ML11326A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 364: Line 364:


SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision TOC      Table of Contents                                        18 B 2.0    SAFETY LIMITS BASES Page TS / B 2.0-1                                      1 Pages TS / B 2.0-2 and TS / B 2.0-3                    4 Page TS / B 2.0-4                                      6 Pages TS / B 2.0-5 through TS / B 2.0-8                1 B 3.0    LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1                                      1 Pages TS / B 3.0-2 through TS / B 3.0-4                0 Pages TS / B 3.0-5 through TS / B 3.0-7                1 Page TS / B 3.0-8                                      3 Pages TS / B 3.0-9 through Page TS I B 3.0-11          2 Page TS/B 3.0-11a                                      0 Page TS / B 3.0-12                                    1 Pages TS / B 3.0-13 through TS / B 3.0-,15            2 Pages TS / B 3.0-16 and TS / B 3.0-17                  0 B 3.1    REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4                          0 Page TS / B 3.1-5                                      1 Pages TS / B 3.1-6 and TS / B 3.1-7                    2 Pages B 3.1-8 through B 3.1-13                        0 Page TS / B 3.1-14                                    1 Page TS / B 3.1-15                                    0 Page TS / B 3.1-16                                    1 Pages TS / B 3.1-17 through TS / B 3.1-19              0 Pages TS / B 3.1-20 and TS / B 3.1-21                  1 Page TS / B 3.1-22                                    0 Page TS / B 3.1-23                                    1 Page TS / B 3.1-24                                    0 Pages TS / B 3.1-25 through TS / B 3.1-27              1 Page TS / B 3.1-28                                    2 Page TS / 3.1-29                                      1 Pages B 3.1-30 through B 3.1-33                        0 Pages TS / B 3.1.34 through TS / B 3.1-36              1 Pages TS / B 3.1-37 and TS / B 3.1-38                2 Pages TS / B 3.1-39 and TS / B 3.1-40                  2 Page TS / B 3.1-40a                                    0 Page TS / B 3.1-41                                    1 Page TS / B 3.1-42                                    2 Revision 104 TSIB LOES-1 SUSQUEHANNA - UNIT
Section  Title                                                Revision TOC      Table of Contents                                        18 B 2.0    SAFETY LIMITS BASES Page TS / B 2.0-1                                      1 Pages TS / B 2.0-2 and TS / B 2.0-3                    4 Page TS / B 2.0-4                                      6 Pages TS / B 2.0-5 through TS / B 2.0-8                1 B 3.0    LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1                                      1 Pages TS / B 3.0-2 through TS / B 3.0-4                0 Pages TS / B 3.0-5 through TS / B 3.0-7                1 Page TS / B 3.0-8                                      3 Pages TS / B 3.0-9 through Page TS I B 3.0-11          2 Page TS/B 3.0-11a                                      0 Page TS / B 3.0-12                                    1 Pages TS / B 3.0-13 through TS / B 3.0-,15            2 Pages TS / B 3.0-16 and TS / B 3.0-17                  0 B 3.1    REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4                          0 Page TS / B 3.1-5                                      1 Pages TS / B 3.1-6 and TS / B 3.1-7                    2 Pages B 3.1-8 through B 3.1-13                        0 Page TS / B 3.1-14                                    1 Page TS / B 3.1-15                                    0 Page TS / B 3.1-16                                    1 Pages TS / B 3.1-17 through TS / B 3.1-19              0 Pages TS / B 3.1-20 and TS / B 3.1-21                  1 Page TS / B 3.1-22                                    0 Page TS / B 3.1-23                                    1 Page TS / B 3.1-24                                    0 Pages TS / B 3.1-25 through TS / B 3.1-27              1 Page TS / B 3.1-28                                    2 Page TS / 3.1-29                                      1 Pages B 3.1-30 through B 3.1-33                        0 Pages TS / B 3.1.34 through TS / B 3.1-36              1 Pages TS / B 3.1-37 and TS / B 3.1-38                2 Pages TS / B 3.1-39 and TS / B 3.1-40                  2 Page TS / B 3.1-40a                                    0 Page TS / B 3.1-41                                    1 Page TS / B 3.1-42                                    2 Revision 104 TSIB LOES-1 SUSQUEHANNA - UNIT UNIT 2 2              TS / B LOES-1        Revision 104
                -
UNIT 2 2              TS / B LOES-1        Revision 104


SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Line 384: Line 382:


SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section  Title                                                Revision Pages TS / B 3.5-15 and TS / B.3.5-16                  2 Page TS / B 3.5-17                                    3 Page TS / B 3.5-18                                    1 Pages B 3.5-19 through B 3.5-24                        0 Pages TS / B 3.5-25 through TS / B 3.5-27              1 Page TS / B 3.5-28                                    0 Page TS / B 3.5-29                                    1 Pages TS I B 3.5-30 and TS / B 3.5-31                  0 B 3.6    CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1                                      2 Page TS / B 3.6-1a                                    3 Page TS / B 3.6-2                                      4 Page TS / B 3.6-3                                      3 Page TS / B 3.6-4                                      4 Page TS / B 3.6-5                                      3 Page TS / B 3.6-6                                      4 Pages TS / B 3.6-6a and TS I B 3.6-6b                  3 Page TS / B 3.6-6c                                    0 Page B 3.6-7                                          0 Page TS / 3.6-8                                        1 Pages B 3.6-9 through B 3.6-14                        0 Page TS / B 3.6-15                                    3 Page TS / B 3.6-15a                                    0 Page TS / B 3.6-15b                                    3 Pages TS / B 3.6-16 and TS / B 3.6-17                  2 Page TS / B 3.6-17a                                    0 Pages TS / B 3.6-18 and TS / B 3.6-19                  1 Page TS / B 3.6-20                                    2 Page TS / B 36-21                                      3 Pages TS / B 3.6-21a and TSI B 3.6-21b                0 Pages TS / B 3.6-22 and TS / B 3.6-23                  2 Pages TS / B 3.6-24 and TS / B 3.6-25                  1 Pages TS / B 3.6-26 and TS / B 3.6-27                  3 Page TS / B 3.6-28                                    7 Page TS / B 3.6-29                                    5 Page TS / B 3.6-29a                                    0 Page TS / B 3.6-30                                    2 Page TS / B 3.6-31                                    3 Pages TS / B 3.6-32 and TS / B 3.6-33                2 Revision 104 TS/B LOES-6
Section  Title                                                Revision Pages TS / B 3.5-15 and TS / B.3.5-16                  2 Page TS / B 3.5-17                                    3 Page TS / B 3.5-18                                    1 Pages B 3.5-19 through B 3.5-24                        0 Pages TS / B 3.5-25 through TS / B 3.5-27              1 Page TS / B 3.5-28                                    0 Page TS / B 3.5-29                                    1 Pages TS I B 3.5-30 and TS / B 3.5-31                  0 B 3.6    CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1                                      2 Page TS / B 3.6-1a                                    3 Page TS / B 3.6-2                                      4 Page TS / B 3.6-3                                      3 Page TS / B 3.6-4                                      4 Page TS / B 3.6-5                                      3 Page TS / B 3.6-6                                      4 Pages TS / B 3.6-6a and TS I B 3.6-6b                  3 Page TS / B 3.6-6c                                    0 Page B 3.6-7                                          0 Page TS / 3.6-8                                        1 Pages B 3.6-9 through B 3.6-14                        0 Page TS / B 3.6-15                                    3 Page TS / B 3.6-15a                                    0 Page TS / B 3.6-15b                                    3 Pages TS / B 3.6-16 and TS / B 3.6-17                  2 Page TS / B 3.6-17a                                    0 Pages TS / B 3.6-18 and TS / B 3.6-19                  1 Page TS / B 3.6-20                                    2 Page TS / B 36-21                                      3 Pages TS / B 3.6-21a and TSI B 3.6-21b                0 Pages TS / B 3.6-22 and TS / B 3.6-23                  2 Pages TS / B 3.6-24 and TS / B 3.6-25                  1 Pages TS / B 3.6-26 and TS / B 3.6-27                  3 Page TS / B 3.6-28                                    7 Page TS / B 3.6-29                                    5 Page TS / B 3.6-29a                                    0 Page TS / B 3.6-30                                    2 Page TS / B 3.6-31                                    3 Pages TS / B 3.6-32 and TS / B 3.6-33                2 Revision 104 TS/B LOES-6 UNIT 22 SUSQUEHANNA - UNIT SUSQUEHANNA                          TS / B LOES-6        Revision 104
              -
UNIT 22 SUSQUEHANNA - UNIT SUSQUEHANNA                          TS / B LOES-6        Revision 104


SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Latest revision as of 21:05, 6 February 2020

Rev. 4, Technical Specifications Based Unit 2 Manual
ML11326A158
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/10/2011
From:
Susquehanna
To: Gerlach R
Office of Nuclear Reactor Regulation
References
Download: ML11326A158 (29)


Text

Nov. 10, 2011 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-63671 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 11/10/2011 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE

  • UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 07/19/2011 ADD MANUAL TABLE OF CONTENTS DATE: 11/09/2011 CATEGORY: DOCUMENTS TYPE: TSB2 D-)r\rl\

P OL,

Nov. 10, 2011 Page 2 of 2 ID: TEXT 3.6.1.1 ADD: REV: 4 REMOVE: REV:3 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES REMOVE: REV:103 ADD: REV: 104 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 11/09/2011 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 104 11/09/2011

Title:

LIST OF EFFECTIVE SECTIONS N \

TEXT TOC 18 09/01/2010

Title:

TABLE OF CONTENTS TEXT 2.1.1 4 05/06/2009

Title:

SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 1 10/04/2007 "

Title:

SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM, (RCS) PRESSURE SL TEXT 3.0 3 /'08'/20/2009

Title:

LIMITING CONDITION FOR .OPERATION(L>CO) APPLICABILITY TEXT 3.1.1 "03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)

TEXT 3.1.2 11/18/2002

Title:

REACTIVITY- CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009

Title:

.REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 03/24/2005

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 11/09/11 Page I1 Page of of a8 Report Date: 11/09/11

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 3 10/04/2007

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 4 05/06/2009

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 3 05/06/2009

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 2 05/06/2009

Title:

POWER DISTRIBUTIONLIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 4 05/06/2009 0

