UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September [, 2011 Mr. Thomas P. Joyce President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

MID-CYCLE LETTER FOR SALEM IIIUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272t2U10Ao and 05000311t2011006)

Dear Mr. Joyce:

On August 11,2011, the NRC completed its mid-cycle performance review of Salem Nuclear Generiting Station. The NRC reviewed the most rdcent quarterly performance indicators (Pls) in addition to inspection results and enforcement acrtions from July 1, 2010, through June 30, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your faCility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Salem Nuclear Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performAnce was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31,2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. ln addition to the baseline inspections, we plan to conduct an inspection of your lSFSl. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff io establish a senior-level agency task force to conduct a methodical and systematic review of the NRCs processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary lnstruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event j' and Tl-184,'Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs)'at your facility. Results of these inspectiorrs can be found here:

http://www.nrc.qov/iapan/iapan-activities.html. Additionally, on May 1 1,2011, the agency issueO NnC guiletin 2Ot 1-01 , "Mitigating Strategies;'1o confirm compliance with Order

T. Joyce EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRC's Task Force made its recommendations to the Comrnission in its report, 'Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actiQns may be warranted' In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

.,.4 l

/ n 'rt7-> n u Ll/r'j Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272, 50-31 1 License Nos. DPR-70, DPR-75

Enclosure:

lnspection Plan cc Mencl: Distribution via ListServ

T. Joyce 2 EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12,2011, the NRCs Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21't Century: The Near-Term Task Force Review of lnsights from the Fukushima DaiichiAccidentl' The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Pubticly Available Reiords (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272, 50-31 1 License Nos. DPR-70, DPR-75

Enclosure:

Inspection Plan cc dencl: Distribution via ListServ Distribution: See attached page SUNSI REVIEW COMPLETE: ALB (Reviewer's Initials) ML112411294 DOCUM ENT NAME: S:\ROP-1 2 M I D-CYC LE REVI E\AABRANCH 3\LEfi ERS(ATTACHMENTI )\

SALEM MID-CYCLE LETTER2OI 1.DOCX After declaring this document "An Official Agency Record" it wilt be released to the Public.

of this document, indicate in box:"C" = Copy w/o attachment/enclosure, E" = Copy w/ attachmenUenclosure"N'=No copy OFFICIAL RECORD COPY

T. Joyce 3 Distribution Mencl:

W. Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAlL Resource)

D. Roberts, DRP (RIDRPMAlL Resource)

J. Clifford, DRP (RIDRPMAlL Resource)

C. Miller, DRS (RlDRSMail Resource)

P. Wilson, DRS (Rl DRSMail Resource)

A. Burritt, DRP L. Cline, DRP A. Turilin, DRP C. Douglas, DRP D. Schroeder, DRP, SRI P. McKenna, DRP, Rl K. McKenzie, DRP, OA J. McHale, Rl OEDO DRS Branch Chiefs (6)

N. McNamara, Rl, SLO D. Tiffi, RI, SLO D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA RidsNrrPMSalem Resource RidsNrrDorllpl 1 -2 Resource ROPreports Resource RidsNrrDirslpab Resource ROPassessment Resource

Page I of 2 Salem 08t29t2011 08:59:34 Inspection I Activity Plan 07t0112011 - 12t31t2012 Report 22 Unit Planned Dates No. of Staff Number Start End on Site O912EXM . OPERATOR LICENSING INITIAL EXAMS 1 08115t201',t 08t19t2011 U01830 FY11- SALEM, lNlTlAL OL EXAM t 09/19/201 1 09t23t2011 U01 830 FY1 1- SALEM, lNlTlAL OL EXAM 71152 - Pl&R

't,2 06127120'11 07101120'11 lP 711528 Problem ldentification and Resolution 1,2 0711812011 07l22l2Af P 711528 Problem ldentification and Resolution 7111118 .SALEM REQUALINSPw/ P/F RESULTS

't,2 0812212011 0812612011 lP 71111'118 Licensed Operator Requalification Program rsFsr - rsFsilNsPEcTroN 1,2 0711512011 081'l9l201'l lP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 . REMP 1,2 07125t2011 0712912011 tP 71124.07 Radiological Environmental Monitoring Program 71124 - HP 1,2 1OE1l2O11 1110412011 lP 25151179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1,2 1013112011 11104120'11 lP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 1013112011 11lO4l2O'11 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 1013112011 1'll04l2011 lP 71124.02 Occupational AtiRA Planning and Controls 1 fiR1t2011 1110412011 lP 71124.Os Radiation Monitoring Inshumentation 7111108P . U1 INSERVICE INSPECTION

,l 1'110712011 1111812011 lP 711'l1OBP Inservice Inspection Activities - PWR 71124 . RADWASTE 1,2 1210512011 120912011 lP 71'l24.Og Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FIRE . TRIENNIAL FIRE PROTECTION INSPECTION 1,2 0112312012 0'112712012 lP 71 11105T Fire Protection [Triennial]

1,2 02106,12012 O2l1Ol2O12 lP 7111105T Fire Protection flriennial]

71124.06 . PUB RAD SAFETY. RETS 1,2 0113012012 02lO3l2O'12 lP 71124.05 Radiation Monitoring Instrumentation 1,2 0113012012 A2lO3l2O12 lP 71 124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - OCC RDASAFEW 1,2 0311212012 0311612012 lP 7'1124.01 Radiological Hazard Assessment and Exposure Controls 1,2 03112120'12 0311612012 lP 71124.02 Occupational ALAM Planning and Controls 1,2 0311212012 0311612012 lP 71124.05 Radiation Monitoring lnstrumentation EP EX - EP EXERCISE EVALUATION 1,2 0512112012 0512512012 lP 7'111401 Exercise Evaluation fhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspeclion procedures,

Page 2 of 2 Salem 0812912011 08:59:34 Inspection / Activity Plan 0710112011 - 12t31t2012 Report 22 No. of EP EX - EP EXERCISE EVALUATION

't,2 05t21t20't2 05125t2012 tP 71114M Emergency Action Level and Emergency Plan Changes 71124 - OCC RAD SAFETY 1,2 06t1112012 06t1512012 tP 71124.02 Occupational ALAM Planning and Controls 1,2 06.t11t2012 o6t15t2012 tP 7'.t't24.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2 06t11t2012 46n5t2012 tP 71124.04 Occupational Dose Assessment 1,2 06t11t2012 06t15t2012 lP 71124.05 Radiation Monitoring Instrumentation 11/19EXM . SALEM INITIAL EXAM 1 10t22t20't2 10n6t2012 u01859 FYl3.SALEM INITIAL OPEMTOR LICENSING EXAM

'l 11119t2012 11t23t2012 u01 859 FY13-SALEM INITIAL OPEMTOR LICENSING EXAM 71'l.24 . RAD SAFETY 1,2 10t22t2012 10t26t2012 tP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2 10t22t2012 10t26t2012 tP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 10t2212012 10t26t2012 tP 71124.02 Occupational ALARA Planning and Controls 1,2 'tot22t20't2 10t26t2012 tP 71151-OR01 Occupational Exposure Control Effectiveness 1,2 10t22t20't2 10t26t2012 tP 71151-PR01 RETS/ODCM Radiological Effluent 71I1108P . U2INSERVICE INSPECTION 2 1022tnt2 't'vg2t2a12 lP 7111108P Inservlce lnspection Activities - PWR