 License Amendment Request to Adopt TSTF-505 - Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Pre-Application Meeting, January 26, 2021 (Slides) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19298A9552019-10-29029 October 2019 License Amendment Request for a Revision to the Dose Consequence Analysis for a Loss of Coolant Accident - Pre-Application Meeting, October 29, 2019 ML19165A0062019-06-18018 June 2019 (SSES) License Amendment Request for Proposed Changes to Emergency Response Organization Staffing Augmentation. Pre-Submittal Call Meeting June 18, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML19099A0162019-04-0909 April 2019 Pre-application Meeting for Framatome Fuel - Slide ML18305B0582018-11-0505 November 2018 Emergency Service Water Piping Replacement LAR - NRC Pre-Application Meeting ML18129A4242018-05-10010 May 2018 Advanced Framatome Methods LAR - NRC Pre-Application Meeting ML15264A6872015-09-21021 September 2015 SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR ML14182A3222014-06-10010 June 2014 Presentation in Support of PPL Meeting with NRC Staff License Transfer Pre-Application Meeting to Be Held July 2, 2014 ML14100A3712014-04-0909 April 2014 Susq 2014 Aam Slides ML13107B1962013-04-10010 April 2013 Slide Presentation for Susquehanna 2012 EOC Annual Assessment Meeting, on April 10, 2013 ML12296A6702012-10-16016 October 2012 SCCI Public Meeting - Slides, 10-16-12 ML12089A4302012-03-21021 March 2012 Aam 95002 Slide Presentation ML12089A1342012-03-21021 March 2012 Annual Assessment Meeting NRC Slide Presentation ML1014500762010-05-25025 May 2010 Susq NRC Slides for Aam, April 27, 2010 ML1014503572010-05-25025 May 2010 PPL Slides for Susquehanna Annual Assessment Meeting, April 27, 2010 ML0919402082009-07-13013 July 2009 PPL Slides for Susquehanna SCWE Public Mtg July 6, 2009 ML0919401892009-07-0606 July 2009 Meeting Slides, NRC Susquehanna Safety Conscious Work Environment (SCWE Public Meeting ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0900903402009-01-26026 January 2009 Transmittal of Summary of Telephone Conference Call Held on January 5, 2009, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc. Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Applicat ML0828807292008-05-31031 May 2008 Draft Comprehensive Plan for the Water Resources of the Susquehanna River Basin ML0915201302008-05-19019 May 2008 Annual Assessment Meeting Slides for 5/19/09, 2008 Reactor Oversight Process ML0808103392008-03-18018 March 2008 Meeting on March 18, 2008 (NON-Proprietary Version) Presentation (Tac No. MD8099) ML0725600652007-08-10010 August 2007 Susquehanna Meeting Presentation, ATWS and Stability Implementation ML0719802842007-07-19019 July 2007 Meeting Slides for Category 1 Working-Level Meeting with PPL to Discuss Steam Dryer Analysis, Licensing, Design Approach, and Power Asension Test Plans ML0717104272007-06-13013 June 2007 Summary of June 13, 2007, Category 1 Working -Level Meeting with PPL to Discuss the Licensee'S Proposed License Amendment Request Regarding Electrical Distribution Systems Dated March 2, 2007 ADAMS Accession No. ML070720545 ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0715101782007-05-30030 May 2007 Attachment 2 to PLA-6211, Steam Dryer Replacement, NRC Meeting ML0714401562007-04-24024 April 2007 EOC Meeting Slides (NRC) on NRC Annual Performance Assessment of Susquehanna Steam Electric Station - 2006 Reactor Oversight Program ML0714401792007-04-24024 April 2007 EOC 2006 Meeting Slides (PPL) ML0703804702006-11-15015 November 2006 License Renewal Scoping Meeting Handouts: Public Input by Sue Fracke ML0609602842006-04-0606 April 2006 Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005 ML0602602402006-01-19019 January 2006 Enclosure 2 - Meeting Handouts from 1/19/06 Meeting with PPL Susquehanna, LLC to Discuss an Impending Exemption Request to CoC 72-1004 ML0536201842005-11-21021 November 2005 NRC-PPL Extended Power Uprate Pre-Submittal Meetings. Start-Up Testing/Large Transient Testing Process Topics ML0514403502005-04-0606 April 2005 NRC Annual Assessment Meeting, PPL Susquehanna LLC Team (PPL Slides) ML0513704462005-04-0606 April 2005 Annual Assessment Meeting Notice, Slides ML0315307242003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F4 - Hubert J. Miller - Region I Breakout ML0314906962003-04-16016 April 2003 April 16, 2003 - RIC 2003 Presentation - W8 - Bryce L. Shriver - Safety Management - Promoting Safety Culture to Achieve Safe Performance ML0210903772002-04-16016 