| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION |
|
| |
|
| KING OF PRUSSIA, PA 19406-2713 August 28, 2017 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC | | ==REGION I== |
| - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORTS 05000272/201 7 00 5 AND 05000311/201 7005) | | 2100 RENAISSANCE BLVD. |
| | |
| | KING OF PRUSSIA, PA 19406-2713 August 28, 2017 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORTS 05000272/2017005 AND 05000311/2017005) |
|
| |
|
| ==Dear Mr. Sena:== | | ==Dear Mr. Sena:== |
| The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 , for Salem Nuclear Generating Station , Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. | | The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Salem Nuclear Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. |
| | |
| | As previously noted in the annual assessment letter dated March 1, 2017 (Report 05000272; 311/2016006; ADAMS Accession No.: ML17058A401 1) in addition to baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, for Unit 2. |
| | |
| | PSEG has notified Region I of their readiness for this inspection and the onsite inspection is currently planned to begin on September 11, 2017. |
|
| |
|
| As previously noted in the annual assessment letter dated March 1, 2017 (Report 05000272; 311/2016006; ADAMS Accession No.: ML17058A401 1) in addition to baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs," for Unit 2. PSEG has notified Region I of their readiness for this inspection and the onsite inspection is currently planned to begin on September 11, 2017.
| | The NRC will also be performing IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants and Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. |
|
| |
|
| The NRC will also be performing IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants" and Temporary Instruction 2515/19 1 , "Inspection o f t he Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders a nd Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans
| | 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter. |
| ."
| |
| 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter | |
| . | |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. | | /RA/ |
| | Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75 Enclosure: Salem Inspection Plan cc: Distribution via ListServ |
| | |
| | ML17233A019 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PFinney/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 |
| | |
| | Page 1 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - SALEM REQUAL INSP WITH P/F RESULTS 2 1, 2 09/12/2017 09/16/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 1, 2 09/12/2017 09/16/2017 IP 7111111B Licensed Operator Requalification Program 71152B - PI&R BIENNIAL 5 1, 2 08/28/2017 09/01/2017 IP 71152B Problem Identification and Resolution 1/22EXM - SALEM INITIAL OL EXAM 4 1 12/11/2017 12/15/2017 U01949 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM 1 01/22/2018 02/02/2018 U01949 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM 71124.06 - RETS 1 1, 2 08/28/2017 09/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment SUPP - 95001 - WHITE PI FOR SCRAMS PER 7000 HRS 3 2 09/11/2017 09/15/2017 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area TI-191 - FUKUSHIMA LESSONS LEARNED 7 1, 2 09/18/2017 09/22/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RAD PROTECTION 1 1 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U1 INSERVICE INSPECTION 1 1 10/23/2017 11/03/2017 IP 7111108P Inservice Inspection Activities - PWR 71124.08 - RADWASTE 1 1, 2 12/04/2017 12/08/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 12/04/2017 12/08/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/04/2017 12/08/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111105T - TRIENNIAL FIRE PROTECTION 4 1, 2 02/12/2018 02/16/2018 IP 7111105T Fire Protection [Triennial] |
| | 1, 2 02/26/2018 03/02/2018 IP 7111105T Fire Protection [Triennial] |
| | 71124 - BASELINE HP 1 1, 2 02/26/2018 03/02/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/26/2018 03/02/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/26/2018 03/02/2018 IP 71124.04 Occupational Dose Assessment 1/14EXAM - SALEM INITIAL OL EXAM 4 1 11/26/2018 11/30/2018 U01964 FY19- SALEM INITIAL OPERATOR LICENSING EXAM 1 01/14/2019 01/25/2019 U01964 FY19- SALEM INITIAL OPERATOR LICENSING EXAM This report does not include INPO and OUTAGE activities. |
| | |
| | This report shows only on-site and announced inspection procedures. |
|
| |
|
| 50-272 and 50-311 License Nos. | | Page 2 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE INSPECTION 4 1, 2 05/21/2018 05/25/2018 IP 7111401 Exercise Evaluation 7111117T - 50.59 PROCESS 3 1, 2 04/30/2018 05/04/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments 71124 - BASELINE HP 1 1, 2 05/21/2018 05/25/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/21/2018 05/25/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/21/2018 05/25/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 06/18/2018 06/22/2018 IP 60855 Operation Of An ISFSI 1, 2 06/18/2018 06/22/2018 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124.07 - REMP 1 1, 2 06/25/2018 06/29/2018 IP 71124.07 Radiological Environmental Monitoring Program 71124.06 - RETS & PI VERIFICATION 1 1, 2 09/10/2018 09/14/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/10/2018 09/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/10/2018 09/14/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences U2 ISI - UNIT 2 INSERVICE INSPECTION 2 2 10/22/2018 11/02/2018 IP 7111108P Inservice Inspection Activities - PWR 71124 - BASELINE HP 1 1 10/29/2018 11/02/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/29/2018 11/02/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.04 Occupational Dose Assessment 71152B - PI&R BIENNIAL 1 1, 2 01/28/2019 02/01/2019 IP 71152B Problem Identification and Resolution 1, 2 02/11/2019 02/15/2019 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 2 1, 2 02/11/2019 02/15/2019 IP 7111402 Alert and Notification System Testing 1, 2 02/11/2019 02/15/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 02/11/2019 02/15/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 02/11/2019 02/15/2019 IP 71151 Performance Indicator Verification 71124 - HP 1 1, 2 02/04/2019 02/08/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/04/2019 02/08/2019 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities. |
