ML112411315: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES N UCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA, PA 19406-1415 September 1, 2011 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038  
{{#Wiki_filter:UNITED STATES N UCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA, PA 19406-1415 September       1,   2011 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038


==SUBJECT:==
==SUBJECT:==
MID.CYCLE LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354t201 1 006)
MID.CYCLE LETTER FOR                 HOPE CREEK GENERATING STATION (REPORT 05000354t201 1 006)


==Dear Mr. Joyce:==
==Dear Mr. Joyce:==
On August 11, 2011, the NRC completed its mid-cycle performance review of Hope Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (Pls)in addition to inspection results and enforcement actions from July 1,2010, through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information.
On August 11, 2011, the NRC completed its mid-cycle performance review of Hope Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from July 1,2010, through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.The NRC determined the performance at Hope Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.The enclosed inspection plan lists the inspections scheduled through December 31,2012.Routine inspections performed by resident inspectors are not included in the inspection plan.The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan to conduct an inspection of your lSFSl. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)" at your facility.
The NRC determined the performance at Hope Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Results of these inspections can be found here: http://www.nrc.oov/iapan/iapan-activities.html.
The enclosed inspection plan lists the inspections scheduled through December 31,2012.
Additionally, on May 1 1, 2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order T. Joyce 2 EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs.
Routine inspections performed by resident inspectors are not included in the inspection plan.
On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of Insights from the Fukushima OaiiCfriAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan to conduct an inspection of your lSFSl. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
fnaccordancewith 10CFR 2.390 of theNRC's"Rulesof Practice,"acopyof thisletterwill be available electronically for public inspection in the NRC Public Document Room or from the publicly Available Records'(PARS) component of NRC's document system (ADAMS)' ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams'html (the Public Electronic Reading Room).please contact me at 610-337-5069 with any questions you have regarding this letter.Sincerely, i 4e',y'n i fi__t //w I L." ury f--l"L L, 'v ArtXur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57  
In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)" at your facility. Results of these inspections can be found here:
http://www.nrc.oov/iapan/iapan-activities.html. Additionally, on May 1 1, 2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order
 
T. Joyce                                         2 EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of Insights from the Fukushima OaiiCfriAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
fnaccordancewith 10CFR 2.390 of theNRC's"Rulesof Practice,"acopyof thisletterwill be available electronically for public inspection in the NRC Public Document Room or from the publicly Available Records'(PARS) component of NRC's document system (ADAMS)' ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams'html (the Public Electronic Reading Room).
please contact me at 610-337-5069 with any questions you have regarding this letter.
Sincerely, i           4e',y'n iI L."fi__t ury
                                                                              //w f--l"L L, 'v ArtXur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57


==Enclosure:==
==Enclosure:==
Inspection Plan cc w/encl: Distribution via ListServ


Inspection Plan cc w/encl: Distribution via ListServ T. Joyce EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs.
T. Joyce EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21" Century: The Near-Term Task Force Review of Insights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21" Century: The Near-Term Task Force Review of Insights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:l/vwr,rr,ry.nrc.ggvlreadinq-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:l/vwr,rr,ry.nrc.ggvlreadinq-rm/adams.html (the Public Electronic Reading Room).Please contact me at 610-337-5069 with any questions you have regarding this letter.Sincerely, IRAI Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57  
Please contact me at 610-337-5069 with any questions you have regarding this letter.
Sincerely, IRAI Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57


==Enclosure:==
==Enclosure:==
lnspection Plan cc Wencl: Distribution via ListServ Distribution: see attached page SUNSI REVTEW COMPLETE:                      ALB            (Reviewer's      Initials)            ML112411315 DOCUMENT NAME: S:\ROP-1 2 MID-CYCLE REVIE\ ABRANCH 3\LETTERS(ATTACHMENTI )\
HC MID-CYCLE LETTER2O1 1.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in box:'Cu = Copy w/o attachmenUenclosure, E" = Copy w/ attachmenUenclosure"N"=No copy
)FFICE      mmt      tI/DRP                      RI/DRP                    R/DRP lAME                  :Bower/ LC for              LCline/ LC                ABurritV ALB
)ATE                  )8t26  t11                  )8t26 t11                )8129t11 OFFICIAL RECORD COPY
T. Joyce Distribution w/encl:
W. Dean,M D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP F. Bower, DRP, SRI A. Patel, DRP, Rl K. McKenzie, DRP, OA J. McHale, Rl OEDO DRS Branch Chiefs (6)
N. McNamara, SLO D. Tifft, SLO D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA RidsNrrPMHopeCreek Resource Rids N rrDorlLpll -2 Resou rce ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource


lnspection Plan cc Wencl: Distribution via ListServ Distribution:
Page 1 ot 2                                                                                 Hope Greek 0812912011 08:59:19                                                               Inspection / Activity Plan Report 22 07t01t2011 - 12t31r2012 Planned Dates                                                                                                                                       No. of Staff I   Start       End                                                                                                                                       on Site 71124             . REMP 07t25t2011 07t29t2011     tP 71124.07               Radiological Environmental Monitoring Program 71124             - HP 1          o9/t9120't1  0912312011  tP 60855.1                 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1          09t1912011  0912312011  tP 71',t24.01              Radiological Hazard Assessment and Exposure Controls 1          0s/19t2011  09123t2011  tP 71124.03                In-Plant Airborne Radioactivity Control and Mitigation 1         09t19t20't't 09t23t2011   lP 71124.04                Occuoational Dose Assessment 3/05EXAM          . HOPE CREEK INITIAL EXAM 02t0,12012  0211012012      u01845                  FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 03t05t2012  03t16t2012      u01845                  FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 71124            . RADWASTE 121121201'l 1211612011 lP   71124.08               Radioactive Solid Waste Processing   and Radioactive Material Handling, Storage, and Transportation 71124.06 - PUB RAD SAFETY - RETS 01109t2012 0111312012 tP 71124.05                   Radiation Monitoring Instrumentation 01109t2012 01113t20j2 lp 71124.06                   Radioactive Gaseous and Liquid Effluent Treatment 7111108G - INSERVICE               INSPEGTION 04123120'12 O4l27l2O'12 lP 7111108G               lnservice Inspection Actlvities - BWR 71124 -OCC RADSAFETY 04t2312012 04t2712012 lP 71124.01                   Radiological Hazard Assessment and Exposure Controls 04t2312012 04t2712012 lP 71124.02                   Occupational ALAM Planning and Controls EP EXER - EP EXERGISE EVALUATION o5t2'll2o'12 05t2512012 lP 7'111401                 Exercise Evaluation 0512112012 OSt25l2O12 lP 7111404                   Emergency Action Level and Emergency Plan Changes 71124             - RADSAFETY 1          07116t2012 07l2OI2O12 lp 71124.0j                   Radiological Hazard Assessment and Exposure Controls I        07l16t2oj2 07lZ0t2O12 lp 71124.02                   Occupational ATARA Planning and Controls 1          07/t612012 O7l20t2O1Z tp 71124.03                   In-Plant Airborne Radioactivity Control and Mitigation 1          0711612012 0712012012 lP 71124.04                   Occupational Dose Assessment 7111121 - CDBI 1          O7l3Ol2O12 O8lO3l2O12 lP 71'1112'l                 Component Design Bases Inspection 1          OBl13l2O12 0911712012 lP 71'1112'l                 Component Design Bases Inspection 1          OBl27l2O12 0813112012 lP 7111121                   Component Design Bases lnspection 71111118         - REQUAL INSPECTION WITH P/F RESULTS 1010812012 1011212012 lP   711'11118               Licensed Operator Requalification Program fhis report does not include INPO and OUTAGE activities.
see attached page SUNSI REVTEW COMPLETE:
ALB (Reviewer's Initials)
ML112411315 DOCUMENT NAME: S:\ROP-1 2 MID-CYCLE REVIE\ ABRANCH 3\LETTERS(ATTACHMENTI
)\HC MID-CYCLE LETTER2O1 1.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in box:'Cu = Copy w/o attachmenUenclosure, E" = Copy w/ attachmenUenclosure"N"=No copy)FFICE mmt tI/DRP RI/DRP R/DRP lAME:Bower/ LC for LCline/ LC ABurritV ALB)ATE)8t26 t11)8t26 t11)8129t11 OFFICIAL RECORD COPY T. Joyce Distribution w/encl: W. Dean,M D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP F. Bower, DRP, SRI A. Patel, DRP, Rl K. McKenzie, DRP, OA J. McHale, Rl OEDO DRS Branch Chiefs (6)N. McNamara, SLO D. Tifft, SLO D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA RidsNrrPMHopeCreek Resource Rids N rrDorlLpll
-2 Resou rce ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource Page 1 ot 2 0812912011 08:59:19 Report 22 Hope Greek Inspection  
/ Activity Plan 07t01t2011 - 12t31r2012 Planned Dates I Start End 71124 . REMP 07t25t2011 07t29t2011 tP 71124.07 71124 - HP tP 60855.1 tP 71',t24.01 tP 71124.03 lP 71124.04 3/05EXAM u01845 u01845 71124 Radiological Environmental Monitoring Program Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls In-Plant Airborne Radioactivity Control and Mitigation Occuoational Dose Assessment No. of Staff on Site 1 1 1 1 o9/t9120't1 0912312011 09t1912011 0912312011 0s/19t2011 09123t2011 09t19t20't't 09t23t2011 02t0*,12012 0211012012 03t05t2012 03t16t2012. HOPE CREEK INITIAL EXAM FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM. RADWASTE 1 I 1 1 1 1 1 121121201'l 1211612011 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.06 - PUB RAD SAFETY - RETS 01109t2012 0111312012 tP 71124.05 Radiation Monitoring Instrumentation 01109t2012 01113t20j2 lp 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108G - INSERVICE INSPEGTION 04123120'12 O4l27l2O'12 lP 7111108G lnservice Inspection Actlvities - BWR 71124 -OCC RADSAFETY 04t2312012 04t2712012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 04t2312012 04t2712012 lP 71124.02 Occupational ALAM Planning and Controls EP EXER - EP EXERGISE EVALUATION o5t2'll2o'12 05t2512012 lP 7'111401 Exercise Evaluation 0512112012 OSt25l2O12 lP 7111404 Emergency Action Level and Emergency Plan Changes 71124 - RADSAFETY 07116t2012 07l2OI2O12 lp 71124.0j Radiological Hazard Assessment and Exposure Controls 07l16t2oj2 07lZ0t2O12 lp 71124.02 Occupational ATARA Planning and Controls 07/t612012 O7l20t2O1Z tp 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 0711612012 0712012012 lP 71124.04 Occupational Dose Assessment 7111121 - CDBI O7l3Ol2O12 O8lO3l2O12 lP 71'1112'l Component Design Bases Inspection OBl13l2O12 0911712012 lP 71'1112'l Component Design Bases Inspection OBl27l2O12 0813112012 lP 7111121 Component Design Bases lnspection 71111118 - REQUAL INSPECTION WITH P/F RESULTS 1010812012 1011212012 lP 711'11118 Licensed Operator Requalification Program fhis report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Page 2 ot 2 08t29t2011 Report 22 08:59:19 Hope Greek Inspection  
 
