IR 05000354/2015006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713     March 2, 2016 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2015006)
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION I==
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 2, 2016 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2015006)


==Dear Mr. Braun:==
==Dear Mr. Braun:==
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you period and its plans for future inspections at your facility. The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, .As discussed below, the NRC will also perform Temporary Instruction (TI) 2515-the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-p, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-ying Licenses with Regard to Reliable remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Hope Creek, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, nt Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment From January 1 to December 31, 2015, the NRC issued three SL-IV traditional enforcement violations associated with impeding the regulatory process. The violations occurred over a -up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. In accordance with NRC Inspection Manual Chapter 0305, violations through a baseline inspection (71111.11B) listed in the enclosed inspection plan and the second through IP -up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Follow-up for the third violation was already completed through baseline inspection. In accordance with Title 10 of the Code of Federal Regulations the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
 
Routine inspections performed by resident inspectors are not included in the inspection plan.
 
In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. As discussed below, the NRC will also perform Temporary Instruction (TI) 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Hope Creek, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.
 
From January 1 to December 31, 2015, the NRC issued three SL-IV traditional enforcement violations associated with impeding the regulatory process. The violations occurred over a 17 year period, and therefore the NRC has decided not to perform IP 92723, Follow-up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, Section 13.02.b, the NRC will follow up one of the violations through a baseline inspection (71111.11B) listed in the enclosed inspection plan and the second through IP 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders. Follow-up for the third violation was already completed through baseline inspection.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 Enclosure: Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ  
/RA/
Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 Enclosure: Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ
 
ML16055A328 SUNSI Review Non-Sensitive  Publicly Available Sensitive  Non-Publicly Available OFFICE R1/DRP  R1/DRP  R1/DRP NAME JHawkins/MXD per telecon MDraxton/ MXD FBower/ FLB DATE 02/22 /16  02/23 /16 02/ 23 /16
 
Page 1 of 3      Hope Creek 02/23/2016 12:18:40    Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site TRI FI - TRIENNIAL FIRE PROTECTION    4 1 03/14/2016 03/18/2016 IP 7111105T Fire Protection [Triennial]
1 03/28/2016 04/01/2016 IP 7111105T Fire Protection [Triennial]
EP - EP EXERCISE EVALUATION    1 1 05/16/2016 05/20/2016 IP 7111401 Exercise Evaluation EXM8/15 - HOPE CREEK INITIAL EXAMINATION    5 1 07/18/2016 07/22/2016 U01925 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 1 08/22/2016 09/02/2016 U01925 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 92702 - IP 92702    1 1 05/23/2016 05/26/2016 IP 92702  Followup On Corrective Actions For Violations And Deviations 71124 - ENVIRONMENTAL    1 1 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 71124 - RADIATION PROTECTION    1 1 06/20/2016 06/24/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/20/2016 06/24/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 06/20/2016 06/24/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/20/2016 06/24/2016 IP 71124.04 Occupational Dose Assessment 1 06/20/2016 06/24/2016 IP 71124.05 Radiation Monitoring Instrumentation 7111111B - HOPE CREEK REQUAL INSP W/ P/F RESULTS  2 1 09/12/2016 09/16/2016 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION PROTECTION    1 1 09/12/2016 09/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 09/12/2016 09/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/12/2016 09/16/2016 IP 71124.04 Occupational Dose Assessment 1 09/12/2016 09/16/2016 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - INSERVICE INSPECTION    1 1 10/17/2016 10/21/2016 IP 7111108G Inservice Inspection Activities - BWR 71124 - RADIATION PROTECTION    1 1 10/17/2016 10/21/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/17/2016 10/21/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/17/2016 10/21/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/17/2016 10/21/2016 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Page 2 of 3      Hope Creek 02/23/2016 12:18:40    Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 71124 - RADIATION PROTECTION      1 1 10/17/2016 10/21/2016 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION PROTECTION      1 1 12/12/2016 12/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/12/2016 12/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 12/12/2016 12/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/12/2016 12/16/2016 IP 71124.04 Occupational Dose Assessment 1 12/12/2016 12/16/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 12/12/2016 12/16/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/12/2016 12/16/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71152B - PI&R BIENNIAL      1 1 01/30/2017 02/03/2017 IP 71152B Problem Identification and Resolution 1 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution MODS - PERMANENT PLANT MODIFICATIONS    3 1 03/13/2017 03/17/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 03/27/2017 03/31/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP PROGRAM INSPECTION      1 1 05/15/2017 05/19/2017 IP 7111402 Alert and Notification System Testing 1 05/15/2017 05/19/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/15/2017 05/19/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 05/15/2017 05/19/2017 IP 71151  Performance Indicator Verification 7111107T - TRIENNIAL HEAT SINK      1 1 06/19/2017 06/23/2017 IP 7111107T Heat Sink Performance 71124 - RADIATION PROTECTION - EFFLUENTS    1 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - RADIATION PROTECTION      1 1 07/24/2017 07/28/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/24/2017 07/28/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 07/24/2017 07/28/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/24/2017 07/28/2017 IP 71124.04 Occupational Dose Assessment 1 07/24/2017 07/28/2017 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI LOADING CAMPAIGN INSPECTION    1 1 08/07/2017 08/11/2017 IP 60855  Operation Of An ISFSI This report does not include INPO and OUTAGE activities.


