{{#Wiki_filter:UNITE D STA TES  NUCL EA R RE GULA TORY C OMMIS SI ON    REGION I 475 AL LENDAL E ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-141 5 August 31, 2006 Mr. James H.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077
Lash Site Vice President FirstEnergy N uclear Operatin g Company Beaver Va lley P ower Stati on Post Of fice Bo x 4 Shippingport, P ennsylv ania 15077 SUB JEC T: MID-CYCLE PERFORMANCE REVIEW AND INSPECTI ON PLAN - BEAVER VALLEY POW ER STATION UNITS 1 AND 2 Dear Mr. La sh: On August 9, 2006, the NRC staff complete d its performance rev iew of Bea ver Vall ey Pow er Station Uni ts 1 and 2 (B eaver Val ley) for the first h alf of the calenda r year 2006 assessment cycle. Our technical s taff reviewed p erformance indicato rs (PIs) for the most rece nt quarter and i nspect ion re sults over the pre viou s twe lve months. The pu rpose of this letter is to inform you o f our ass essmen t of yo ur safety performa nce du ring th is pe riod a nd our plan s for futur e inspect ions at your facilit y.This performance rev iew and enclosed i nspection pl an do not i nclude phy sical protec tion information. A separat e letter designated and mar ked as "Exempt from Public Disclosure in accordance w ith 10 CFR 2.390" wi ll incl ude the phy sical protec tion revi ew and re sultant inspe ction plan. Plant performance for the most recent quarter at Beaver Va lley U nits 1 and 2 was w ithin the Licensee R esponse col umn of the NRC' s Action M atrix, based on all i nspection findi ngs being class ified as hav ing v ery l ow sa fety si gnifica nce (Gre en) an d all PIs i ndica ting pe rformance at a level re quiring no addi tional NR C oversight (Gree n). Therefore, we p lan to condu ct the standa rd reac tor ov ersight proce ss (ROP) base line insp ectio ns at y our faci lity. In ad ditio n to the ba seli ne in specti on pro cedure s, ins pecti ons re lated to the Exte nded P ower Uprate for Uni ts 1 and 2 and inspection s related to th e Unit 2 C ontainment Sump Modificati ons wil l be performed.
 
The enclosed inspection plan detai ls the insp ections, les s those relate d to physi cal protectio n, scheduled th rough March 3 1, 2008. The i nspection pl an is prov ided to al low for the re solution of any schedu ling conflicts and personnel availa bility issues w ell in a dvance of in spector arriv al onsit e. Rou tine r eside nt ins pecti ons ar e not l isted due to their ongoi ng and conti nuous nature. The inspection s in the l ast nine months of the inspecti on plan are tentative and may be revised at th e end-of-cycle revie w.In accordance w ith 10 CFR 2.390 of the NR C's "Rules and Practice s," a copy o f this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or fr om the Publicly Available Records (PARS) component of NRC's J. H. Lash 2 document syste m (ADAMS).
==SUBJECT:==
ADAMS is accessi ble from the NRC Website at http://w ww.nrc.gov/readi ng-rm/ada ms.html (The Pu blic Elec tronic Readi ng Room).If circu mstance s aris e wh ich ca use us to cha nge the insp ectio n pla n, we wil l con tact y ou to discuss the c hange as soon as possibl
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - BEAVER VALLEY POWER STATION UNITS 1 AND 2
: e. Please contact me at 610
 
-337-5200 w ith any questio ns yo u may have regardi ng this lette r or the insp ectio n pla n. Sincere ly,/R A/Ronald R.
==Dear Mr. Lash:==
Bellamy, Chief Reactor Projects Branch 7 Divi sion of Reac tor Pro jects Docket Nos. 50-3 34, 50-412 License No
 
: s. DPR-66, N PF-73  
On August 9, 2006, the NRC staff completed its performance review of Beaver Valley Power Station Units 1 and 2 (Beaver Valley) for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Beaver Valley Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility. In addition to the baseline inspection procedures, inspections related to the Extended Power Uprate for Units 1 and 2 and inspections related to the Unit 2 Containment Sump Modifications will be performed.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs
 
J. H. Lash                                         2 document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                                /RA/
Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73