/ Activity Plan o7101t2011 - 12t31t2012 Unlt Number Planned Dates Start End No. of Staff on Site 09t10120't2 09t10t20't2 09t't0t20't2 09t10t2012 09t10t2012 09t10t2012 09t14t2012 ogrt4P012 ogt't4t2012 09t14t2012 09t1412012 09t14t2012 71124 . RAD SAFETY & ISFSI lP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 7'1124.02 Occupational ALARA Planning and Controls lP 7'l'l24.OS Radiation Monitoring Instrumentation lP 71 1 51-OR01 Occupational Exposure Control Effectiveness lP 71 151-PR01 RETS/ODCM Radiological Effluent[his report does not include INPO and OUTAGE activities.
Page 2 ot 2                                                                               Hope Greek 08t29t2011     08:59:19                                                         Inspection / Activity Plan o7101t2011 - 12t31t2012 Report 22 Unlt           Planned Dates                                                                                                                   No. of Staff Number          Start      End                                                                                                                    on Site 71124         . RAD SAFETY & ISFSI 09t10120't2  09t14t2012  lP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09t10t20't2  ogrt4P012    lP 71124.01             Radiological Hazard Assessment and Exposure Controls 09t't0t20't2  ogt't4t2012  lP 7'1124.02             Occupational ALARA Planning and Controls 09t10t2012    09t14t2012  lP 7'l'l24.OS           Radiation Monitoring Instrumentation 09t10t2012    09t1412012  lP 71 1 51-OR01         Occupational Exposure Control Effectiveness 09t10t2012    09t14t2012  lP 71 151-PR01           RETS/ODCM Radiological Effluent
I This report shows only on-site and announced inspection procedures.
[his report does not include INPO and OUTAGE activities.                                       I This report shows only on-site and announced inspection procedures.                           I}}
I}}

Latest revision as of 16:30, 12 November 2019

Mid-Cycle Performance Review and Inspection Plan 2011 - Hope Creek Generating Station
ML112411315
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/01/2011
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT AL
References
IR-11-006
Download: ML112411315 (6)


Text

UNITED STATES N UCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSIA, PA 19406-1415 September 1, 2011 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

MID.CYCLE LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354t201 1 006)

Dear Mr. Joyce:

On August 11, 2011, the NRC completed its mid-cycle performance review of Hope Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from July 1,2010, through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Hope Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31,2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan to conduct an inspection of your lSFSl. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)" at your facility. Results of these inspections can be found here:

http://www.nrc.oov/iapan/iapan-activities.html. Additionally, on May 1 1, 2011, the agency issued NRC Bulletin 2011-01, "Mitigating Strategies," to confirm compliance with Order

T. Joyce 2 EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of Insights from the Fukushima OaiiCfriAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.

fnaccordancewith 10CFR 2.390 of theNRC's"Rulesof Practice,"acopyof thisletterwill be available electronically for public inspection in the NRC Public Document Room or from the publicly Available Records'(PARS) component of NRC's document system (ADAMS)' ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams'html (the Public Electronic Reading Room).

please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely, i 4e',y'n iI L."fi__t ury

