Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station
ML062430651
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/31/2006
From: Collins S
Region 1 Administrator
To: Levis W
Public Service Enterprise Group
Gray M
References
Download: ML062430651 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. William Levis Senior Vice President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SALEM NUCLEAR GENERATING STATION

Dear Mr. Levis:

On August 8, 2006, the NRC staff completed its safety performance review of the Salem Nuclear Generating Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This safety performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the results of our physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Salem Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

In our annual assessment letter dated March 2, 2006, we advised you that a substantive cross-cutting issue in the area of safety conscious work environment (SCWE) continued. This was based on the results of our team inspection of SCWE completed in September 2005, which determined that while progress had been made, there remained some issues that required additional action. Our letter also stated that the NRC would evaluate the SCWE substantive cross-cutting issue for closure after you provided the results of an assessment that concluded that substantial, sustainable progress had been made in the work environment, and the NRC had completed a review which confirmed those results. During the first six months of 2006, we noted that you conducted a safety culture survey which indicated improvement in nearly all cultural metrics when compared to the results of a previous survey in 2005. Additionally, you completed a peer assessment of your work environment which concluded that substantial, sustainable progress had been made. The results of this assessment were provided to the NRC in a letter dated May 4, 2006. The NRC reviewed the assessment report, and in June 2006, completed a team inspection of SCWE. Our inspection report, dated July 31, 2006, documents our conclusion that you have made substantial progress in improving the SCWE, and that programs are in place to sustain this progress.

W. Levis 2 As part of our mid-year assessment, we reviewed the results of team inspections, the trend in quarterly SCWE metrics submitted to the NRC, the number and nature of allegations received during the assessment period, and the significance and characteristics of inspection findings to determine whether this information indicated improvement in the SCWE. Our reviews confirmed that there has been substantial and sustained progress in improving the SCWE at the Salem station. Based on these results, and your ongoing improvement actions, we have concluded that the substantive cross-cutting issue in the SCWE area is closed. We will continue to monitor your performance in this area during NRC baseline inspections. For example, the NRC plans to review recommendations from the independent peer assessment of the SCWE, which are tracked in your corrective action program, through a baseline problem identification and resolution inspection sample.

Additionally, we have determined that the Reactor Oversight Process (ROP) Deviation Memorandum dated July 29, 2005, does not need to be renewed, and that Salem should receive a normal level of NRC oversight, consistent with the ROP Action Matrix. We have determined that the criteria for closure of the Deviation Memorandum have been satisfied, specifically that substantial, sustainable improvements in the SCWE have been achieved.

Therefore, we plan to conduct ROP baseline inspections at your facility, with some inspection samples focused on your specific actions to sustain improvements in SCWE.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised based on our end-of-cycle safety performance review.

For your information, during the evening of September 14, 2006, the NRC staff will be available to meet with members of the public at a location in the vicinity of the plant to discuss the process used to determine closure of the substantive cross-cutting issue in SCWE and return to normal NRC oversight. The time and location of this information session will be available on the NRC website, under "Public Meetings."

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

W. Levis 3 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Mel Gray at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Samuel J. Collins Regional Administrator Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75

Enclosure:

Salem Units 1 and 2 Inspection/Activity Plan cc w/encl:

T. Joyce, Site Vice President - Salem D. Winchester, Vice President Nuclear Assessments W. F. Sperry, Director Business Support D. Benyak, Director - Regulatory Assurance C. J. Fricker, Salem Plant Manager J. J. Keenan, Esquire M. Wetterhahn, Esquire F. Pompper, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, Radiation Protection and Release Prevention, State of New Jersey K. Tosch, Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware Consumer Advocate, Office of Consumer Advocate N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

W. Levis 4 Distribution w/encl:

S. Collins, RA M. Dapas, DRA B. Holian, DRP A. Blough, DRS D. Lew, DRP M. Gamberoni, DRS M. Gray, DRP B. Welling, DRP D. Schroeder, DRP - NRC Senior Resident Inspector K. Venuto, DRP - Resident OA R. Lorson, DRS J. White, DRS M. Sykes, DRS L. Doerflein, DRS J. Rogge, DRS J. Segala, DRS B. Sosa, RI OEDO D. Roberts, NRR D. Collins, NRR S. Bailey, NRR T. Valentine, NRR RidsNrrDirsIpab@nrc.gov Region I Docket Room (with concurrences)

Institute of Nuclear Power Operations (INPO)

DOCUMEN T NA ME: S :\ROP 7 Mid C ycle Re view\2 006 R OP7 Mid-Cycle Letters\S alem RO P7 Mid-Cycle Assessm ent Ltr rev 2.wpd SUNSI Review Complete: __BDW_____ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP RI/RA NAME BWelling MGray/BDW BHolian SCollins DATE 08/29/06 08/29/06 08/30/06 08/31/06 OFFICIAL RECORD COPY

Page 1 of 2 Salem 08/31/2006 09:44:31 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/16/2006 10/20/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/16/2006 10/20/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/16/2006 10/20/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/16/2006 10/20/2006 Baseline Inspections 7111108P - INSERVICE INSPECTION - UNIT 2 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/27/2006 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS - UNIT 2 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/22/2006 10/30/2006 Safety Issues 12/11EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01663 FY07-SALEM INITIAL OPERATOR EXAM 11/20/2006 11/22/2006 Not Applicable 1 U01663 FY07-SALEM INITIAL OPERATOR EXAM 12/11/2006 12/15/2006 Not Applicable 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/05/2007 02/09/2007 Baseline Inspections 71114 - EP PRGM INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 04/02/2007 04/06/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 04/02/2007 04/06/2007 Baseline Inspections 7111108P - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/02/2007 04/13/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/09/2007 04/13/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/09/2007 04/13/2007 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/16/2007 04/20/2007 Safety Issues 7111111B - L.O. REQUAL. PROG. + P/F REVIEW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 08/13/2007 08/17/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Salem 08/31/2006 09:44:31 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111117B - MODS AND 50.59 5 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 07/16/2007 07/20/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/20/2007 08/24/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/20/2007 08/24/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/17/2007 09/21/2007 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 12/03/2007 12/14/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/07/2008 01/11/2008 Baseline Inspections 7111121 - CDBI 7 1, 2 IP 7111121 Component Design Bases Inspection 01/14/2008 01/18/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 01/28/2008 02/01/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 02/04/2008 02/08/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.