ML073470655

From kanterella
Jump to navigation Jump to search
ROP 8 - Salem - Change to Inspection Plan, 12/13/07
ML073470655
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/13/2007
From: Arthur Burritt
Reactor Projects Branch 3
To: Levis W
Public Service Electric & Gas Co
BURRITT AL
References
Download: ML073470655 (3)


Text

December 13, 2007 William Levis President and Chief Nuclear Officer PSEG Nuclear LLC 80 Park Plaza, T4B Newark, NJ 07102

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE SALEM NUCLEAR GENERATING STATION

Dear Mr. Levis:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

W. Levis 2 Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket No. 50-272 and 50-311 License No. DPR-70 and DPR-75

Enclosures:

Salem Nuclear Generating Station Inspection/Activity Plans cc w/encl:

T. Joyce, Senior Vice President, Operations R. Braun, Site Vice President K. Chambliss, Vice President, Nuclear Oversight B. Clark, Director of Finance G. Gellrich, Salem Plant Manager J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan, Acting-Manager, NJ Bureau of Nuclear Engineering H. Otto, Ph.D., Admin, DE Interagency Progs, DNREC Div of Water Resources Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

W. Levis 2 Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/ra/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket No. 50-272 and 50-311 License No. DPR-70 and DPR-75

Enclosures:

Salem Nuclear Generating Station Inspection/Activity Plans Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP C. Khan, DRP L. Cline, DRP D. Schroeder, DRP, Sr Resident Inspector H. Balian, DRP, Resident Inspector K. Venuto, DRP, Resident OA G. West, RI OEDO J. Lubinski, NRR H. Chernoff, NRR R. Ennis, NRR, PM J. Shea, NRR, Backup D. Collins, NRR J. Thompson, NRR (JWT1@nrc.gov)

D. Screnci, PAO R. Barkley, ORA D. Holody, ORA SUNSI Review Complete: LC (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH3\ROP 8 Letters\HCGSROPrealignment.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"

= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/LC ABurritt/ALB DATE 12/07/07 12/13/07 OFFICIAL RECORD COPY

Page 1 of 2 Salem 12/11/2007 14:32:17 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/07/2008 01/11/2008 Baseline Inspections S/G - U2 S/G REPLACEMENT 2 2 IP 50001 Steam Generator Replacement Inspection 01/07/2008 04/25/2008 Other Routine 7111108P - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/17/2008 03/28/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 50001 Steam Generator Replacement Inspection 04/07/2008 04/11/2008 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/07/2008 04/11/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/07/2008 04/11/2008 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/07/2008 04/11/2008 Baseline Inspections 2 IP 50001 Steam Generator Replacement Inspection 04/21/2008 04/25/2008 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/21/2008 04/25/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/21/2008 04/25/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/21/2008 04/25/2008 Baseline Inspections 08/25EXM - INITIAL OPERATOR LICENSING EXAM 4 1 U01686 FY08 - SALEM 1 & 2 INITIAL OPERATOR EXAM 07/21/2008 07/25/2008 Not Applicable 1 U01686 FY08 - SALEM 1 & 2 INITIAL OPERATOR EXAM 08/25/2008 08/29/2008 Not Applicable S/G - U2 S/G REPLACEMENT CONTINUED 2 2 IP 50001 Steam Generator Replacement Inspection 04/26/2008 05/09/2008 Other Routine EP - EP EXERCISE EVALUATION 4 1, 2 IP 7111401 Exercise Evaluation 05/19/2008 05/23/2008 EP Baseline Inspectio 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008 EP Baseline Inspectio 1, 2 IP 71151-EP01 Drill/Exercise Performance 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 05/19/2008 05/23/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 05/19/2008 05/23/2008 Baseline Inspections 7111121 - CDBI 10 1, 2 IP 7111121 Component Design Bases Inspection 07/14/2008 07/18/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/28/2008 08/01/2008 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/04/2008 08/08/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/15/2008 09/19/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/15/2008 09/19/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/15/2008 09/19/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/15/2008 09/19/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Salem 12/11/2007 14:32:17 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/15/2008 09/19/2008 Baseline Inspections 71121 - OCC RDA SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/20/2008 10/24/2008 Baseline Inspections 7111108 - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/20/2008 10/31/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.