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 2 01/19/2009

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/09/2007

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 1 05/06/2009

Title:

INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 7 10/27/2008

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/06/2009

Title:

INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION1W Page 2 of 8 Report Date: 11/09/11

SSES MAM~tAL

. Manual Name:

Manual

Title:

TSB2 TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 0 11/18/2002

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 08/20/2009

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 05/06/2009

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 3 12/17/2007

Title:

INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 07/20/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 07/20/2010

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 05/06/2009

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

TEXT 3.4.4 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 11/09/li Page33 Page of of 8

.8 Report Date: 11109111

SSES MANUTAL~

Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.5 3 03/10/2010

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 01/25/2011

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007

Title:

REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- HOT SHUTDOWN TEXT 3.4.9 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM

- COLD SHUTDOWN TEXT 3.4.10 3 05/06/2009

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/18/2002

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 01/16/2006

Title:

EMERGENCY CORE. COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/18/2002

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 2 07/09/2010

Title:

EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 4 11/09/2011

Title:

PRIMARY CONTAINMENT TEXT 3.6.1.2 1 05/06/2009

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date: 11/09/11 Page44 Page of of 88 Report Date: 11/09/11

SSES MANUJAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.3 11 04/14/2010

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3.6.1.4 1 05/06/2009

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 12/17/2007

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/18/2002

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/18/2002

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/18/2002

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10/04/2007

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Report Date: 11/09/11 Page~

Page 5 of of ~8 Report Date: 11/09/11

SSES MANUAL1 Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.4.2 3 03/10/2010

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 4 09/21/2006

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 4 04/05/2010

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 2 05/02/2008

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/18/2002

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 11 10/04/2007

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 01/25/2011

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 8 05/06/2009

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.7.8 0 05/06/2009

Title:

MAINE TURBINE PRESSURE REGULATION SYSTEM TEXT 3.8.2 0 11/18/2002

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN Report Date: 11/09/11 Page66 Page of of 88 Report Date: 11/09/11

SSES MANU[AL O Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.3 2 04/14/2010

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 3 01/19/2009

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 3 03/31/2006

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/18/2002

Title:

ELECTRICAL POWER SYST EMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/18/2002

Title:

REFUELING C)PERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 09/01/2010

Title:

REFUELING C)PERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/18/2002

Title:

REFUELING-( )PERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/18/2002

Title:

REFUELING C)PERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/18/2002

Title:

REFUELING C)PERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007

Title:

REFUELING C)PERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Report Date: 11/09/11 Page7 Page 7 of of 8 8 Report Date: 11/09/11

SSES MANUAL Manual Name: TSB2 Manual

Title:

TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.7 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/18/2002

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER' LEVEL TEXT 3.10.1 1 01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/18/2002

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/18/2002

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/18/2002

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 03/24/2005

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 2 04/09/2007

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 11/09/11 Page8 Page 8 of of 8 8 Report Date: 11/09/11