==Enclosure:==
==Enclosure:==
B eaver Val ley Pow er Station, Un its 1 and 2 Inspection/ A ctivity Plan cc w/encl:
Beaver Valley Power Station, Units 1 and 2 Inspection/ Activity Plan cc w/encl:
G. Leidich, P resident and Chief Nuclea r Officer J. Hagan, Senio r Vice Presi dent of Operations and Chief Operati ng Officer D. Pace, Seni or Vice Pres ident, Flee t Engineering J. Rinckel, Vi ce President, Fleet Oversi ght L. My ers, Ex ecuti ve Vi ce Pre siden t, Spec ial P rojects R. Anderson, V ice Presid ent, FirstEnergy Nuclear Opera ting Company Manager, Fle et Licensin g, FirstEnergy Nu clear Operating C ompany R. Mende, Director, Site Operations T. Cosgrove, Dire ctor, Main tenance P. Sena, Di rector, Engineeri ng L. Freeland, Director, Site Performance Improveme nt and Ma nager, Regulatory Compliance D. Jen kins, A ttorney , FENOC B. Sepelak, Su pervisor, N uclear Compl iance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department , Public Utilities Commission, State of Oh io D. Hill, Chief, Radiological Health Program , State of W est Virginia J. Lewis, Commissioner, Division of Labor, State of W est Virginia W. Hill, B eaver Coun ty Emergency Management Agenc y J. Johnsrud, Na tional Ene rgy Committee, Si erra Club J. H. Lash 3 Distribution w/encl:
G. Leidich, President and Chief Nuclear Officer J. Hagan, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight L. Myers, Executive Vice President, Special Projects R. Anderson, Vice President, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company R. Mende, Director, Site Operations T. Cosgrove, Director, Maintenance P. Sena, Director, Engineering L. Freeland, Director, Site Performance Improvement and Manager, Regulatory Compliance D. Jenkins, Attorney, FENOC B. Sepelak, Supervisor, Nuclear Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sos a, RI OE DO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo -
 
Senior Resi dent Inspector P. Garre tt - Res ident OA DRS Directo r, Region I DRS Deputy Director, Regi on I DRS Branch Chiefs (6)
J. H. Lash                                                   3 Distribution w/encl:
Region I Docket R oom (with c oncurrences)
S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sosa, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo - Senior Resident Inspector P. Garrett - Resident OA DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)
RidsNrrDip mIipb@nrc.gov Instit ute of N uclea r Pow er Oper ation s (INP O)SISP R eview Co mplete: _______RRB
Region I Docket Room (with concurrences)
____ (Reviewer's Initials)
RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)
D O C U M EN T NA M E: S:\R O P 7 M id C ycle Re vie w\2 00 6 R O P7 M id-C ycle Le tter s\B V 2 00 6 M id-C ycle Lett er.wpd After de clari ng this docume nt "An Official Agency Recor d" it will be released to the Publ ic.To re ceive a cop y of thi s docu ment, i ndicat e in t he box: " C" = Copy w ithout attachment/enclo sure  " E" = Copy w ith attachment/enclosur e  " N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/2006 8/29/2006 OFFICIAL RECORD COPY Beaver Valley Inspection / Activity Plan 07/01/2006
SISP Review Complete: _______RRB____ (Reviewers Initials)
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 09:31:36 Report 22 4 7111111B-L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT Baseline Inspections 07/31/2006 08/03/2006 1, 2  7111111B IP Licensed Operator Requalification Program 8 7111121-CDBI (COMPONENT DESIGN BASES INSPECTION)
DOCUMEN T NA ME: S :\ROP 7 Mid C ycle Re view\2 006 R OP7 Mid-Cycle Letters\B V 2006 M id-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
Baseline Inspections 07/10/2006 07/14/2006 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/17/2006 07/20/2006 1, 2   7111121 IP Component Design Bases Inspection 2 7111112B-MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 1, 2  7111112B IP Maintenance Effectiveness 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/02/2006 10/06/2006 1, 2  7112102 IP ALARA Planning and Controls 1 7111108P-UNIT 2 INSERVICE INSPECTION Baseline Inspections 10/10/2006 10/20/2006 2  7111108P IP Inservice Inspection Activities - PWR 1 TI-166-UNIT 2 CONTAINMENT SUMP MODIFICATIONS Safety Issues 10/23/2006 10/27/2006 2   2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE           RI/DRP                       RI/DRP NAME             ARosebrook/AAR               RBellamy/RRB DATE             7/31/2006                     8/29/2006 OFFICIAL RECORD COPY
2 TI-169-MSPI VERIFICATION Safety Issues 11/01/2006 12/15/2006 1, 2   2515/169 IP Mitigating Systems Performance Index Verification 1 71004-POWER UPRATE - EC/FAC Other Routine 12/04/2006 12/08/2006 1, 2  71004 IP Power Uprate 1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 12/11/2006 12/15/2006 1, 2  7112102 IP ALARA Planning and Controls 6 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1     7111105T IP Fire Protection [Triennial]
 