|
| |
|
| DPR 70 and DPR 75 Enclosure:
| | This report shows only on-site and announced inspection procedures. |
| Salem Inspection Plan cc: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORTS 05000272/201 7 00 5 AND 05000311/201 7005) DATED AUGUST 28, 2017 DISTRIBUTION w/encl
| |
| : DDorman, RA (R1ORAMAIL Res)
| |
| DLew, DRA (R1ORAMAIL Res)
| |
| RLorson, DRP (R1DRPMAIL Res)
| |
| DPelton, DRP (R1DRPMAIL Res)
| |
| JYerokun, DRS (R1DRSMAIL Res)
| |
| BWelling, DRS (R1DRSMAIL RES)
| |
| FBower, DRP RBarkley, DRP MDraxton, DRP PFinney, DRP, SRI AZiedonis, DRP, RI COtt, DRP, AA JBowen, RI, OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource ROPreports Resourc e DOCUMENT NAME:
| |
| S:\ROP Assessment Meetings
| |
| \ROP-18 Second Quarter Process
| |
| \Branch 3\ROP 18 Inspection Plan Letter SAL FINAL.docx ADAMS ACCESSION NUMBER:
| |
| ML17233A019 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PFinney/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17 OFFICIAL RECORD CO PY Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 08/29/2017-06/30/2019 Page 1 of 3 08/29/2017 09:40:007111111B-SALEM REQUAL INSP WITH P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program - Annual Review7111111A 09/12/2017 09/16/2017 1, 2 IP Licensed Operator Requalification Program7111111B 09/12/2017 09/16/201771152B-PI&R BIENNIAL 5 1, 2 IP Problem Identification and Resolution71152B 08/28/2017 09/01/2017 1/22EXM-SALEM INITIAL OL EXAM 4 1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U0194912/11/2017 12/15/2017 1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 01/22/2018 02/02/201871124.06-RETS 1 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/28/2017 09/01/2017 SUPP-95001 - WHITE PI FOR SCRAMS PER 7000 HRS 3 2 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 9500109/11/2017 09/15/2017TI-191-FUKUSHIMA LESSONS LEARNED 7 1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 09/18/2017 09/22/201771124-RAD PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/23/2017 10/27/2017 1 IP Occupational ALARA Planning and Controls71124.02 10/23/2017 10/27/20177111108P-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/23/201711/03/201771124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 12/04/2017 12/08/2017 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 12/04/2017 12/08/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 12/04/2017 12/08/20177111105T-TRIENNIAL FIRE PROTECTION 4 1, 2 IP Fire Protection [Triennial]7111105T 02/12/2018 02/16/2018 1, 2 IP Fire Protection [Triennial]7111105T 02/26/2018 03/02/201871124-BASELINE HP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/26/2018 03/02/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 02/26/2018 03/02/2018 1, 2 IP Occupational Dose Assessment71124.04 02/26/2018 03/02/20181/14EXAM-SALEM INITIAL OL EXAM 4 1 FY19- SALEM INITIAL OPERATOR LICENSING EXAM U0196411/26/201811/30/2018 1 FY19- SALEM INITIAL OPERATOR LICENSING EXAM U01964 01/14/2019 01/25/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| |
|
| |
|
| Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 08/29/2017-06/30/2019 Page 2 of 3 08/29/2017 09:40:00 EP-EP EXERCISE INSPECTION 4 1, 2 IP Exercise Evaluation7111401 05/21/2018 05/25/20187111117T-50.59 PROCESS 3 1, 2 IP Evaluations of Changes, Tests, and Experiments7111117T 04/30/2018 05/04/201871124-BASELINE HP 1 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/21/2018 05/25/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 05/21/2018 05/25/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/21/2018 05/25/2018 ISFSI-ISFSI OPERATIONAL INSPECTION 2 1, 2 IP Operation Of An ISFSI 60855 06/18/2018 06/22/2018 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/18/2018 06/22/201871124.07-REMP 1 1, 2 IP Radiological Environmental Monitoring Program71124.07 06/25/2018 06/29/201871124.06-RETS & PI VERIFICATION 1 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 09/10/2018 09/14/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/10/2018 09/14/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/10/2018 09/14/2018 U2 ISI-UNIT 2 INSERVICE INSPECTION 2 2 IP Inservice Inspection Activities - PWR7111108P 10/22/201811/02/201871124-BASELINE HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/29/201811/02/2018 1 IP Occupational ALARA Planning and Controls71124.02 10/29/201811/02/2018 1, 2 IP Occupational Dose Assessment71124.04 10/29/201811/02/201871152B-PI&R BIENNIAL 1 1, 2 IP Problem Identification and Resolution71152B 01/28/2019 02/01/2019 1, 2 IP Problem Identification and Resolution71152B02/11/2019 02/15/2019 EP-EP PROGRAM INSPECTION 2 1, 2 IP A lert and Notification System Testing711140202/11/2019 02/15/2019 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System711140302/11/2019 02/15/2019 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140502/11/2019 02/15/2019 1, 2 IP Performance Indicator Verification7115102/11/2019 02/15/201971124-HP 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/04/2019 02/08/2019 1, 2 IP Occupational ALARA Planning and Controls71124.02 02/04/2019 02/08/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | Page 3 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 1 04/15/2019 04/19/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls U1 ISI - INSERVICE INSPECTION - UNIT 1 1 1 04/15/2019 04/26/2019 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. |