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision TOC Table of Contents 18 B 2.0 SAFETY LIMITS BASES Page TS / B 2.0-1 1 Pages TS / B 2.0-2 and TS / B 2.0-3 4 Page TS / B 2.0-4 6 Pages TS / B 2.0-5 through TS / B 2.0-8 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 1 Page TS / B 3.0-8 3 Pages TS / B 3.0-9 through Page TS I B 3.0-11 2 Page TS/B 3.0-11a 0 Page TS / B 3.0-12 1 Pages TS / B 3.0-13 through TS / B 3.0-,15 2 Pages TS / B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS / B 3.1-7 2 Pages B 3.1-8 through B 3.1-13 0 Page TS / B 3.1-14 1 Page TS / B 3.1-15 0 Page TS / B 3.1-16 1 Pages TS / B 3.1-17 through TS / B 3.1-19 0 Pages TS / B 3.1-20 and TS / B 3.1-21 1 Page TS / B 3.1-22 0 Page TS / B 3.1-23 1 Page TS / B 3.1-24 0 Pages TS / B 3.1-25 through TS / B 3.1-27 1 Page TS / B 3.1-28 2 Page TS / 3.1-29 1 Pages B 3.1-30 through B 3.1-33 0 Pages TS / B 3.1.34 through TS / B 3.1-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 Page TS / B 3.1-40a 0 Page TS / B 3.1-41 1 Page TS / B 3.1-42 2 Revision 104 TSIB LOES-1 SUSQUEHANNA - UNIT UNIT 2 2 TS / B LOES-1 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.1-43 1 Page TS / B 3.1-44 0 Page TS / B 3.1-45 3 Page TS / B 3.1-46 0 Page TS / B 3.1-47 1 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 Page TS / B 3.1-51 3 B 3.2 POWER DISTRIBUTION LIMITS BASES Pages TS / B 3.2-1 and TS / B 3.2-2 2 Page TS / B 3.2-3 4 Page TS / B 3.2-4 1 Page TS / B 3.2-5 3 Page TS / B 3.2-6 4 Page TS / B 3.2-7 3 Pages TS / B 3.2-8 and TS / B 3.2-9 4 Pages TS / B 3.2-10 through TS / B 3.2-12 2 Page TS / B 3.2-13 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-8 4 Pages TS / B 3.3-9 through TS / B 3.3-13 3 Page TS / B 3.3-14 4 Pages TS / B 3.3-15 and TS / B 3.3-16 2 Pages TS / B 3.3-17 through TS / B 3.3-21 3 Pages TS / B 3.3-22 through TS / B 3.3-27 2 Page TS / B 3.3-28 3 Page TS / B 3.3-29 4 Pages TS / B 3.3-30 and TS / B 3.3-31 3 Pages TS / B 3.3-32 and TS / B 3.3-33 4 Page TS / B 3.3-34 2 Page TS / B 3.3-34a 1 Pages TS / B 3.3-34b through TS / B 3.3-34d 0 Page TS / B 3.3-34e 1 Pages TS / B 3.3-34f through TS / B 3.3-34i 0 Pages TS / B 3.3-35 and TS / B 3.3-36 2 Pages IS / B 3.3-37 and TS / B 3.3-38 1 Revision 104 TS/BLOES-2 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TS / B LOES-2 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.3-39 2 Pages TS / B 3.3-40 through TS / B 3.3-43 2 Pages TS / B 3.3-44 through TS / B 3.3-54 3 Pages TS / B 3.3-54a through TS / B 3.3-54e 0 Page TS / B 3.3-55 1 Page B 3.3-56 0 Page TS / B 3.3-57 1 Page B 3.3-58 0 Page TS / B 3.3-59 1 Pages B 3.3-60 through B 3.3-63 0 Pages TS / B,3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS I B 3.3.69 5 Page TS / B 3.3-70 4 Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Pages TS / B 3.3-75a and TS / B 3.3-75 b 6 Page TS / B 3.3-75c 5 Pages B 3.3-76 and TS / B 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-81 0 Page TS / B 3.3-82 1 Page B 3.3-83 0 Pages TS / B 3.3-84 and TS / B 3.3-85 1 Page 3.3-86 0 Page TS / B 3.3-87 1 Page B 3.3-88 0 Page TS / B 3.3-89 1 Pages B 3.3-90 and B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-103 1 Page TS / B 3.3-104 3 Pages TS / B 3.3-105 and TS / B 3.3-106 1 Page TS / B 3.3-107 2 Page TS / B 3.3-108 1 Page TS / B 3.3-109 2 Pages TS / B 3.3-110 through TS / B 3.3-112 1 Page TS / B 3.3-113 2 Page TS / B 3.3-114 1 Page TS / B 3.3-115 2 Page TS I B 3.3-116 3 Pages TS / B 3.3-117 and TSI B 3.3-118 2 Revision 104 UNIT 2 TSIBLOES-3 Revision 104 SUSQUEHANNA - UNIT SUSQUEHANNA -

2 TS I B LOES-3

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.3-119 through TS / B 3.3-120 1 Pages TS / B 3.3-121 and TS / B 3.3-122 2 Page TS / B 3.3-123 1 Page TS / B 3.3-124 2 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 1 Page TS / B 3.3-126 2 Page TS / B 3.3-127 3 Page TS / B 3.3-128 2 Pages TS / B 3.3-129 through TS / B 3.3-131 1 Page TS / B 3.3-132 2 Pages TS / B 3.3-133 and TS / B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS/ B 3.3-150 and TS / B 3.3-151 1 Pages TS / B 3.3-152 through TS / B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS / B 3.3-161 1 Page TS / B 3.3-162 1 Page TS / B 3.3-163 2 Page TS / B 3.3-164 1 Pages TS / B 3.3-165 and TS I B 3.3-166 2 Pages TS / B 3.3-167 and TS / B 3.3-168 1 Pages TS / B 3.3-169 and TS / B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Page TS I B 3.3-178 2 Page TS I B 3.3-179 3 Page TS / B 3.3-179a 2 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 4 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS / B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 2 Revision 104 UNIT 2 TS/BLOES-4 SUSQUEHANNA - UNIT SUSQUEHANNA -