April 2002 NRC - Region I Susquehanna Steam Electric Station Annual Assessment Meeting Slides ML18025A2921975-08-25025 August 1975 Letter Attaching the Outline of the BWR Mark II Containment Supporting Program ML17037B8491975-08-23023 August 1975 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21025A1752021-01-26026 January 2021 License Amendment Request to Adopt TSTF-505 - Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Pre-Application Meeting, January 26, 2021 (Slides) ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML20058B1672020-02-27027 February 2020 Talen Energy Presentation Slides Susquehanna Steam Electric Station Pre-Application Meeting of February 27, 2020 License Amendment Request to Create an Action for an Inoperable Manual Synchronization Circuit ML19165A0062019-06-18018 June 2019 (SSES) License Amendment Request for Proposed Changes to Emergency Response Organization Staffing Augmentation. Pre-Submittal Call Meeting June 18, 2019 ML19157A0542019-06-0606 June 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - NRC Presentation Slides ML15264A6872015-09-21021 September 2015 SSES Slide Presentation in Support of 9/23 Public Meeting EAL Scheme Change LAR ML14247A2612014-09-0303 September 2014 NRC Slides for 95002 Presentation for Susquehanna & PPL Public Meeting ML14182A3222014-06-10010 June 2014 Presentation in Support of PPL Meeting with NRC Staff License Transfer Pre-Application Meeting to Be Held July 2, 2014 ML14100A3712014-04-0909 April 2014 Susq 2014 Aam Slides ML13107B1962013-04-10010 April 2013 Slide Presentation for Susquehanna 2012 EOC Annual Assessment Meeting, on April 10, 2013 ML12296A6702012-10-16016 October 2012 SCCI Public Meeting - Slides, 10-16-12 ML12089A4302012-03-21021 March 2012 Aam 95002 Slide Presentation ML12089A1342012-03-21021 March 2012 Annual Assessment Meeting NRC Slide Presentation ML1114407092011-05-19019 May 2011 Aam Slides, May 19, 2011, 2010 Reactor Oversight Process ML1014503572010-05-25025 May 2010 PPL Slides for Susquehanna Annual Assessment Meeting, April 27, 2010 ML1014500762010-05-25025 May 2010 Susq NRC Slides for Aam, April 27, 2010 ML0919402082009-07-13013 July 2009 PPL Slides for Susquehanna SCWE Public Mtg July 6, 2009 ML0919401892009-07-0606 July 2009 Meeting Slides, NRC Susquehanna Safety Conscious Work Environment (SCWE Public Meeting ML0913906312009-06-0404 June 2009 ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides ML0828807292008-05-31031 May 2008 Draft Comprehensive Plan for the Water Resources of the Susquehanna River Basin ML0915201302008-05-19019 May 2008 Annual Assessment Meeting Slides for 5/19/09, 2008 Reactor Oversight Process ML0811206272008-04-16016 April 2008 SSES 2007 ROP Slides ML0808103392008-03-18018 March 2008 Meeting on March 18, 2008 (NON-Proprietary Version) Presentation (Tac No. MD8099) ML0719802842007-07-19019 July 2007 Meeting Slides for Category 1 Working-Level Meeting with PPL to Discuss Steam Dryer Analysis, Licensing, Design Approach, and Power Asension Test Plans ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0715101782007-05-30030 May 2007 Attachment 2 to PLA-6211, Steam Dryer Replacement, NRC Meeting ML0714401792007-04-24024 April 2007 EOC 2006 Meeting Slides (PPL) ML0714401562007-04-24024 April 2007 EOC Meeting Slides (NRC) on NRC Annual Performance Assessment of Susquehanna Steam Electric Station - 2006 Reactor Oversight Program ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts ML0631701532006-11-0606 November 2006 Meeting Slides ML0611100212006-04-12012 April 2006 NRC Annual Assessment Meeting, PPL Susquehanna Slides ML0609602842006-04-0606 April 2006 Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005 ML0534604562005-12-0808 December 2005 Update on Control Cell Friction ML0536201842005-11-21021 November 2005 NRC-PPL Extended Power Uprate Pre-Submittal Meetings. Start-Up Testing/Large Transient Testing Process Topics ML0536201932005-11-15015 November 2005 NRC Extended Power Uprate Pre-Submittal Meeting, Susquehanna, Flow Induced Vibration Evaluation & Reactor Pressure Vessel Steam Dryer Analysis ML0514403502005-04-0606 April 2005 NRC Annual Assessment Meeting, PPL Susquehanna LLC Team (PPL Slides) ML0513704462005-04-0606 April 2005 Annual Assessment Meeting Notice, Slides ML0412100952004-04-27027 April 2004 PPL Susquehanna, LLC Slides for the Annual Assessment Meeting ML0411906342004-04-27027 April 2004 NRC Region I Slides for the Susquehanna Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2003 ML0315307242003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F4 - Hubert J. Miller - Region I Breakout ML0314906962003-04-16016 April 2003 April 16, 2003 - RIC 2003 Presentation - W8 - Bryce L. Shriver - Safety Management - Promoting Safety Culture to Achieve Safe Performance ML0310400692003-03-31031 March 2003 Susquehanna Annual Assessment Meeting Slides for Region I and PPL Susquehanna, LLC ML0210903912002-04-16016 April 2002 PPL Susquehanna, LLC Annual Assessment Meeting Slides 2024-05-16