Baseline Inspections 02/05/2007 02/09/2007 1    7111105T IP Fire Protection [Triennial]
Page 1 of 2                                                                                Beaver Valley 08/31/2006    09:31:36                                                                Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit                                                                                                                  No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                  on Site         Start    End              Type 7111111B       - L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT                                                               4 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                    07/31/2006 08/03/2006 Baseline Inspections 7111121       - CDBI (COMPONENT DESIGN BASES INSPECTION)                                                           8 1, 2          IP 7111121              Component Design Bases Inspection                                                            07/10/2006 07/14/2006 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                             07/17/2006 07/20/2006 Baseline Inspections 7111112B      - MAINTENANCE RULE                                                                                  2 1, 2           IP 7111112B             Maintenance Effectiveness                                                                    09/11/2006 09/15/2006 Baseline Inspections 7112102       - OCC RAD SAFETY - ALARA                                                                             1 1, 2          IP 7112102              ALARA Planning and Controls                                                                  10/02/2006 10/06/2006 Baseline Inspections 7111108P       - UNIT 2 INSERVICE INSPECTION                                                                       1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                        10/10/2006 10/20/2006 Baseline Inspections TI-166         - UNIT 2 CONTAINMENT SUMP MODIFICATIONS                                                             1 2           IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]             10/23/2006  10/27/2006 Safety Issues TI-169         - MSPI VERIFICATION                                                                                 2 1, 2           IP 2515/169             Mitigating Systems Performance Index Verification                                             11/01/2006  12/15/2006 Safety Issues 71004         - POWER UPRATE - EC/FAC                                                                             1 1, 2          IP 71004                Power Uprate                                                                                  12/04/2006 12/08/2006 Other Routine 7112103       - OCC RAD SAFETY - INSTRUMENTS                                                                       1 1, 2          IP 7112102              ALARA Planning and Controls                                                                  12/11/2006 12/15/2006 Baseline Inspections TRI FIRE       - TRIENNIAL FIRE PROTECTION INSPECTION                                                               6 1              IP 7111105T              Fire Protection [Triennial]                                                                  01/22/2007 01/26/2007 Baseline Inspections 1             IP 7111105T             Fire Protection [Triennial]                                                                   02/05/2007 02/09/2007 Baseline Inspections 71114         - EP PRGM INSP                                                                                       1 1, 2           IP 7111402               Alert and Notification System Testing                                                         02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 7111403               Emergency Response Organization Augmentation Testing                                         02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                                             02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                             02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 71151-EP01           Drill/Exercise Performance                                                                   02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 71151-EP02           ERO Drill Participation                                                                       02/05/2007 02/09/2007 Baseline Inspections 1, 2           IP 71151-EP03           Alert & Notification System                                                                   02/05/2007 02/09/2007 Baseline Inspections 7112101        - OCC RAD SAFETY                                                                                    1 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                           03/05/2007  03/09/2007 Baseline Inspections 71152B         - PI&R                                                                                               4 1, 2          IP 71152B                Identification and Resolution of Problems                                                    03/26/2007 03/30/2007 Baseline Inspections 1, 2           IP 71152B               Identification and Resolution of Problems                                                     04/09/2007 04/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
1 71114-EP PRGM INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2   7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2   7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2   7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2   71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/05/2007 02/09/2007 1, 2   71151-EP02 IP ERO Drill Participation Baseline Inspections 02/05/2007 02/09/2007 1, 2   71151-EP03 IP Alert & Notification System 1 7112101-OCC RAD SAFETY Baseline Inspections 03/05/2007 03/09/2007 1, 2   7112101 IP Access Control to Radiologically Significant Areas 4 71152B-PI&R Baseline Inspections 03/26/2007 03/30/2007 1, 2   71152B IP Identification and Resolution of Problems Baseline Inspections 04/09/2007 04/13/2007 1, 2  71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Beaver Valley Inspection / Activity Plan 07/01/2006
 
