ML071570118: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:iRort Palla -Cost Benefit Equation Terms .....Page 1 From: Robert Palla To: jojones@sandia.gov Date: 05/24/2007 7:10:00 AM  
{{#Wiki_filter:iRort Palla - Cost Benefit Equation Terms                                                             .....         Page 1 From:               Robert Palla To:               jojones@sandia.gov Date:               05/24/2007 7:10:00 AM


==Subject:==
==Subject:==
Cost Benefit Equation Terms Joe -I am not sure whether I had provided you with this table previously.
Cost Benefit Equation Terms Joe - I am not sure whether I had provided you with this table previously. Itshows how each of the terms in the cost benefit equation are derived, and their relative significance for Pilgrim. Bob CC:                 nbixler@sandia.gov
It shows how each of the terms in the cost benefit equation are derived, and their relative significance for Pilgrim. Bob CC: nbixler@sandia.gov
 
: 1. C':\t6&#xfd;ip\GW)00001.&#xfd;&#xfd;T&#xfd;&#xfd;&#xfd;'M''P&#xfd;-'-P-aiWi 11 I c:\te1~n p\GW}OOQOl .TMP Page 1<Mail Envelope Properties (46557288.5A6
1.C':\t6&#xfd;ip\GW)00001.&#xfd;&#xfd;T&#xfd;&#xfd;&#xfd;'M''P&#xfd;-'                                                                         -P-aiWi11 1<
:18 :10412)
Page Ic:\te1~n p\GW}OOQOl .TMP Mail Envelope Properties     (46557288.5A6 :18 :10412)


==Subject:==
==Subject:==
Creation Date From: Created By: Cost Benefit Equation Terms 05/24/2007 7:10:00 AM Robert Palla RLP3 (@l)nrc.gov Recipients sandia.gov AM jojones (ioiones(asandia.gov) nbixler CC (nbixler(asandia.gov)
Cost Benefit Equation Terms Creation Date          05/24/2007 7:10:00 AM From:                  Robert Palla Created By:            RLP3 (@l)nrc.gov Recipients                                       Action              Date & Time sandia.gov                                       Transferred          05/24/2007 7:10:30 AM jojones (ioiones(asandia.gov) nbixler CC (nbixler(asandia.gov)
Action Transferred Date & Time 05/24/2007 7:10:30 Post Office Delivered Route sandia.gov Files Size MESSAGE 505 Cost benefit equation and description of terms.wpd AM Date & Time 05/24/2007 7:10:00 AM 9603 02/21/2007 11:13:12 Options Auto Delete: Expiration Date: Notify Recipients:
Post Office                                         Delivered         Route sandia.gov Files                           Size               Date & Time MESSAGE                          505                05/24/2007 7:10:00 AM Cost benefit equation and description of terms.wpd 9603               02/21/2007 11:13:12 AM Options Auto Delete:                     No Expiration Date:                 None Notify Recipients:               Yes Priority:                       Standard ReplyRequested:                 No Return Notification:             None Concealed  
Priority: ReplyRequested:
Return Notification:
Concealed  


==Subject:==
==Subject:==
Security: To Be Delivered:
No Security:                       Standard To Be Delivered:                 Immediate Status Tracking:                 Delivered & Opened
Status Tracking: No None Yes Standard No None No Standard Immediate Delivered  
 