ML16055A328  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP NAME JHawkins/MXD per telecon MDraxton/ MXD FBower/ FLB DATE 02/22 /16 02/23 /16 02/ 23 /16 Page 1 of 3 02/23/2016 12:18:40 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 01/01/2016-12/31/2017 TRI FI-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T 03/14/2016 03/18/2016 1 IP Fire Protection [Triennial]7111105T 03/28/2016 04/01/2016 EP-EP EXERCISE EVALUATION 1 1 IP Exercise Evaluation7111401 05/16/2016 05/20/2016 EXM8/15-HOPE CREEK INITIAL EXAMINATION 5 1 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01925 07/18/2016 07/22/2016 1 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01925 08/22/2016 09/02/2016 92702-IP 92702 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 05/23/2016 05/26/201671124-ENVIRONMENTAL 1 1 IP Radiological Environmental Monitoring Program71124.07 06/06/2016 06/10/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 06/20/2016 06/24/2016 1 IP Occupational ALARA Planning and Controls71124.02 06/20/2016 06/24/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 06/20/2016 06/24/2016 1 IP Occupational Dose Assessment71124.04 06/20/2016 06/24/2016 1 IP Radiation Monitoring Instrumentation71124.05 06/20/2016 06/24/20167111111B-HOPE CREEK REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B 09/12/2016 09/16/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/12/2016 09/16/2016 1 IP Occupational ALARA Planning and Controls71124.02 09/12/2016 09/16/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/12/2016 09/16/2016 1 IP Occupational Dose Assessment71124.04 09/12/2016 09/16/2016 1 IP Radiation Monitoring Instrumentation71124.05 09/12/2016 09/16/20167111108G-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 10/17/2016 10/21/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/17/2016 10/21/2016 1 IP Occupational ALARA Planning and Controls71124.02 10/17/2016 10/21/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/17/2016 10/21/2016 1 IP Occupational Dose Assessment71124.04 10/17/2016 10/21/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 3 02/23/2016 12:18:40 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 01/01/2016-12/31/201771124-RADIATION PROTECTION 1 1 IP Radiation Monitoring Instrumentation71124.05 10/17/2016 10/21/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/12/2016 12/16/2016 1 IP Occupational ALARA Planning and Controls71124.02 12/12/2016 12/16/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 12/12/2016 12/16/2016 1 IP Occupational Dose Assessment71124.04 12/12/2016 12/16/2016 1 IP Radiation Monitoring Instrumentation71124.05 12/12/2016 12/16/2016 1 IP Occupational Exposure Control Effectiveness71151-OR01 12/12/2016 12/16/2016 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 12/12/2016 12/16/201671152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 01/30/2017 02/03/2017 1 IP Problem Identification and Resolution71152B 02/13/2017 02/17/2017 MODS-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/13/2017 03/17/2017 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/27/2017 03/31/2017 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 05/15/2017 05/19/2017 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/15/2017 05/19/2017 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/15/2017 05/19/2017 1 IP Performance Indicator Verification71151 05/15/2017 05/19/20177111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 06/19/2017 06/23/201771124-RADIATION PROTECTION - EFFLUENTS 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/10/2017 07/14/201771124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 07/24/2017 07/28/2017 1 IP Occupational ALARA Planning and Controls71124.02 07/24/2017 07/28/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 07/24/2017 07/28/2017 1 IP Occupational Dose Assessment71124.04 07/24/2017 07/28/2017 1 IP Radiation Monitoring Instrumentation71124.05 07/24/2017 07/28/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 1 1 IP Operation Of An ISFSI 60855 08/07/201708/11/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 3     Hope Creek 02/23/2016 12:18:40   Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site ISFSI - ISFSI LOADING CAMPAIGN INSPECTION      1 1 08/07/2017 08/11/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants T1-191 - FUKUSHIMA LESSONS-LEARNED      1 1 08/21/2017 08/25/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RADIATION PROTECTION      1 1 10/02/2017 10/06/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/02/2017 10/06/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 10/02/2017 10/06/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/02/2017 10/06/2017 IP 71124.04 Occupational Dose Assessment 1 10/02/2017 10/06/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124.08 - RADWASTE        1 1 12/04/2017 12/08/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION PROTECTION       1 1 12/04/2017 12/09/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/04/2017 12/09/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 12/04/2017 12/09/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/04/2017 12/09/2017 IP 71124.04 Occupational Dose Assessment 1 12/04/2017 12/09/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/04/2017 12/09/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.