2 TS / B LOES-4 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.3-197 through TS / B 3.3-205 0 Page TS / B 3.3-206 1 Pages B 3.3-207 through B 3.3-209 0 Page TS / B 3.3-210 1 Page TS / B 3.3-211 2 Pages TS / B 3.3-212 and TS / B 3.3-213 1 Pages B 3.3-214 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages TS / B 3.4-1 and TS / B 3.4-2 2 Pages TS / B 3.4-3 through TS / B 3.4-5 4 Pages TS / B 3.4-6 through TS / B 3.4-9 3 Page TS / B 3.4-10 1 Pages TS / B 3.4-11 and TS / B 3.4-12 0 Page TS / B 3.4-13 1 Page TS / B 3.4-14 0 Page TS / B 3.4-15 2 Pages TS / B 3.4-16 and TS / B 3.4-17 3 Page TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-23 0 Pages TS / B 3.4-24 through TS / B 3.4-27 0 Page TS / B 3.4-28 1 Page TS / B 3.4-29 3 Page TS / B 3.4-30 1 Page TS / B 3.4-31 0 Pages TS / B 3.4-32 and TS / B 3.4-33 1 Page TS / B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page B 3.4-38 1 Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Pages TS / B 3.4-50 through TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 through TS / B 3.4-57 2 Pages TS / B 3.4-58 through TS / B 3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS / B 3.5-2 1 Pages TS / B 3.5-3 through TS / B 3.5-6 2 Pages TS / B 3.5-7 through TS / B 3.5-10 1 Pages TS / B 3.5-11 and TS / B 3.5-12 2 Pages TS / B 3.6-13 and TS / B 3.5-14 1 SUSQUEHANNA - UNIT 2 TS / B LOES-5 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages TS / B 3.5-15 and TS / B.3.5-16 2 Page TS / B 3.5-17 3 Page TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Pages TS / B 3.5-25 through TS / B 3.5-27 1 Page TS / B 3.5-28 0 Page TS / B 3.5-29 1 Pages TS I B 3.5-30 and TS / B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Page TS / B 3.6-2 4 Page TS / B 3.6-3 3 Page TS / B 3.6-4 4 Page TS / B 3.6-5 3 Page TS / B 3.6-6 4 Pages TS / B 3.6-6a and TS I B 3.6-6b 3 Page TS / B 3.6-6c 0 Page B 3.6-7 0 Page TS / 3.6-8 1 Pages B 3.6-9 through B 3.6-14 0 Page TS / B 3.6-15 3 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 3 Pages TS / B 3.6-16 and TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 1 Page TS / B 3.6-20 2 Page TS / B 36-21 3 Pages TS / B 3.6-21a and TSI B 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 Pages TS / B 3.6-24 and TS / B 3.6-25 1 Pages TS / B 3.6-26 and TS / B 3.6-27 3 Page TS / B 3.6-28 7 Page TS / B 3.6-29 5 Page TS / B 3.6-29a 0 Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 and TS / B 3.6-33 2 Revision 104 TS/B LOES-6 UNIT 22 SUSQUEHANNA - UNIT SUSQUEHANNA TS / B LOES-6 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Page TS / B 3.6-34 1 Page TS / B 3.6-35 3 Pages TS /'B 3.6-36 and TS / B 3.6-37 2 Page TS / B 3.6-38 3 Page TS / B 3.6-39 7 Page TS / B 3.6-40 1 Pages B 3.6-41 and B 3.6-42 0 Pages TS / B 3.6-43 and TS / B 3.6-44 1 Page TS / B 3.6-45 2 Pages TS / B 3.6-46 through TS / B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-55 0 Pages TS / B 3.6-56 and TS / B 3.6-57 2 Pages B 3.6-58 through B 3.6-62 0 Pages TS /B 3.6-63 and TS / B 3.6-64 1 Pages B 3.6-65 through B 3.6-68 0 Pages B 3.6-69 through B 3.6-71 1 Page TS / B 3.6-72 2 Pages TS / B 3.6-73 and TS / B 3.6-74 1 Pages B 3.6-75 and B 3.6-76 0 Page TS / B 3.6-77 1 Pages B 3.6-78 through B 3.6-82 0 Page TS / B 3.6-83 3 Page TS / B 3.6-84 2 Page TS / B 3.6-85 4 Page TS / B 3.6-86 through TS / B 3.6-87a 2 Page TS / B 3.6-88 4 Page TS / B 3.6-89 2 Page TS / B 3.6-90 3 Pages TS / B 3.6-91 through TS / B 3.6-95 1 Page TS / B 3.6-96 2 Pages TS / B 3.6-97 and TS / B 3.6-98 1 Page TS / B 3.6-99 3 Page TS / B 3.6-99a 0 Pages TS / B 3.6-100 and TSI B 3.6-101 1 Pages TS / B 3.6-102 and TS/ B 3.6-103 2 Page TS / B 3.6-104 3 Page TS / B 3.6-105 2 Page TS / B 3.6-106 3 SUSQUEHANNA - UNIT 2 TS / B LOES-7 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision B 3.7 PLANT SYSTEMS BASES Page TS / B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 1 Page TS / B 3.7-6 3 Page TS / B 3.7-6a 2 Page TS / B 3.7-6b 1 Page TS / B 3.7-6c 2 Page TS / B 3.7-7 3 Page TS / B 3.7-8 2 Pages B 3.7-9 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 2 Pages TS / B 3.7-14 through TS / B 3.7-18 3 Page TS / B 3.7-18a I Pages TS / B 3.7-18b through TS / B 3.7-18e 0 Pages TS / B 3.7-19 through TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Page TS / B 3.7-27 4 Pages TS / B 3.7-28 and TS / B 3.7-29 3 Pages TS / B 3.7-30 and TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 Pages TS / B 3.7-34 through TS / B 3.7-37 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 1 Pages B 3.8-2 and B 3.8-3 0 Page TS / B 3.8-4 1 Pages TS / B 3.8-4a and TS / B 3.8-4b 0 Pages TS / B 3.8-5 and TS / B 3.8-6 3 Page TS / B 3.8-6a 1 Pages B 3.8-7 and B 3.8-8 0 Page TS / B 3.8-9 2 Pages TS / B 3.8-10 and TS / B 3.8-11 1 Pages B 3.8-12 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22 0 Page TS / B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS / B 3.8-26 1 SUSQUEHANNA - UNIT 2 TS / B LOES-8 Revision 104

SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)