//w f--l"L L, 'v ArtXur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57

Enclosure:

Inspection Plan cc w/encl: Distribution via ListServ

T. Joyce EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21" Century: The Near-Term Task Force Review of Insights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:l/vwr,rr,ry.nrc.ggvlreadinq-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely, IRAI Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57

Enclosure:

lnspection Plan cc Wencl: Distribution via ListServ Distribution: see attached page SUNSI REVTEW COMPLETE: ALB (Reviewer's Initials) ML112411315 DOCUMENT NAME: S:\ROP-1 2 MID-CYCLE REVIE\ ABRANCH 3\LETTERS(ATTACHMENTI )\

HC MID-CYCLE LETTER2O1 1.DOCX After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in box:'Cu = Copy w/o attachmenUenclosure, E" = Copy w/ attachmenUenclosure"N"=No copy

)FFICE mmt tI/DRP RI/DRP R/DRP lAME :Bower/ LC for LCline/ LC ABurritV ALB

)ATE )8t26 t11 )8t26 t11 )8129t11 OFFICIAL RECORD COPY

T. Joyce Distribution w/encl:

W. Dean,M D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP F. Bower, DRP, SRI A. Patel, DRP, Rl K. McKenzie, DRP, OA J. McHale, Rl OEDO DRS Branch Chiefs (6)

N. McNamara, SLO D. Tifft, SLO D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA RidsNrrPMHopeCreek Resource Rids N rrDorlLpll -2 Resou rce ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource

Page 1 ot 2 Hope Greek 0812912011 08:59:19 Inspection / Activity Plan Report 22 07t01t2011 - 12t31r2012 Planned Dates No. of Staff I Start End on Site 71124 . REMP 07t25t2011 07t29t2011 tP 71124.07 Radiological Environmental Monitoring Program 71124 - HP 1 o9/t9120't1 0912312011 tP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 09t1912011 0912312011 tP 71',t24.01 Radiological Hazard Assessment and Exposure Controls 1 0s/19t2011 09123t2011 tP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09t19t20't't 09t23t2011 lP 71124.04 Occuoational Dose Assessment 3/05EXAM . HOPE CREEK INITIAL EXAM 02t0,12012 0211012012 u01845 FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 03t05t2012 03t16t2012 u01845 FY12-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 71124 . RADWASTE 121121201'l 1211612011 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.06 - PUB RAD SAFETY - RETS 01109t2012 0111312012 tP 71124.05 Radiation Monitoring Instrumentation 01109t2012 01113t20j2 lp 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108G - INSERVICE INSPEGTION 04123120'12 O4l27l2O'12 lP 7111108G lnservice Inspection Actlvities - BWR 71124 -OCC RADSAFETY 04t2312012 04t2712012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 04t2312012 04t2712012 lP 71124.02 Occupational ALAM Planning and Controls EP EXER - EP EXERGISE EVALUATION o5t2'll2o'12 05t2512012 lP 7'111401 Exercise Evaluation 0512112012 OSt25l2O12 lP 7111404 Emergency Action Level and Emergency Plan Changes 71124 - RADSAFETY 1 07116t2012 07l2OI2O12 lp 71124.0j Radiological Hazard Assessment and Exposure Controls I 07l16t2oj2 07lZ0t2O12 lp 71124.02 Occupational ATARA Planning and Controls 1 07/t612012 O7l20t2O1Z tp 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 0711612012 0712012012 lP 71124.04 Occupational Dose Assessment 7111121 - CDBI 1 O7l3Ol2O12 O8lO3l2O12 lP 71'1112'l Component Design Bases Inspection 1 OBl13l2O12 0911712012 lP 71'1112'l Component Design Bases Inspection 1 OBl27l2O12 0813112012 lP 7111121 Component Design Bases lnspection 71111118 - REQUAL INSPECTION WITH P/F RESULTS 1010812012 1011212012 lP 711'11118 Licensed Operator Requalification Program fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 ot 2 Hope Greek 08t29t2011 08:59:19 Inspection / Activity Plan o7101t2011 - 12t31t2012 Report 22 Unlt Planned Dates No. of Staff Number Start End on Site 71124 . RAD SAFETY & ISFSI 09t10120't2 09t14t2012 lP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09t10t20't2 ogrt4P012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 09t't0t20't2 ogt't4t2012 lP 7'1124.02 Occupational ALARA Planning and Controls 09t10t2012 09t14t2012 lP 7'l'l24.OS Radiation Monitoring Instrumentation 09t10t2012 09t1412012 lP 71 1 51-OR01 Occupational Exposure Control Effectiveness 09t10t2012 09t14t2012 lP 71 151-PR01 RETS/ODCM Radiological Effluent

[his report does not include INPO and OUTAGE activities. I This report shows only on-site and announced inspection procedures. I