Page 3 of 3 02/23/2016 12:18:40 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Hope CreekInspection / Activity Plan 01/01/2016-12/31/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/07/201708/11/2017T1-191-FUKUSHIMA LESSONS-LEARNED 1 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 08/21/2017 08/25/201771124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/02/2017 10/06/2017 1 IP Occupational ALARA Planning and Controls71124.02 10/02/2017 10/06/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/02/2017 10/06/2017 1 IP Occupational Dose Assessment71124.04 10/02/2017 10/06/2017 1 IP Radiation Monitoring Instrumentation71124.05 10/02/2017 10/06/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 12/04/2017 12/08/201771124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 12/04/2017 12/09/2017 1 IP Occupational ALARA Planning and Controls71124.02 12/04/2017 12/09/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 12/04/2017 12/09/2017 1 IP Occupational Dose Assessment71124.04 12/04/2017 12/09/2017 1 IP Occupational Exposure Control Effectiveness71151-OR01 12/04/2017 12/09/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 12/04/2017 12/09/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 22:46, 30 October 2019

ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006)
ML16055A328
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/02/2016
From: Fred Bower
Reactor Projects Branch 3
To: Braun R
Public Service Enterprise Group
BOWER, FL
Shared Package
ML16039A082 List:
References
IR 2015006
Download: ML16055A328 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 2, 2016 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2015006)

Dear Mr. Braun:

On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. As discussed below, the NRC will also perform Temporary Instruction (TI) 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Hope Creek, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans.

From January 1 to December 31, 2015, the NRC issued three SL-IV traditional enforcement violations associated with impeding the regulatory process. The violations occurred over a 17 year period, and therefore the NRC has decided not to perform IP 92723, Follow-up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, Section 13.02.b, the NRC will follow up one of the violations through a baseline inspection (71111.11B) listed in the enclosed inspection plan and the second through IP 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders. Follow-up for the third violation was already completed through baseline inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 Enclosure: Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16055A328 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP NAME JHawkins/MXD per telecon MDraxton/ MXD FBower/ FLB DATE 02/22 /16 02/23 /16 02/ 23 /16

Page 1 of 3 Hope Creek 02/23/2016 12:18:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TRI FI - TRIENNIAL FIRE PROTECTION 4 1 03/14/2016 03/18/2016 IP 7111105T Fire Protection [Triennial]