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 09:31:36 Report 22 3 7111111B-LO REQUAL. PROG.(FOCUS U2)+P/F RVW Baseline Inspections 05/28/2007 07/06/2007 1, 2  7111111B IP Licensed Operator Requalification Program 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 05/14/2007 05/18/2007 1, 2   7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 4 7111117B-MODS AND 50.59 Baseline Inspections 06/04/2007 06/08/2007 1, 2   7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/04/2007 06/08/2007 1, 2   7111117B IP Permanent Plant Modifications 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 07/09/2007 07/13/2007 1, 2   7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 3 11/12EXM-U1 OPERATOR LICENSING INITIAL EXAM Not Applicable 10/15/2007 10/19/2007 1     U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM Not Applicable 11/12/2007 11/23/2007 1    U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 1 TI-166-CONTAINMENT SUMP MODIFICATIONS - UNIT 1 Safety Issues 10/15/2007 10/19/2007 1     2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
Page 2 of 2                                                                                Beaver Valley 08/31/2006    09:31:36                                                                Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit                                                                                                                          No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                  Title                                            on Site       Start    End              Type 7111111B       - LO REQUAL. PROG.(FOCUS U2)+P/F RVW                                                                         3 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                              05/28/2007 07/06/2007 Baseline Inspections 7112201       - PUB RAD SAFETY - RETS                                                                                       1 1, 2           IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                               05/14/2007  05/18/2007 Baseline Inspections 7111117B       - MODS AND 50.59                                                                                             4 1, 2           IP 7111102               Evaluation of Changes, Tests, or Experiments                                                           06/04/2007 06/08/2007 Baseline Inspections 1, 2           IP 7111117B             Permanent Plant Modifications                                                                         06/04/2007  06/08/2007 Baseline Inspections 7112203       - PUB RAD SAFETY - REMP                                                                                       1 1, 2           IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program         07/09/2007  07/13/2007 Baseline Inspections 11/12EXM       - U1 OPERATOR LICENSING INITIAL EXAM                                                                         3 1                U01685                FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM                                                          10/15/2007 10/19/2007 Not Applicable 1                 U01685               FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM                                                           11/12/2007 11/23/2007 Not Applicable TI-166         - CONTAINMENT SUMP MODIFICATIONS - UNIT 1                                                                     1 1             IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]                       10/15/2007  10/19/2007 Safety Issues 7112102       - OCC RAD SAFETY - ALARA                                                                                     1 1, 2          IP 7112102              ALARA Planning and Controls                                                                            10/29/2007 11/02/2007 Baseline Inspections 7111107       - HEAT SINK INSP                                                                                             2 1, 2          IP 7111107B              Heat Sink Performance                                                                                  11/05/2007 11/09/2007 Baseline Inspections 7111121        - CDBI                                                                                                        6 1, 2           IP 7111121               Component Design Bases Inspection                                                                      01/14/2008 01/18/2008 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                                     01/28/2008 02/01/2008 Baseline Inspections 1, 2           IP 7111121               Component Design Bases Inspection                                                                     02/04/2008 02/08/2008 Baseline Inspections 7112101       - OCC RAD SAFETY - ACCESS                                                                                     1 1, 2          IP 7112101              Access Control to Radiologically Significant Areas                                                    02/25/2008 02/29/2008 Baseline Inspections 7112102       - OCC RAD SAFETY - ALARA                                                                                     1 1, 2          IP 7112102              ALARA Planning and Controls                                                                            03/24/2008 03/28/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 10/29/2007 11/02/2007 1, 2  7112102 IP ALARA Planning and Controls 2 7111107-HEAT SINK INSP Baseline Inspections 11/05/2007 11/09/2007 1, 2   7111107B IP Heat Sink Performance 6 7111121-CDBI Baseline Inspections 01/14/2008 01/18/2008 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2   7111121 IP Component Design Bases Inspection Baseline Inspections 02/04/2008 02/08/2008 1, 2  7111121 IP Component Design Bases Inspection 1 7112101-OCC RAD SAFETY - ACCESS Baseline Inspections 02/25/2008 02/29/2008 1, 2  7112101 IP Access Control to Radiologically Significant Areas 1 7112102-OCC RAD SAFETY - ALARA Baseline Inspections 03/24/2008 03/28/2008 1, 2  7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 15:31, 23 November 2019

Mid-cycle Performance Review and Inspection Plan - Beaver Valley Power Station Units 1 and 2
ML062430597
Person / Time
Site: Beaver Valley
Issue date: 08/31/2006
From: Bellamy R
NRC/RGN-I/DRP/PB7
To: Lash J
FirstEnergy Nuclear Operating Co
References
Download: ML062430597 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - BEAVER VALLEY POWER STATION UNITS 1 AND 2

Dear Mr. Lash:

On August 9, 2006, the NRC staff completed its performance review of Beaver Valley Power Station Units 1 and 2 (Beaver Valley) for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Beaver Valley Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct the standard reactor oversight process (ROP) baseline inspections at your facility. In addition to the baseline inspection procedures, inspections related to the Extended Power Uprate for Units 1 and 2 and inspections related to the Unit 2 Containment Sump Modifications will be performed.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs

J. H. Lash 2 document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Ronald R. Bellamy, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos. 50-334, 50-412 License Nos. DPR-66, NPF-73

Enclosure:

Beaver Valley Power Station, Units 1 and 2 Inspection/ Activity Plan cc w/encl:

G. Leidich, President and Chief Nuclear Officer J. Hagan, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering J. Rinckel, Vice President, Fleet Oversight L. Myers, Executive Vice President, Special Projects R. Anderson, Vice President, FirstEnergy Nuclear Operating Company Manager, Fleet Licensing, FirstEnergy Nuclear Operating Company R. Mende, Director, Site Operations T. Cosgrove, Director, Maintenance P. Sena, Director, Engineering L. Freeland, Director, Site Performance Improvement and Manager, Regulatory Compliance D. Jenkins, Attorney, FENOC B. Sepelak, Supervisor, Nuclear Compliance M. Clancy, Mayor, Shippingport, PA D. Allard, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club

J. H. Lash 3 Distribution w/encl:

S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP R. Bellamy, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP B. Sosa, RI OEDO R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, NRR P. Cataldo - Senior Resident Inspector P. Garrett - Resident OA DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs (6)

Region I Docket Room (with concurrences)

RidsNrrDipmIipb@nrc.gov Institute of Nuclear Power Operations (INPO)

SISP Review Complete: _______RRB____ (Reviewers Initials)

DOCUMEN T NA ME: S :\ROP 7 Mid C ycle Re view\2 006 R OP7 Mid-Cycle Letters\B V 2006 M id-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR RBellamy/RRB DATE 7/31/2006 8/29/2006 OFFICIAL RECORD COPY

Page 1 of 2 Beaver Valley 08/31/2006 09:31:36 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - L.O. REQUAL PROG.(FOCUS U1)+P/F RSLT 4 1, 2 IP 7111111B Licensed Operator Requalification Program 07/31/2006 08/03/2006 Baseline Inspections 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 8 1, 2 IP 7111121 Component Design Bases Inspection 07/10/2006 07/14/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/17/2006 07/20/2006 Baseline Inspections 7111112B - MAINTENANCE RULE 2 1, 2 IP 7111112B Maintenance Effectiveness 09/11/2006 09/15/2006 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 10/02/2006 10/06/2006 Baseline Inspections 7111108P - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/10/2006 10/20/2006 Baseline Inspections TI-166 - UNIT 2 CONTAINMENT SUMP MODIFICATIONS 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/23/2006 10/27/2006 Safety Issues TI-169 - MSPI VERIFICATION 2 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 11/01/2006 12/15/2006 Safety Issues 71004 - POWER UPRATE - EC/FAC 1 1, 2 IP 71004 Power Uprate 12/04/2006 12/08/2006 Other Routine 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112102 ALARA Planning and Controls 12/11/2006 12/15/2006 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 6 1 IP 7111105T Fire Protection [Triennial] 01/22/2007 01/26/2007 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 02/05/2007 02/09/2007 Baseline Inspections 71114 - EP PRGM INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 02/05/2007 02/09/2007 Baseline Inspections 7112101 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/05/2007 03/09/2007 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 03/26/2007 03/30/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 04/09/2007 04/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Beaver Valley 08/31/2006 09:31:36 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - LO REQUAL. PROG.(FOCUS U2)+P/F RVW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 05/28/2007 07/06/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/14/2007 05/18/2007 Baseline Inspections 7111117B - MODS AND 50.59 4 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/04/2007 06/08/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/04/2007 06/08/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 07/09/2007 07/13/2007 Baseline Inspections 11/12EXM - U1 OPERATOR LICENSING INITIAL EXAM 3 1 U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 10/15/2007 10/19/2007 Not Applicable 1 U01685 FY08 - BEAVER VALLEY 1 INITIAL OPERATOR EXAM 11/12/2007 11/23/2007 Not Applicable TI-166 - CONTAINMENT SUMP MODIFICATIONS - UNIT 1 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/15/2007 10/19/2007 Safety Issues 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 10/29/2007 11/02/2007 Baseline Inspections 7111107 - HEAT SINK INSP 2 1, 2 IP 7111107B Heat Sink Performance 11/05/2007 11/09/2007 Baseline Inspections 7111121 - CDBI 6 1, 2 IP 7111121 Component Design Bases Inspection 01/14/2008 01/18/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 01/28/2008 02/01/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/04/2008 02/08/2008 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/25/2008 02/29/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 03/24/2008 03/28/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.