Section Title Revision Pages B 3.8-27 through B 3.8-35 0 Page TS / B 3.8-36 1 Page TS / B 3.8-37 0 Page TS / B 3.8-38 1 Pages TS / B 3.8-39 through TS / B 3.8-46 0 Page TS / B 3.8-47 1 Pages TS / B 3.8-48 through TS / B 3.8-50 0 Pages TS / B 3.8-51 through TS / B 3.8-53 1 Page TS / B 3.8-54 0 Page TS / B 3.8-55 1 Pages TS / B 3.8-56 through TS / B 3.8-59 2 Pages TS / B 3.8-60 through TS I B 3.8-64 3 Page TS / B 3.8-65 4 Page TS / B 3.8-66 5 Pages TS / B 3.8-67 and TS / B 3.8-68 4 Page TS / B 3.8-69 5 Pages TS / B 3.8-70 through TS / B 3.8-83 1 Pages TS / B 3.8-83A through TS / B 3.8-83D 0 Pages B 3.8-84 through B 3.8-85 0 Page TS / B 3.8-86 1 Page TS / B 3.8-87 2 Pages TS / B 3.8-88 through TS I B 3.8-93 1 Pages B 3.8-94 through B 3.8-99 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-2 1 Pages TS / B 3.9-2a through TS / B 3.9-5 1 Pages TS / B 3.9-6 through TS / B 3.9-8 0 Pages B 3.9-9 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2 Pages TS / B 3.10-2 through TS /B 3.10-5 1 Pages B 3.10-6 through B 3.10 0 Page TS / B 3.10-33 2 Page B 3.10-34 0 Page B 3.10-35 1 Pages B 3.10-36 and B 3.10-37 0 Page B 3.10-38 1 Page TS / B 3.10-39 2 TSB2 Text LOES.doc

  • 11/4/2011 SUSQUEHANNA - UNIT 2 TS / B LOES-9 Revision 104

PPL Rev. 4 Primary Containment B 3.6.1.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.1 Primary Containment BASES BACKGROUND The function of the primary containment is to isolate and contain fission products released from the Reactor Primary System following a Design Basis Loss of Coolant Accident confine the postulated release of radioactive material. The primary containment consists of a steel lined, reinforced concrete vessel, which surrounds the Reactor Primary System and provides an essentially leak tight barrier against an uncontrolled release of radioactive material to the environment.

The isolation devices for the penetrations in the primary containment boundary are a part of the containment leak tight barrier. To maintain this leak tight barrier:

a. All penetrations required to be closed during accident conditions are either:
1. capable of being closed by an OPERABLE automatic containment isolation system, or
2. closed by manual valves, blind flanges, or de-activated automatic valves secured in their closed positions, except as provided in LCO 3.6.1.3, "Primary Containment Isolation Valves (PCIVs)";
b. The primary containment air lock is OPERABLE, except as provided in LCO 3.6.1.2, "Primary Containment Air Lock";

and

c. All equipment hatches are closed.

Several instruments connect to the primary containment atmosphere and are considered extensions of the primary containment. The leak rate tested instrument isolation valves identified in the Leakage Rate Test Program should be used as the primary containment boundary when the instruments are isolated and/or vented. Table B 3.6.1.1-1 contains the listing of the instruments and isolation valves.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.6-1 Revision 2

PPL Rev. 4 Primary Containment B 3.6.1.1 BASES BACKGROUND The H20 2 Analyzer lines beyond the PCIVs, up to and including (continued) the components within the H 2 O2 Analyzer panels, are extensions of primary containment (i.e., closed system), and are required to be leak rate tested in accordance with the Leakage Rate Test Program. The H20 2 Analyzer closed system boundary is identified in the Leakage Rate Test Program, and consists of components, piping, tubing, fittings, and valves, which meet the design guidance of Reference 7. Within the H20 2 Analyzer panels, the boundary ends at the first normally closed valve. The closed system boundary between PASS and the H20 2 Analyzer system ends at the Seismic Category I boundary between the two systems. This boundary occurs at the process sampling solenoid operated isolation valves (SV-22361, SV-22365, SV-22366, SV-22368, and SV-22369). These solenoid operated isolation valves do not fully meet the guidance of Reference 7 for closed system boundary valves in that they are not powered from a Class 1E power source. Based upon a risk determination, operating these valves as closed system boundary valves is not risk significant.

These normally closed valves are required to be leakage rate tested in accordance with the Leakage Rate Test Program, since they form part of the closed system boundary for the H20 2 Analyzers. These valves are Aclosed system boundary valves@

and may be opened under administrative control, as delineated in Technical Requirements Manual (TRM) Bases 3.6.4. Opening of these valves to permit testing of PASS in Modes 1, 2, and 3 is permitted in accordance with TRO 3.6.4.

When the H20 2 Analyzer panels are isolated and/or vented, the panel isolation valves identified in the Leakage Rate Test Program should be used as the boundary of the extension of primary containment. Table B 3.6.1.1-2 contains a listing of the affected H20 2 Analyzer penetrations and panel isolation valves.

This Specification ensures that the performance of the primary containment, in the event of a Design Basis Accident (DBA),

meets the assumptions used in the safety analyses of References 1 and 2. SR 3.6.1.1.1 leakage rate requirements are in conformance with 10 CFR 50, Appendix J, Option B and supporting documents (Ref. 3, 4 and 5), as modified by approved exemptions.