1 03/28/2016 04/01/2016 IP 7111105T Fire Protection [Triennial]

EP - EP EXERCISE EVALUATION 1 1 05/16/2016 05/20/2016 IP 7111401 Exercise Evaluation EXM8/15 - HOPE CREEK INITIAL EXAMINATION 5 1 07/18/2016 07/22/2016 U01925 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 1 08/22/2016 09/02/2016 U01925 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 92702 - IP 92702 1 1 05/23/2016 05/26/2016 IP 92702 Followup On Corrective Actions For Violations And Deviations 71124 - ENVIRONMENTAL 1 1 06/06/2016 06/10/2016 IP 71124.07 Radiological Environmental Monitoring Program 71124 - RADIATION PROTECTION 1 1 06/20/2016 06/24/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/20/2016 06/24/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 06/20/2016 06/24/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/20/2016 06/24/2016 IP 71124.04 Occupational Dose Assessment 1 06/20/2016 06/24/2016 IP 71124.05 Radiation Monitoring Instrumentation 7111111B - HOPE CREEK REQUAL INSP W/ P/F RESULTS 2 1 09/12/2016 09/16/2016 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION PROTECTION 1 1 09/12/2016 09/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 09/12/2016 09/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/12/2016 09/16/2016 IP 71124.04 Occupational Dose Assessment 1 09/12/2016 09/16/2016 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - INSERVICE INSPECTION 1 1 10/17/2016 10/21/2016 IP 7111108G Inservice Inspection Activities - BWR 71124 - RADIATION PROTECTION 1 1 10/17/2016 10/21/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/17/2016 10/21/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/17/2016 10/21/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/17/2016 10/21/2016 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Hope Creek 02/23/2016 12:18:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIATION PROTECTION 1 1 10/17/2016 10/21/2016 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION PROTECTION 1 1 12/12/2016 12/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/12/2016 12/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 12/12/2016 12/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/12/2016 12/16/2016 IP 71124.04 Occupational Dose Assessment 1 12/12/2016 12/16/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 12/12/2016 12/16/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/12/2016 12/16/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71152B - PI&R BIENNIAL 1 1 01/30/2017 02/03/2017 IP 71152B Problem Identification and Resolution 1 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution MODS - PERMANENT PLANT MODIFICATIONS 3 1 03/13/2017 03/17/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 03/27/2017 03/31/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP - EP PROGRAM INSPECTION 1 1 05/15/2017 05/19/2017 IP 7111402 Alert and Notification System Testing 1 05/15/2017 05/19/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/15/2017 05/19/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 05/15/2017 05/19/2017 IP 71151 Performance Indicator Verification 7111107T - TRIENNIAL HEAT SINK 1 1 06/19/2017 06/23/2017 IP 7111107T Heat Sink Performance 71124 - RADIATION PROTECTION - EFFLUENTS 1 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - RADIATION PROTECTION 1 1 07/24/2017 07/28/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/24/2017 07/28/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 07/24/2017 07/28/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/24/2017 07/28/2017 IP 71124.04 Occupational Dose Assessment 1 07/24/2017 07/28/2017 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1 08/07/2017 08/11/2017 IP 60855 Operation Of An ISFSI This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Hope Creek 02/23/2016 12:18:40 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1 08/07/2017 08/11/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants T1-191 - FUKUSHIMA LESSONS-LEARNED 1 1 08/21/2017 08/25/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RADIATION PROTECTION 1 1 10/02/2017 10/06/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/02/2017 10/06/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 10/02/2017 10/06/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/02/2017 10/06/2017 IP 71124.04 Occupational Dose Assessment 1 10/02/2017 10/06/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124.08 - RADWASTE 1 1 12/04/2017 12/08/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION PROTECTION 1 1 12/04/2017 12/09/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/04/2017 12/09/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 12/04/2017 12/09/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/04/2017 12/09/2017 IP 71124.04 Occupational Dose Assessment 1 12/04/2017 12/09/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/04/2017 12/09/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.