[Table view] |
Text
Susquehanna Steam Electric Station Annual Assessment Meeting Reactor Oversight Program - CY 2005 Nuclear Regulatory Commission - Region I King of Prussia, Pennsylvania April 12, 2006
Purpose of Todays Meeting z A public forum for discussion of the licensees performance z NRC will address the licensee performance identified during the assessment period z PPL will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions
NRC Representatives z James Trapp, Branch Chief
- (610) 337-5186 z Alan Blamey, Senior Resident Inspector
- (570) 542-2134 z Frederick Jaxheimer, Resident Inspector
- (570) 542-2134
Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator Brian E. Holian A. Randolph Blough Director Division of Reactor Projects Director Division of Reactor Safety David C. Lew Marsha K. Gamberoni Deputy Director Deputy Director James M. Trapp Regional Specialists Branch Chief Project Engineers Cheryl Khan Thomas Setzer Susquehanna Limerick Peach Bottom Resident Inspectors Resident Inspectors Resident Inspectors Alan Blamey Samuel Hansell Fred Bower Frederick Jaxheimer Carey Bickett Daniel Schroeder
NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRC strategic objective
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green: Baseline Inspection White: Increased NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103
National Summary z Performance Indicator Results (at end of CY 2005)
Green 1850 White 4 Yellow 0 Red 0 z Total Inspection Findings (CY 2005)
Green 849 White 10 Yellow 1 Red 0
Susquehanna Inspection Activities (Jan 1 - Dec 31, 2005) z 5267 hours0.061 days <br />1.463 hours <br />0.00871 weeks <br />0.002 months <br /> of inspection related activities z 2 resident inspectors assigned to the site z ~15 regional inspector visits
- Included two team inspections (SSDI, Fire Protection Inspection) z Unit 2 refueling outage
Susquehanna Unit 1 Assessment Results (Jan 1 - Dec 31, 2005) z Operated safely throughout the Assessment Period z Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) z Inspection Findings
- 4 findings of very low safety significance (Green)
- All 4 findings were common to both units z NRC will conduct baseline inspections during the remainder of the cycle
Susquehanna Unit 2 Assessment Results (Jan 1 - Dec 31, 2005) z Operated safely throughout the Assessment Period z Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) z Inspection Findings
- 7 findings of very low safety significance (Green)
- 4 of the 7 findings were common to both units
- 4 human performance cross-cutting issues identified at end of assessment period. However, there is no common subcategory and a substantive cross-cutting issue was not proposed.
z NRC will conduct baseline inspections during remainder of the cycle
Unit 1 - 4Q Performance Indicators z www.NRC.GOV/NRR/oversight/assess/index.html
- click on plant name on left side of page
Unit 2 - 4Q Performance Indicators z www.NRC.GOV/NRR/oversight/assess/index.html
- click on plant name on left side of page
Performance Indicator (PI) Example www.NRC.GOV/NRR/oversight/assess/index.html click on plant name on left side of page, then on PI
Unit 1 - Inspection Results z www.NRC.GOV/NRR/oversight/assess/index.html
- click on plant name on left side of page
Unit 2 - Inspection Results z www.NRC.GOV/NRR/oversight/assess/index.html
- click on plant name on left side of page
Susquehanna Annual Assessment Summary January 1 - December 31, 2005 z PPL operated Susquehanna Units 1 & 2 in a manner that protected public health and safety z Licensee response column of the Action Matrix (All cornerstone objectives were fully met) z NRC plans baseline inspections at Susquehanna for the remainder of the 2006 assessment period
Licensee Response and Remarks Contacting the NRC z Report an emergency
- (301) 816-5100 (call collect) z Report a safety concern:
- (800) 695-7403
- Allegation@nrc.gov z General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html z Public Document Room 800-397-4209 (Toll Free)