(continued)

SUSQUEHANNA-UNIT2 TS / B 3.6-1 a Revision 3

PPL Rev. 4 Primary Containment B 3.6.1.1 BASES (continued)

APPLICABLE The safety design basis for the primary containment is that it SAFETY ANALYSES must withstand the pressures and temperatures of the limiting DBA without exceeding the design leakage rate.

The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE such that release of fission products to the environment is controlled by the rate of primary containment leakage.

Analytical methods and assumptions involving the primary containment are presented in References 1 and 2. The safety analyses assume a nonmechanistic fission product release following a DBA, which forms the basis for determination of offsite and control room doses. The fission product release is, in turn, based on an assumed leakage rate from the primary containment. OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not exceeded.

The maximum allowable leakage rate for the primary containment (L,) is 1.0% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the design basis LOCA maximum peak containment pressure (Pa) of 48.6 psig.

Primary containment satisfies Criterion 3 of the NRC Policy Statement. (Ref. 6)

LCO Primary containment OPERABILITY is maintained by limiting leakage to *1.0 La, except prior to each startup after performing a required Primary Containment Leakage Rate Testing Program leakage test. At this time, applicable leakage limits must be met. Compliance with this LCO will ensure a primary containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those leakage rates assumed in the safety analyses.

Individual leakage rates specified for the primary containment air lock are addressed in LCO 3.6.1.2.

Leakage requirements for MSIVs and Secondary containment bypass are addressed in LCO 3.6.1.3.

(continued)

SUSQUEHANNA - UNIT 2 TS / BB 3.6-2 Revision 4

PPL Rev. 4 Primary Containment B 3.6.1. 1 BASES (continued)

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, primary containment is not required to be OPERABLE in MODES 4 and 5 to prevent leakage of radioactive material from primary containment.

ACTIONS A.1 In the event primary containment is inoperable, primary containment must be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provides a period of time to correct the problem commensurate with the importance of maintaining primary containment OPERABILITY during MODES 1, 2, and 3. This time period also ensures that the probability of an accident (requiring primary containment OPERABILITY) occurring during periods where primary containment is inoperable is minimal.

8.1 and B.2 If primary containment cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.\

SURVEILLANCE SR 3.6.1.1.1 REQUIREMENTS Maintaining the primary containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Primary Containment Leakage Rate Testing Program. The primary containment concrete visual examinations may be performed during either power operation, e.g., performed concurrently with other primary containment inspection-related activities, or during a maintenance or refuel outage.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.6-3 Revision 3

PPL Rev. 4 Primary Containment B 3.6.1.1 BASES SURVEILLANCE REQUIREMENTS SR 3.6.1.1.1 (continued)

The visual examinations of the steel liner plate inside primary containment are performed during maintenance or refueling outages since this is the only time the liner plate is fully accessible.

Failure to meet air lock leakage testing (SR 3.6.1.2.1) or resilient seal primary containment purge valve leakage testing (SR 3.6.1.3.6) does not necessarily result in a failure of this SR.

The impact of the failure to meet these SRs must be evaluated against the Type A, B, and C acceptance criteria of the Primary Containment Leakage Rate Testing Program. As left leakage prior to each startup after performing a required leakage test is required to be < 0.6 La for combined Type B and C leakage, and

< 0.75 La for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of _<1.0 La. At _<1.0 La the offsite and control room dose consequences are bounded by the assumptions of the safety analysis. The Frequency is required by the Primary Containment Leakage Rate Testing Program.

SR Frequencies are as required by the Primary Containment Leakage Rate Testing Program. These periodic testing requirements verify that the primary containment leakage rate does not exceed the leakage rate assumed in the safety analysis.

As noted in Table B 3.6.1.3-1, an exemption to Appendix J is provided that isolation barriers which remain filled or a water seal remains in the line post-LOCA are tested with water and the leakage is not included in the Type B and C 0.60 La test.

SR 3.6.1.1.2 Maintaining the pressure suppression function of primary containment requires limiting the leakage from the drywell to the suppression chamber. Thus, if an event were to occur that pressurized the drywell, the steam would be directed through the downcomers into the suppression pool. This SR measures drywell to suppression chamber leakage to ensure that the leakage paths that would bypass the suppression pool are within allowable limits.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.6-4 Revision 4

PPL Rev. 4 Primary Containment B 3.6.1.1 BASES SURVEILLANCE REQUIREMENTS SR 3.6.1.1.2 (continued)

The allowable limit is 10% of the acceptable SSES A/Pk design value. For SSES, the A/Ak design value is .0535 ft 2.

Satisfactory performance of this SR can be achieved by establishing a known differential pressure between the drywell and the suppression chamber and determining the leakage. The leakage test is performed when the 10 CFR 50, Appendix J, Type A test is performed in accordance with the Primary Containment Leakage Rate Testing Program. This testing Frequency was developed considering this test is performed in conjunction with the Integrated Leak rate test and also in view of the fact that component failures that might have affected this test are identified by other primary containment SRs. Two consecutive test failures, however, would indicate unexpected primary containment degradation; in this event, as the Note indicates, increasing the Frequency to once every 24 months is required until the situation is remedied as evidenced by passing two consecutive tests.