& Opened  
                                                                                                                                                  .3 4
.3 4 Net Value = (APE + AOC + AOE + AOSC) -COE, where APE =AOC =AOE =AOSC =COE-averted public exposure costs averted offsite property damage costs averted occupational exposure costs averted onsite costs averted cleanup and decontamination costs (ACC) + averted replacement power costs (ARPC)cost of enhancement Cost Significance NUREG/BR-Related Parameters Value If All Internally-Initiated Core Factor 0184 Section Damage Events at Pilgrim Are Eliminated APE Offsite exposure 5.7.1 AP-Rem (from MACCS2) $314K AOC Offsite economic 5.7.5 AOffsite Economic Cost Risk -OECR (from MACCS2) $566K From 12/12/2006 Entergy letter, Attachment C, Table E. 1-15:-CAPB-12: $4.85E6/event
Net Value = (APE + AOC + AOE + AOSC) - COE, where APE     = averted public exposure costs AOC    = averted offsite property damage costs AOE    = averted occupational exposure costs AOSC    = averted onsite costs averted cleanup and decontamination costs (ACC) + averted replacement power costs (ARPC)
-CAPB-14: $4.96E9/event
COE-      cost of enhancement Cost     Significance   NUREG/BR-                           Related Parameters                       Value If All Internally-Initiated Core Factor                     0184 Section                                                                     Damage Events at Pilgrim Are Eliminated APE     Offsite exposure     5.7.1     AP-Rem (from MACCS2)                                                             $314K AOC     Offsite economic     5.7.5     AOffsite Economic Cost Risk - OECR (from MACCS2)                                 $566K From 12/12/2006 Entergy letter, Attachment C, Table E. 1-15:
-CAPB-15: $18.0E9/event
                                        - CAPB-12: $4.85E6/event
-frequency-weighted sum for all CAPBs = $8.21 E9/event From NUREG/BR-0184, Table 5.6 (1990$ costs, within 50 miles):-average for all NUREG-1 150 plants = $2.46E8/event  
                                        - CAPB-14: $4.96E9/event
--highest NUREG-1 150 plant (Peach Bottom) = $2.71 E9/event AOE Onsite exposure 5.7.3 Immediate occupational dose (3,300 P-Rem) $2K Long term occupational dose (20,000 P-Rem)ACC Onsite economic 5.7.6.1 Onsite cleanup and decontamination cost ($1.1E9.single event, PW) $76K ARPC Onsite economic 5.7.6.2 Plant power level. $51 K}}
                                        - CAPB-15: $18.0E9/event
                                        - frequency-weighted sum for all CAPBs = $8.21 E9/event From NUREG/BR-0184, Table 5.6 (1990$ costs, within 50 miles):
                                        - average for all NUREG-1 150 plants = $2.46E8/event -
                                        - highest NUREG-1 150 plant (Peach Bottom) = $2.71 E9/event AOE     Onsite exposure     5.7.3     Immediate occupational dose (3,300 P-Rem)                                           $2K Long term occupational dose (20,000 P-Rem)
ACC     Onsite economic     5.7.6.1   Onsite cleanup and decontamination cost ($1.1E9.single event, PW)                 $76K ARPC     Onsite economic     5.7.6.2   Plant power level.                                                                 $51 K}}

Latest revision as of 06:36, 23 November 2019

E-MAIL: (NPA-PD) Cost Benefit Equation Terms
ML071570118
Person / Time
Site: Pilgrim
Issue date: 05/24/2007
From: Palla R
NRC/NRR/ADES
To: Jackie Jones
Sandia
References
TAC MD3698
Download: ML071570118 (3)


Text

iRort Palla - Cost Benefit Equation Terms ..... Page 1 From: Robert Palla To: jojones@sandia.gov Date: 05/24/2007 7:10:00 AM

Subject:

Cost Benefit Equation Terms Joe - I am not sure whether I had provided you with this table previously. Itshows how each of the terms in the cost benefit equation are derived, and their relative significance for Pilgrim. Bob CC: nbixler@sandia.gov

1.C':\t6ýip\GW)00001.ýýTýýý'MPý-' -P-aiWi11 1<

Page Ic:\te1~n p\GW}OOQOl .TMP Mail Envelope Properties (46557288.5A6 :18 :10412)

Subject:

Cost Benefit Equation Terms Creation Date 05/24/2007 7:10:00 AM From: Robert Palla Created By: RLP3 (@l)nrc.gov Recipients Action Date & Time sandia.gov Transferred 05/24/2007 7:10:30 AM jojones (ioiones(asandia.gov) nbixler CC (nbixler(asandia.gov)

Post Office Delivered Route sandia.gov Files Size Date & Time MESSAGE 505 05/24/2007 7:10:00 AM Cost benefit equation and description of terms.wpd 9603 02/21/2007 11:13:12 AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

.3 4

Net Value = (APE + AOC + AOE + AOSC) - COE, where APE = averted public exposure costs AOC = averted offsite property damage costs AOE = averted occupational exposure costs AOSC = averted onsite costs averted cleanup and decontamination costs (ACC) + averted replacement power costs (ARPC)

COE- cost of enhancement Cost Significance NUREG/BR- Related Parameters Value If All Internally-Initiated Core Factor 0184 Section Damage Events at Pilgrim Are Eliminated APE Offsite exposure 5.7.1 AP-Rem (from MACCS2) $314K AOC Offsite economic 5.7.5 AOffsite Economic Cost Risk - OECR (from MACCS2) $566K From 12/12/2006 Entergy letter, Attachment C, Table E. 1-15:

- CAPB-12: $4.85E6/event

- CAPB-14: $4.96E9/event

- CAPB-15: $18.0E9/event

- frequency-weighted sum for all CAPBs = $8.21 E9/event From NUREG/BR-0184, Table 5.6 (1990$ costs, within 50 miles):

- average for all NUREG-1 150 plants = $2.46E8/event -

- highest NUREG-1 150 plant (Peach Bottom) = $2.71 E9/event AOE Onsite exposure 5.7.3 Immediate occupational dose (3,300 P-Rem) $2K Long term occupational dose (20,000 P-Rem)

ACC Onsite economic 5.7.6.1 Onsite cleanup and decontamination cost ($1.1E9.single event, PW) $76K ARPC Onsite economic 5.7.6.2 Plant power level. $51 K