IR 05000272/2017404

From kanterella
Jump to navigation Jump to search
NRC Material Control and Accounting Program Inspection Report 05000272/2017404 and 05000311/2017404 Public Document Dated January 2, 2018
ML18003A216
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/02/2018
From: Mel Gray
Engineering Region 1 Branch 1
To: Sena P
Public Service Enterprise Group
References
IR 2017404
Download: ML18003A216 (3)


Text

ary 2, 2018

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000272/2017404 AND 05000311/2017404

Dear Mr. Sena:

On December 14, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Salem Nuclear Generating Station (Salem), Units 1 and 2 and discussed the results of this inspection with Mr. Patrick Martino, Salem Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with Title 10 of Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-272 and 50-311 License No.: DPR-70 and DPR-75 Nonpublic Enclosure:

Inspection Report 05000272/2017404 and 05000311/2017404 w/Attachment: Supplementary Information cc w/o encl; w/o OUO-SRI:

Distribution via ListServ cc w/encl; w/OUO-SRI or SGI:

RDeSanctis, Director of Security PBaldauf, Director, NJ Dept. of Environmental Protection FFisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health ML (Cover letter) ML18003A216 ADAMS ACCESSION NUMBER: ML (Cover letter w/enclosure) ML18003A251 Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME EBurket FBower MGray DATE 12/29/17 12/29/17 01/02/187