SR 3.6.1.1.3 Maintaining the pressure suppression function of primary containment requires limiting the leakage from the drywell to the suppression chamber. Thus, if an event were to occur that pressurized the drywell, the steam would be directed through downcomers into the suppression pool. This SR measures suppression chamber-to-drywell vacuum breaker leakage to ensure the leakage paths that would bypass the suppression pool are within allowable limits. The total allowable leakage limit is 30% of the SR 3.6.1.1.2 limit. The allowable leakage per set is 12% of the SR 3.6.1.1.2 limit.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.6-5 Revision 3

PPL Rev. 4 Primary Containment B 3.6.1.1 BASES SURVEILLANCE REQUIREMENTS SR 3.6.1.1.3 (continued)

The leakage is determined by establishing a 4.3 psi differential pressure across the drywell-to-suppression chamber vacuum breakers and verifying the leakage. The leakage test is performed every 24 months. The 24 month Frequency was developed considering the surveillance must be performed during a unit outage. A Note is provided which allows this Surveillance not to be performed when SR 3.6.1.1.2 is performed. This is acceptable because SR 3.6.1.1.2 ensures the OPERABILITY of the pressure suppression function including the suppression chamber-to-drywell vacuum breakers.

REFERENCES 1. FSAR, Section 6.2.

2. FSAR, Section 15.
3. 10 CFR 50, Appendix J, Option B.
4. Nuclear Energy Institute, 94-01.
5. ANSI/ANS 56.8-1994.
6. Final Policy Statement on Technical Specifications Improvements July 22, 1993 (58 FR 39132).
7. Standard Review Plan 6.2.4, Rev. 1, September 1975.

SUSQUEHANNA - UNIT 2 TS / B 3.6-6 Revision 4

PPL Rev. 4 Primary Containment B 3.6.1.1 TABLE B 3.6.1.1-1 INSTRUMENT ISOLATION VALVES (Page 1 Of 2)

PENETRATION INSTRUMENT INSTRUMENT ISOLATION NUMBER VALVE X-3B PSH-C72-2N002A IC-PSH-2 N002A PSH L C72-2N004 IC-PSHL-2N004 PS-El1-2NO10A IC-PS-2NO10A PS-Ell-2NO11A IC-PS-2NO11A-ISO PSH-C72-2N002B IC-PSH-2N002B PS-Ell-2NO10C IC-PS-2NO10C PS-Ell-2N01 IC IC-PS-2N011C-ISO PSH-25120C IC-PSH-25120C X-32A PSH-C72-2N002D IC-PSH-2N002D PS-Ell-2N010B IC-PS-2N010B PS-E11-2N01 1B IC-PS-2N011B-ISO PSH-C72-2N002C IC-PSH-2N002C PS-Ell-2NO10D IC-PS-2N010D PS-Eli-2N011D IC-PS-2N011D-ISO PSH-25120D IC-PSH-25120D X-39A FT-25120A IC-FT-25120A HIGH and IC-FT-25120A LOW X-39B FT-25120B IC-FT-25120B HIGH and IC-FT-25120B LOW X-90A PT-25709A IC-PT-25709A PT-25710A IC-PT-25710A PT-25728A1 IC-PT-25728A1 X-90D PT-25709B IC-PT-25709B PT-25710B IC-PT-25710B PT-25728A IC-PT-25728A SUSQUEHANNA-UNIT2 TS / B 3.6-6a Revision 3

PPL Rev. 4 Primary Containment B 3.6.1.1 TABLE B 3.6.1.1-1 INSTRUMENT ISOLATION VALVES (Page 2 of 2)

PENETRATION INSTRUMENT INSTRUMENT ISOLATION, NUMBER VALVE X-204A/205A FT-25121A IC-FT-25121A HIGH and IC-FT-25121A LOW X-204B/205B FT-25121B IC-FT-25121B HIGH and IC-FT-25121B LOW X-219A LT-25775A IC-LT-25775A REF and IC-LT-25775A VAR LSH-E41-2N015A 255027 and 255031 LSH-E41-2N015B 255029 and 255033 X-223A PT-25702 IC-PT-25702 X-232A LT-25776A IC-LT-25776A REF and IC-LT-25776A VAR PT-25729A IC-PT-25729A X234A LT-25775B IC-LT-25775B REF and IC-LT-25775B VAR X-235A LT-25776B IC-LT-25776B REF and IC-LT-25776B VAR PT-25729B IC-PT-25729B LI-25776B2 IC-LI-25776B2 REF and IC-LI-25776B2 VAR SUSQUEHANNA-UNIT2 TS / 8 3.6-6b Revision 3

PPL Rev. 4 Primary Containment B 3.6.1.1 TABLE B 3.6.1.1-2 H20 2 ANALYZER PANEL ISOLATION VALVES PENETRATION NUMBER PANEL ISOLATION VALVE(a)

X-60A, X-88B, X-221A, X-238A 257138 257139 257140 257141 257142 X-80C, X-221 B, X-238B 257149 257150 257151 257152 257153 (a) Only those valves listed in this table with current leak rate test results, as identified in the Leakage Rate Test Program, may be used as isolation valves.

SUSQUEHANNA - UNIT 2 TS / B 3.6-6c Revision 0