|
| |
|
| Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SalemInspection / Activity Plan 08/29/2017-06/30/2019 Page 3 of 3 08/29/2017 09:40:0071124-HP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/15/2019 04/19/2019 U1 ISI-INSERVICE INSPECTION - UNIT 1 1 1 IP Inservice Inspection Activities - PWR7111108P 04/15/2019 04/26/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
| }} | | }} |
Similar Documents at Salem |
---|
Category:Inspection Plan
MONTHYEARIR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) ML22234A0362022-08-22022 August 2022 Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20224022022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005) ML20077L3492020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000272/20190062020-03-0303 March 2020 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006) IR 05000272/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005) IR 05000272/20180062019-03-0404 March 2019 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006) IR 05000272/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005) IR 05000272/20170062018-02-28028 February 2018 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501 IR 05000272/20170052017-08-28028 August 2017 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005) IR 05000272/20160062017-03-0101 March 2017 Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006) IR 05000272/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) IR 05000272/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006) IR 05000272/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005) IR 05000272/20140012015-03-0404 March 2015 ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001) IR 05000272/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006 IR 05000272/20130012014-03-0404 March 2014 ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan IR 05000272/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 IR 05000272/20120012013-03-0404 March 2013 Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001) ML12248A0402012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20110012012-03-0505 March 2012 Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001) ML1124112942011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20100012011-03-0404 March 2011 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) ML1024403642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2 ML1029505872010-03-12012 March 2010 Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan. ML1006208082010-03-0303 March 2010 EOC Letter and Report 22 ML0924403092009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009) IR 05000272/20090012009-03-0404 March 2009 Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) IR 05000272/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) ML0734706552007-12-13013 December 2007 ROP 8 - Salem - Change to Inspection Plan, 12/13/07 ML0724309472007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000272/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) ML0624306512006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station IR 07200200/19600012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001) ML0406307982004-03-0303 March 2004 2003-04 Annual Assessment Letter - Salem ML0323905112003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2 ML0306206932003-03-0303 March 2003 2003 Annual Assessment Letter - Salem Nuclear Generating Station 2024-08-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20230402023-05-0202 May 2023 And Salem Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023420, 05000272/202340 and 05000311/2023420 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) IR 05000272/20220022022-08-0808 August 2022 Integrated Inspection Report 05000272/2022002 and 05000311/2022002 IR 05000272/20224012022-07-21021 July 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000272/20220012022-05-0404 May 2022 Integrated Inspection Report 05000272/2022001 and 05000311/2022001 IR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20224022022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210042022-02-10010 February 2022 Integrated Inspection Report 05000272/2021004 and 05000311/2021004 IR 05000272/20215012021-11-30030 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000272/20210032021-11-0202 November 2021 Integrated Inspection Report 05000272/2021003 and 05000311/2021003 IR 05000272/20214032021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000272/20210122021-10-28028 October 2021 And Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000272/2021011 and 05000311/2021011 IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20210022021-08-18018 August 2021 Reissued Integrated Inspection Report 05000272/2021002 and 05000311/2021002 ML21222A1402021-08-11011 August 2021 Integrated Inspection Report 05000272/2021002 and 05000311/2021002 IR 05000272/20210012021-05-0505 May 2021 Integrated Inspection Report 05000272/2021001 and 05000311/2021001 IR 05000272/20210102021-03-0909 March 2021 Triennial Fire Protection Inspection Report 05000272/2021010 and 05000311/2021010 IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) IR 05000272/20214012021-02-23023 February 2021 and Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only) 2024-09-23
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] |
Inspection Report - Salem - 2017005 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 August 28, 2017 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORTS 05000272/2017005 AND 05000311/2017005)
Dear Mr. Sena:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Salem Nuclear Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
As previously noted in the annual assessment letter dated March 1, 2017 (Report 05000272; 311/2016006; ADAMS Accession No.: ML17058A401 1) in addition to baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, for Unit 2.
