UNITED STATES NUCLEAR REGULATORY COMMISSION ber 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2013006 AND 05000311/2013006)

Dear Mr. Joyce:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Salem operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We note that on July 26, 2013, the NRC issued a letter to PSEG on the potential impact of a U.S. District Court jury finding of retaliation on the work environment at Salem and Hope Creek.

We are currently in the process of reviewing your August 22, 2013, response to that letter and will notify you of the results of that review.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

Glenn T. Dentel Chief Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-272, 50-311 License Nos.: DPR-70, DPR-75 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13240A089 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt PFinney/ PF via email MDraxton/ MD GDentel/ GTD DATE 08/ 26/13 08/ 26/13 09/ 03 /13

Page 1 of 2 Salem 08/05/2013 11:35:12 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PI&R 7 1, 2 07/15/2013 07/19/2013 IP 71152B Problem Identification and Resolution 1, 2 07/29/2013 08/02/2013 IP 71152B Problem Identification and Resolution 7111111B - SALEM REQUAL INSPECTION WITH P/F RESULTS 2 1, 2 09/16/2013 09/20/2013 IP 7111111B Licensed Operator Requalification Program HP - RADIATION SAFETY INSPECTION 1 1, 2 08/12/2013 08/16/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 08/12/2013 08/16/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 08/12/2013 08/16/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/12/2013 08/16/2013 IP 71124.04 Occupational Dose Assessment 1, 2 08/12/2013 08/16/2013 IP 71124.05 Radiation Monitoring Instrumentation 7111117 - PERMANENT PLANT MODIFICATIONS 3 1, 2 11/04/2013 11/08/2013 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 11/18/2013 11/22/2013 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111107T - TRIENNIAL HEAT SINK 1 1, 2 12/02/2013 12/06/2013 IP 7111107T Heat Sink Performance 71124.08 - RADWASTE 1 1, 2 12/02/2013 12/06/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation HP - RADIATION SAFETY INSPECTION 1 1, 2 12/09/2013 12/13/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/09/2013 12/13/2013 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 12/09/2013 12/13/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/09/2013 12/13/2013 IP 71124.04 Occupational Dose Assessment 1, 2 12/09/2013 12/13/2013 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/09/2013 12/13/2013 IP 71151-OR01 Occupational Exposure Control Effectiveness 71124 - RAD SAFETY INSPECTION 1 2 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls 2 03/03/2014 03/07/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 03/03/2014 03/07/2014 IP 71124.04 Occupational Dose Assessment 1, 2 03/03/2014 03/07/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSPECTION 1 1, 2 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Salem 08/05/2013 11:35:12 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD SAFETY INSPECTION 1 1, 2 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 1, 2 04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 7111108P - U2 INSERVICE INSPECTION 1 2 04/21/2014 05/02/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - REMP 1 1, 2 05/19/2014 05/23/2014 IP 71124.07 Radiological Environmental Monitoring Program EP EXER - EP EXERCISE INSPECTION 1 1, 2 05/19/2014 05/23/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1, 2 06/02/2014 06/06/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping CDBI - CDBI 7 1, 2 07/07/2014 07/10/2014 IP 7111121 Component Design Bases Inspection 1, 2 07/21/2014 07/25/2014 IP 7111121 Component Design Bases Inspection 1, 2 08/04/2014 08/08/2014 IP 7111121 Component Design Bases Inspection 12/8EXAM - SALEM INITIAL EXAM 4 1 11/10/2014 11/14/2014 U01894 FY15-SALEM INITIAL OPERATOR LICENSING EXAM 1 12/08/2014 12/19/2014 U01894 FY15-SALEM INITIAL OPERATOR LICENSING EXAM INSP - RADIATION PROTECTION 1 1, 2 09/29/2014 10/03/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/29/2014 10/03/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/29/2014 10/03/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/29/2014 10/03/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/29/2014 10/03/2014 IP 71124.05 Radiation Monitoring Instrumentation 7111108P - U1 INSERVICE INSPECTION 1 1 10/20/2014 10/31/2014 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.