PSEG has notified Region I of their readiness for this inspection and the onsite inspection is currently planned to begin on September 11, 2017.
The NRC will also be performing IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants and Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-272 and 50-311 License Nos. DPR 70 and DPR 75 Enclosure: Salem Inspection Plan cc: Distribution via ListServ
ML17233A019 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PFinney/per email MD MDraxton FBower DATE 8/17/17 8/17/17 8/21/17
Page 1 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - SALEM REQUAL INSP WITH P/F RESULTS 2 1, 2 09/12/2017 09/16/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 1, 2 09/12/2017 09/16/2017 IP 7111111B Licensed Operator Requalification Program 71152B - PI&R BIENNIAL 5 1, 2 08/28/2017 09/01/2017 IP 71152B Problem Identification and Resolution 1/22EXM - SALEM INITIAL OL EXAM 4 1 12/11/2017 12/15/2017 U01949 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM 1 01/22/2018 02/02/2018 U01949 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM 71124.06 - RETS 1 1, 2 08/28/2017 09/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment SUPP - 95001 - WHITE PI FOR SCRAMS PER 7000 HRS 3 2 09/11/2017 09/15/2017 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area TI-191 - FUKUSHIMA LESSONS LEARNED 7 1, 2 09/18/2017 09/22/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RAD PROTECTION 1 1 10/23/2017 10/27/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/23/2017 10/27/2017 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U1 INSERVICE INSPECTION 1 1 10/23/2017 11/03/2017 IP 7111108P Inservice Inspection Activities - PWR 71124.08 - RADWASTE 1 1, 2 12/04/2017 12/08/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 12/04/2017 12/08/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/04/2017 12/08/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111105T - TRIENNIAL FIRE PROTECTION 4 1, 2 02/12/2018 02/16/2018 IP 7111105T Fire Protection [Triennial]
1, 2 02/26/2018 03/02/2018 IP 7111105T Fire Protection [Triennial]
71124 - BASELINE HP 1 1, 2 02/26/2018 03/02/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/26/2018 03/02/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/26/2018 03/02/2018 IP 71124.04 Occupational Dose Assessment 1/14EXAM - SALEM INITIAL OL EXAM 4 1 11/26/2018 11/30/2018 U01964 FY19- SALEM INITIAL OPERATOR LICENSING EXAM 1 01/14/2019 01/25/2019 U01964 FY19- SALEM INITIAL OPERATOR LICENSING EXAM This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE INSPECTION 4 1, 2 05/21/2018 05/25/2018 IP 7111401 Exercise Evaluation 7111117T - 50.59 PROCESS 3 1, 2 04/30/2018 05/04/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments 71124 - BASELINE HP 1 1, 2 05/21/2018 05/25/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/21/2018 05/25/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/21/2018 05/25/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation ISFSI - ISFSI OPERATIONAL INSPECTION 2 1, 2 06/18/2018 06/22/2018 IP 60855 Operation Of An ISFSI 1, 2 06/18/2018 06/22/2018 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124.07 - REMP 1 1, 2 06/25/2018 06/29/2018 IP 71124.07 Radiological Environmental Monitoring Program 71124.06 - RETS & PI VERIFICATION 1 1, 2 09/10/2018 09/14/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/10/2018 09/14/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 09/10/2018 09/14/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences U2 ISI - UNIT 2 INSERVICE INSPECTION 2 2 10/22/2018 11/02/2018 IP 7111108P Inservice Inspection Activities - PWR 71124 - BASELINE HP 1 1 10/29/2018 11/02/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/29/2018 11/02/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.04 Occupational Dose Assessment 71152B - PI&R BIENNIAL 1 1, 2 01/28/2019 02/01/2019 IP 71152B Problem Identification and Resolution 1, 2 02/11/2019 02/15/2019 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 2 1, 2 02/11/2019 02/15/2019 IP 7111402 Alert and Notification System Testing 1, 2 02/11/2019 02/15/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 02/11/2019 02/15/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 02/11/2019 02/15/2019 IP 71151 Performance Indicator Verification 71124 - HP 1 1, 2 02/04/2019 02/08/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/04/2019 02/08/2019 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Salem 08/29/2017 09:40:00 Inspection / Activity Plan Report 22 08/29/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP 1 1 04/15/2019 04/19/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls U1 ISI - INSERVICE INSPECTION - UNIT 1 1 1 04/15/2019 04/26/2019 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.